TELUS SIDCModular Data Center Program

Project Partners

Design/Build Approach

Collaborative Design Process

Integrated MEP with Manufacturing

Project CriteriaDevelop One Design for Two SitesDevelop One Design for Two SitesEast: Rimouski, QuebecWest: Kamloops, British Columbia

Create Flexible, Modular Deployment

Install Tier III Infrastructure

Support Variable Rack Densities8 – 40 kw per Rack8 40 kw per Rack

Provide up to 16.2 MW of Critical Power at 20 Year Ultimate Configuration

C t Hi h Effi i D iCreate High Efficiency DesignPUE < 1.2

Achieve LEED Gold Certification

Use Program to Drive IT Innovation and Standardization

The e-Comb® SystemPatented Modular CoolingPatented Modular Cooling System

Developed by Inertech in D b CTDanbury, CT

Can Cool up to 40 kw per Rack

Closed Loop System

Estimated Annual Average gPUE 1.18

The e-Comb® System

Pump Room &Pump Room & Electrical Distribution Electrical Spine

Mechanical Spine S P dp Server Pods

The Base Server ModuleEach Server Module Supports:

Up to 2 700 kw of Critical PowerUp to 2,700 kw of Critical PowerInitial IT Load of 1,135 kw

192 Racks

ServerCirculation Spine

Phase 3

Phase 5Phase 7

Phase 4

Phase 6

Server Modules

Server Modules

FluidCoolers

DRUPS Units

Phase 1 Phase 2FluidCoolers

Phase 1Phase 1

Switchgear RoomOffice/Admin. Area

Site Plan and Phasing

Up to 7 Possible PhasesUp to 7 Possible PhasesUp to 16.2 MW of Critical Power

192 Racks

Main Entrance

ConstructionRimouski, Quebec

Groundbreaking - August, 2011M d l F b i ti St t D b 2011Module Fabrication Starts - December, 2011

First Module Installed - March, 2012Building Completed - July, 2012

Commissioning Completed – August, 2012

Construction

Site Grading & Base Fill @ Module AreaThe Site Prior to Construction

Construction

Building Foundations

Foundation Insulation

Construction

Steel Framing at Switchgear RoomElectrical Duct Bank

Construction

Roof Framing Interior Ready for Slab Pour

Construction

First Module Section Installed DRUPS Fuel Cell

Construction

Module Roof Sections Setting Access and Server Modules

Construction

Roof Membrane Installation on Modules Switchgear Roomg

Construction

DRUPS U itDRUPS Units

Server Module “Hot” Aisle

Construction

Fi l T hServer Module “Cold” Aisle Final Touches

QuestionsQuestionsLeonard Ruff, AIA

Callison, LLCCallison, LLC206-623-4646

leonard.ruff@callison.comcallison comwww.callison.com