submittal register tbd - usembassy.gov€¦ · concrete masonry units (cmu) 2.2 anchors, ties, and...

Post on 10-May-2020

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

01 33 00 SD-01 Preconstruction Submittals1.6Submittal Register

01 50 00 SD-01 Preconstruction Submittals1.4Construction site plan

01 78 00 SD-03 Product DataAs-Built Record of Equipmentand Materials

1.5.1Warranty Management Plan1.5.4Warranty Tags

Spare Parts DataSD-08 Manufacturer’s Instructions

1.4Preventative Maintenance1.4Condition Monitoring (Predictive

Testing)1.4Inspection1.5.1Instructions

SD-10 Operation and MaintenanceData

1.6Operation and MaintenanceManuals

SD-11 Closeout Submittals1.3.1Record Drawings

03 11 13.00 10 SD-03 Product Data1.2Design2.1Form Materials2.1.5Form Releasing Agents

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

03 11 13.00 10 SD-04 SamplesSample Panels

SD-06 Test Reports3.5Inspection

SD-07 CertificatesFiber Voids

03 20 00.00 10 SD-03 Product DataWelding

3.1.4.1Butt-SplicesMaterial

SD-06 Test ReportsMaterialTests, Inspections, andVerifications

SD-07 Certificates2.3Reinforcing Steel

Qualification of Steel BarButt-Splicers

03 31 01.00 10 SD-03 Product DataConcrete Mixture ProportionsBatch Plant:Concrete MixersConveying EquipmentPlacing Equipment

3.1.3Construction Joint TreatmentSD-06 Test Reports

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

03 31 01.00 10 3.3.2.2Quality of Aggregates3.3Tests and Inspections

SD-07 Certificates1.3Testing Technicians2.1.1Cementitious Materials

Admixture04 20 00 SD-02 Shop Drawings

1.4.4Detail DrawingsSD-03 Product DataLocal/Regional MaterialsEnvironmental Data

2.4.2CementSD-04 Samples

2.2Concrete Masonry Units (CMU)2.6Anchors, Ties, and Bar

Positioners2.10Expansion-Joint Materials2.7Joint Reinforcement1.4.3Portable Panel

SD-06 Test Reports3.21.1Field Testing of Mortar3.21.2Field Testing of Grout3.21.3Prism tests2.4.2Masonry Cement

SD-07 Certificates2.2Concrete Masonry Units (CMU)

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

04 20 00 2.6Anchors, Ties, and BarPositioners

2.10Expansion-Joint Materials2.7Joint Reinforcement2.4.2Masonry Cement2.4.1Admixtures for Masonry Mortar

Admixtures for Grout1.4.2Contamination

SD-08 Manufacturer’s Instructions2.4.2Masonry Cement

SD-10 Operation and MaintenanceDataPlastic IdentificationTake-Back Program

05 12 00 SD-02 Shop Drawings1.3.1Fabrication drawings

SD-03 Product Data2.4Shop primer2.3.1Welding electrodes and rods

SD-07 Certificates2.1Steel2.2Bolts, nuts, and washers

Welding procedures andqualifications

07 32 13 SD-02 Shop Drawings1.7.1Tile roofing system

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

07 32 13 SD-03 Product DataInsulated roof systemFastening systemInstallation details

SD-04 SamplesRoof tile

SD-06 Test ReportsManufacturer's tests

SD-07 CertificatesWorking in high Qualifications

SD-08 Manufacturer’s Instructions3.3Installation

08 11 16 SD-04 Samples1.5.1.1Finish sample

SD-08 Manufacturer’s Instructions2.1Doors and frames

08 51 13 SD-03 Product Data2.1Windows2.2.7.1Hardware2.2.2Fasteners1.8Window performance2.2.9Screens

Weatherstripping2.2.7Accessories2.2.3Adhesives

SD-04 Samples

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

08 51 13 1.3.1.1Finish SampleWindow Sample

SD-10 Operation and MaintenanceData

2.1Windows08 91 00 SD-04 Samples

1.4Wall louvers1.4Door louvers2.3Door louvers

09 24 23 SD-03 Product Data3.3Proportions and Mixing

SD-04 SamplesColored Stucco Finish Coat

1.3Sample Panel09 30 13 SD-03 Product Data

2.1TileCERAMIC: Commercial Traffic

2.2Setting-Bed2.4Mortar, Grout, and Adhesive

SD-04 Samples2.1Tile

CERAMIC04

2.4GroutSD-07 Certificates

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

09 30 13 2.1Tile2.4Mortar, Grout, and Adhesive

SD-08 Manufacturer’s Instructions3.5Maintenance Instructions

SD-10 Operation and MaintenanceData

3.2 GInstallationSD-11 Closeout SubmittalsAdhesives

09 90 00 SD-03 Product Data2.1Coating2.1Manufacturer's Technical Data

Sheets3.3.5Sealant

SD-04 SamplesColorTextured Wall Coating SystemSample Textured Wall CoatingSystem Mock-Up

SD-08 Manufacturer’s InstructionsApplication instructions

3.7.2Mixing1.6.2Manufacturer's Material Safety

Data SheetsSD-10 Operation and MaintenanceData

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

09 90 00 2.1Coatings:09 96 00 SD-01 Preconstruction Submittals

1.3Material, Equipment and FixtureList

SD-03 Product Data2.1Heat-Resistant Coatings2.2Epoxy Coatings2.3Polyurethane Coatings2.4Chlorinated-Rubber Coatings

SD-04 Samples1.3Color Chips

SD-07 Certificates2.1Heat-Resistant Coatings2.2Epoxy Coatings2.3Polyurethane Coatings2.4Chlorinated-Rubber Coatings

10 21 13 SD-03 Product Data1.2Cleaning and Maintenance

Instructions2.6Colors And Finishes2.1.1Galvanized Steel Sheet2.1.2Anchoring Devices and

Fasteners2.1.4Hardware and Fittings2.1.3Brackets2.1.5Door Hardware

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

10 21 13 2.4Pilaster ShoesSD-04 Samples

2.6Colors and Finishes2.1.4Hardware and Fittings2.1.2Anchoring Devices and

FastenersSD-07 Certificates

1.5Warranty22 00 00 SD-02 Shop Drawings

3.7.1Plumbing SystemSD-03 Product Data

2.4Fixtures3.7.1Plumbing System

SD-06 Test Reports3.7Tests, Flushing and Disinfection

SD-07 Certificates1.3Materials and Equipment

SD-10 Operation and MaintenanceData

3.7.1Plumbing System23 00 00 SD-02 Shop Drawings

1.4.5Detail DrawingsSD-03 Product DataAir Vents, Penthouses, andGoosenecks

Ceiling Exhaust Fans

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

23 00 00 Air Handling Units2.10.1Room Fan-Coil Units

Test ProceduresDiagrams

SD-06 Test Reports3.8Performance Tests

SD-08 Manufacturer’s Instructions3.2Manufacturer's Installation

Instructions3.9.2Operation and Maintenance

TrainingSD-10 Operation and MaintenanceData

3.9.1Operation and MaintenanceManuals

23 07 00 SD-03 Product DataPipe Insulation Systems

SD-08 Manufacturer’s InstructionsPipe Insulation Systems

23 23 00 SD-02 Shop Drawings2.3Refrigerant Piping System

SD-03 Product Data2.3Refrigerant Piping System3.5Refrigerant Piping Tests3.4Demonstrations3.1Verification of Dimensions

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

23 23 00 SD-06 Test Reports3.5Refrigerant Piping Tests

SD-10 Operation and MaintenanceData

1.5Maintenance3.4Operation and Maintenance

Manuals23 81 00.00 20 SD-02 Shop Drawings

2.5.2Field-assembled refrigerantpiping

1.4.2Control system wiring diagramsSD-03 Product Data

2.2Air conditioners2.5Refrigerant piping and

accessories2.3Coatings for finned tube coils

SD-06 Test Reports3.8.3Start-up and initial operational

testsSD-08 Manufacturer’s Instructions

2.1Room air conditioners2.2Air conditioners2.5Refrigerant piping and

accessoriesSD-10 Operation and MaintenanceData

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

23 81 00.00 20 2.1Room air conditioners2.2Air conditioners

SD-11 Closeout Submittals1.4.4Posted operating instructions

26 05 00.00 40 SD-01 Preconstruction Submittals2.1Material, Equipment, and Fixture

ListsSD-03 Product Data

2.1.1Conduits and Raceways2.1.3Wire and Cable3.2.1.9Splices and Connectors2.1.4Switches2.1.5Receptacles2.1.6Outlets, Outlet Boxes, and Pull

Boxes2.1.8Circuit Breakers2.1.7Panelboards2.1.9Lamps and Lighting Fixtures2.1.12Dry-Type Distribution

TransformersSD-06 Test Reports

3.3Continuity Test3.3Phase-Rotation Tests3.3Insulation Resistance Test

SD-07 Certificates1.4Certification

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

26 05 00.00 40 SD-08 Manufacturer’s InstructionsPart 2Manufacturer's Instructions

26 05 19.00 10 SD-03 Product Data3.1Installation Instructions

SD-06 Test Reports3.2Tests, Inspections, and

Verifications26 05 71.00 40 SD-02 Shop Drawings

3.1Protective DevicesSD-03 Product Data

2.2Enclosures2.3Circuit Breakers3.1Control Devices2.7Indicating Instruments

SD-06 Test Reports3.2Dielectric Tests3.2Final Test Reports

SD-08 Manufacturer’s Instructions3.1Protective Devices

SD-10 Operation and MaintenanceData

2.3Circuit Breakers26 08 00 SD-06 Test Reports

3.1Acceptance tests and inspections1.4.3Acceptance test and inspections

procedure

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

26 09 23.00 40 SD-03 Product Data2.1.1Photoconductive Control Devices3.1Installation Drawings2.1.1Light-Sensitive Control Devices

Lighting Contactor2.2.2Photocell Switch2.2.3Occupancy Sensors1.3Motion Sensors

SD-06 Test Reports3.2System Operation Tests

26 20 00 SD-02 Shop Drawings2.14Panelboards2.17Transformers2.4Busway2.5Cable trays2.24Wireways3.1.10.1Marking strips

SD-03 Product Data2.13Receptacles2.14.3Circuit breakers2.11Switches2.17Transformers2.15Enclosed circuit breakers

CATV outlets2.20.3Grounding Busbar2.25Surge protective devices

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

26 20 00 SD-06 Test Reports3.5.2600-volt wiring test3.5.5Grounding system test3.5.3Transformer tests3.5.4Ground-fault receptacle test

SD-09 Manufacturer’s FieldReports

2.27.1Transformer factory tests26 24 16.00 40 SD-02 Shop Drawings

2.1.1Detail Drawings2.1.1Outline Drawings

SD-03 Product Data1.3Panelboards2.1.1Panelboards

SD-06 Test Reports3.2Continuity Tests3.2Insulation Tests

SD-07 Certificates1.4Statements

SD-08 Manufacturer’s Instructions1.3Panelboards2.1.1Panelboards

26 28 01.00 10 SD-03 Product Data2.10Fault Current Analysis2.10Protective Device Coordination

Study

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

26 28 01.00 10 2.1Equipment1.4.1System Coordinator3.3.5Protective Relays3.2Installation

SD-06 Test Reports3.3Field Testing

SD-07 Certificates1.6Devices and Equipment

26 28 21.00 40 SD-02 Shop Drawings2.1Connection Diagrams2.1Fabrication Drawings2.1Installation Drawings

SD-03 Product Data2.1Equipment and Performance

Data2.3.1Contacts2.3.2Indicating Lights2.3.3Terminal Board2.2.2Enclosures2.5Accessories

SD-06 Test Reports1.3Qualification Testing1.3Operation Tests

SD-08 Manufacturer’s Instructions2.3.2Automatic Transfer Switch

26 32 14.00 10 SD-02 Shop Drawings

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

26 32 14.00 10 1.4.3Detailed Drawings3.10Acceptance

SD-03 Product Data2.4Manufacturer's Catalog3.9Instructions1.4.2Experience3.2General Installation3.1Site Visit

SD-05 Design Data2.8Sound Limitations2.14Generator2.5.4Integral Main Fuel Storage Tank

Power Factor2.7.2Heat Exchanger2.18.5Time-Delay on Alarms2.7Cooling System1.2.5Vibration Isolation

SD-06 Test Reports3.5.6Performance Tests3.5Onsite Inspection and Tests

SD-07 Certificates1.2.5Vibration Isolation3.4Prototype Tests1.2.6Reliability and Durability2.11Emissions2.8Sound limitations

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

26 32 14.00 10 2.14.1Current Balance2.3Materials and Equipment2.27Factory Inspection and Tests3.5.4Inspections2.7Cooling System

SD-10 Operation and MaintenanceData

1.6.1Operation Manual1.6.2Maintenance Manual1.6.3Extra Materials

26 33 53.00 20 SD-02 Shop Drawings1.6.1UPS Drawings1.6.2UPS Installation

SD-03 Product Data2.3UPS Module2.9Factory Testing2.2UPS System

Spare PartsSD-06 Test Reports

1.6.4Factory Test Plan1.6.5Performance Test Plan2.9Factory Tests1.6.7Performance Tests Report1.6.6Factory Tests Report

SD-09 Manufacturer’s FieldReports

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

26 33 53.00 20 3.2.2Initial Inspection and Tests3.2.3Performance Tests

SD-10 Operation and MaintenanceData

1.10.1UPS Operation and MaintenanceSD-11 Closeout Submittals

3.1Installation26 41 00.00 40 SD-02 Shop Drawings

1.4.1Overall lightning protectionsystem

1.4.1Each major componentSD-03 Product Data

2.2.1Air Terminals2.3Main and Secondary Conductors2.2.2Ground Rods2.4Clamp-Type Connectors2.5Lightning Protection Components2.1Hardware2.1Accessories

SD-06 Test Reports3.6.1Grounding system test3.6.2Lightning protection system

inspectionSD-07 CertificatesUL listing or label or Equivalent

3.6.3Certificates

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

26 51 00 SD-03 Product DataLED lighting fixturesLED lamps

2.7Lighting contactor2.8Photocell switch2.10LED Exit signs

LED Emergency lightingequipment

2.12Occupancy sensorsSD-06 Test Reports

3.2Operating test27 10 00 SD-02 Shop Drawings

1.6.1.1Telecommunications drawings1.6.1.2Telecommunications Space

DrawingsSD-03 Product Data

2.4Telecommunications cabling2.5.6Patch panels2.6Telecommunications

outlet/connector assemblies2.5.3Equipment support frame

SD-06 Test Reports3.5.1Telecommunications cabling

testingSD-07 Certificates

1.6.2.1Telecommunications Contractor

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

27 10 00 1.6.2.3Manufacturer Qualifications1.6.3Test plan

SD-10 Operation and MaintenanceData

1.10.1Telecommunications cabling andpathway system

SD-11 Closeout Submittals1.10.2Record Documentation

28 23 23.00 10 SD-02 Shop Drawings1.4.2.4Graphics1.3.3As-built Drawings

SD-03 Product Data1.4CCTV Technical Data Packages3.6.9Software Updates

SD-06 Test Reports1.4.2Performance Verification Test1.3.2Test Procedures and Reports

SD-08 Manufacturer’s Instructions1.4.3Group V Technical Data Package

SD-10 Operation and MaintenanceData

1.4.2.1Operation and MaintenanceManuals

3.4.2Operator's Training ReportSD-11 Closeout Submittals

1.4.2.3Data Entry

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

31 00 00 SD-01 Preconstruction Submittals3.5Shoring1.3.2Dewatering Work Plan

SD-03 Product Data3.9Utilization of Excavated Materials1.3.1.2Rock Excavation

Opening of any Excavation orBorrow Pit

Shoulder ConstructionSD-06 Test Reports

3.17TestingBorrow Site Testing

SD-07 Certificates3.17Testing

31 23 00.00 20 SD-01 Preconstruction Submittals1.5.1Shoring and Sheeting Plan1.5.2Dewatering work plan

SD-06 Test ReportsBorrow Site Testing

3.12.2.1Fill and backfill3.12.2.2Select material3.12.2.3Density tests

32 16 13 SD-03 Product Data2.1Concrete

SD-06 Test Reports3.8Field Quality Control

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

33 11 00 SD-03 Product Data2.1.1Piping Materials2.1Water distribution main2.2Water service line

Corporation stops2.1.2.2Valve boxes2.2.2.2Valve boxes

SD-06 Test Reports2.2.2.4Disinfection

SD-07 Certificates2.1Water distribution main2.2Water service line

Displacement Type MetersCompound Type Meters

SD-08 Manufacturer’s Instructions1.3Delivery, storage, and handling

Installation33 30 00 SD-01 Preconstruction Submittals

Existing ConditionsSD-02 Shop Drawings

1.4.1Drawings2.3.1Precast concrete manhole2.3.3.1Frames, covers, and gratings

SD-03 Product Data2.1Pipeline materials

SD-06 Test Reports

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 24 PAGES

TBD

PSIB DEA/BUCARAMANGA

33 30 00 2.4ReportsSD-07 CertificatesGaskets

33 71 02 SD-03 Product DataLow voltage cableLow voltage cable terminationsSealing Material

2.11.2Manhole frames and covers2.11.3Handhole frames and covers

SUBMITTAL REGISTERCONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:SCHEDULE DATES

CONTRACTORACTION

APPROVING AUTHORITY

ACTIVITY NO

TRANSMITTAL NO

SPEC SECT

DESCRIPTION

ITEM SUBMITTED

PARAGRAPH

#

CLASSIFICATION

GOVT OR A/E REVWR SUBMIT

APPROVALNEEDED

BY

MATERIALNEEDED

BY

ACTION CODE

DATEOF

ACTION

DATE FWDTO APPR

AUTH/

DATE RCDFROM

CONTR

DATE FWDTO OTHERREVIEWER

DATE RCDFROM OTHREVIEWER

ACTION CODE

DATEOF

ACTION

MAILEDTO

CONTR/

DATE RCDFRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

top related