t-76.115 project review wellit pp iteration 1.11.2004
Post on 03-Jan-2016
217 Views
Preview:
TRANSCRIPT
2
T-76.115 Project ReviewT-76.115 Project Review
Agenda
Project status (10 - 15 min) achieving the goals of the iteration project metrics
Work results (15 - 25 min) presenting the iteration’s results demo
Used work practices (5 min)
3
T-76.115 Project ReviewT-76.115 Project Review
Introduction to the project
Part of MC2 (Mobile Content Communities) research project at HIIT. MAR (Mobile Augmented Reality) – toolkit on top of MUPE (Multi-User
Publishing Environment). Goal is to create community activity around MUPE by providing attractive
MAR – toolkit. Enables easier implementation of Mobile Augmented Realities on top of
MUPE. Toolkit will be expandable, implemented version should contain (in
priority order): Physical Object Tagger (POT) Public Display (PUD) Map Interface (MAP) Silent Communicator (SIC) – this will be on low priority
”Scotland Yard” demo game to demonstrate how MAR – toolkit works and for testing purposes.
4
T-76.115 Project ReviewT-76.115 Project Review
Two views to the implemented system
Component positioning inside system
View of the system to users
5
T-76.115 Project ReviewT-76.115 Project Review
Status of the iteration’s goals
Project planning goals Understand the requirements of the customer.
Customer has given us relatively free hands OK. Reach an agreement on what is done and how between customer and the
group. Customer has not commented on requirements document or project plan
yet. Establish the basis for the project including the used work methods and tools.
OK. Research goals
Do research on MUPE and J2ME technologies so that knowledgebase for the rest of the project exists in the end of project planning phase.
11.5 hours spent, some team members concentrated on studying these. Document this research so that it is accessible by other project members.
NOT OK, other tasks (project related and not) taken time from the project.
6
T-76.115 Project ReviewT-76.115 Project Review
Status of the iteration’s goals
Requirements management goals Identify the type of end product (i.e. game) that is going to be built.
OK, but the end product is the MAR – toolkit, game is a demo and tester. Identify the implemented MAR tools.
OK Identify the requirements of the tools.
OK Prioritize the required MAR tools.
OK schedule the releases of the MAR tools.
Tools will be implemented in parallel.
7
T-76.115 Project ReviewT-76.115 Project Review
Status of the iteration’s deliverables
Project Plan OK, except QA Plan (Chapter 5.3) still under work and iteration plans of
iterations I1 – FD are done during iteration planning phase of each iteration (changed from iteration plan of project planning phase).
Requirements document OK, will be detailed and all requirements will be accepted by customer and
group. SEPA diaries
OK Progress Report
OK
8
T-76.115 Project ReviewT-76.115 Project Review
Realization of the tasks
Major discrepancies (more than 10 hours): Req. elicitation and analysis
Hours spent to documentation Hours not raported
Technologies research Over estimation of work effort Hours spent on something else (e.g.
customer held workshop meetings) Tools research
Hours used on tools adaptation Course material study
Over estimation Lectures
Over estimation of participation Customer meetings
Unheld customer meetings Risk management
Hours reported on meetings Hours not raported
9
T-76.115 Project ReviewT-76.115 Project Review
Working hours by person
No major discrepancies. Mostly because personal iteration hour estimates were done so late.
Mostly diversion in project manager work hours, which took more than anticipated.
No plan existed in the beginning of the iteration
Realized hours in this iteration
Latest plan (inc. realized hours)
Real Plan DiffTuomas 85.5 72 13.5Aki 45 47 -2Lauri 30 34 -4Tommi 39.5 39 0.5Heikki H 32 33 -1Heikki A 36 40 -4Tero 33.5 37 -3.5Total 301.5 302 -0.5
PP Subtotal I1 I2 FD TotalTuomas 72 85.5 50 40 28 190Aki 47 45 40 48 55 190Lauri 34 30 51 57 48 190Tommi 39 39.5 65 43 43 190Heikki H 33 32 53 52 52 190Heikki A 40 36 45 60 45 190Tero 37 33.5 51 51 51 190Total 302 301.5 355 351 322 1330
10
T-76.115 Project ReviewT-76.115 Project Review
Quality assessment – Reviewing results
All delivered documents reviewed. Only internal reviews done. Quality measured roughly by dividing the amount of
review notes by the lines of text in the Twiki system.
Deliverable Coverage Quality Comments
Project Plan 2 Internal review by 3 persons, no customer review. 0,033 review notes / line.
Requirements Document
1 Internal review by 2 persons, no customer review. 0,043 review notes / line.
Usability SEPA 1 Internal review by 2 persons, no customer review. 0,015 review notes / line.
TDD SEPA 1 Internal review by 2 persons, no customer review. 0,025 review notes /line.
Progress Tracking SEPA
2 Internal review by 3 persons, no customer review. No review notes.
Legend
Coverage:
0 = not reviewed
1 = internal review by 2 persons
2 = internal review by 3 persons
3 = internal + external review
Quality:
= quality is good
= not sure
= quality is bad
11
T-76.115 Project ReviewT-76.115 Project Review
Software size
So far only documentation… Twiki site now contains 4124 lines of text (excluding information in images and
non-twiki created documents).
12
T-76.115 Project ReviewT-76.115 Project Review
Risks
RiskIT process established Risk Managing process defined 25 risks identified and analyzed Top 10 risks Controlling actions
13
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration
Project Plan Requirements Document Usability SEPA TDD SEPA Progress Tracking SEPA
14
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration: Project Plan
Project staffing
15
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration: Project Plan
Project goals customer group personal
Project abort / end criteria giving control to SG
Resourcing Software (mostly free) Test setting (hardware / server / data transmission)
Practices Iterative development Time reporting Defect tracking Documenting Requirements Management Version control Coding convention Risk management Etc…
16
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration: Project Plan
Iteration flow
17
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration: Project Plan
Quality Assurance Plan Testing levels TDD coming in implementation iteration 2 (SEPA) Reviews
Phasing Progress tracking as SEPA More detailed hour estimates
Macrolevel schedule (includes milestones) Macrolevel hour estimates Each iteration planning phase
Detailed schedule (includes work products) Detailed hour estimates
More predictable results Detailed schedule exists with work products better control of the progress
18
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration: Req. Document
Components identified and prioritized 41 Functional Requirements 4 Non-functional Requirements 11 Use Cases Not yet accepted by the customer!
19
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration: Usability SEPA
Critical issue in game development UI design will begin in next iteration Evaluation and testing of UI in I2 and FD iterations
20
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration: TDD SEPA
Will be commenced in I2.
21
T-76.115 Project ReviewT-76.115 Project Review
Results of the iteration: Progress Tracking SEPA Throughout the project lifecycle.
22
T-76.115 Project ReviewT-76.115 Project Review
Used work practices
time reporting version control meetings (agenda & minutes) reviews (twiki collaboration) documenting progress tracking and control communication practices RiskIT
To be adopted TDD in I2 Usbility tests and heuristic evaluation in I2 and FD