Work  Flow  Chart  :  Piping  

PCMC  Engineering  Co.,  Ltd  

Material  PreparaNon  

Pipe  Pre-­‐Cut  and  Pre-­‐fabricated  

Pipe  InstallaNon  

Pipe  InstallaNon  

Check  

Pipe  Pressure  Test  

InsulaNon  (if  required  )and  /  or  PainNng  Work  

Opening  gap  filling  /  fire  stop    

Support  PreparaNon  

Support  InstallaNon  

Not  Pass  

Not  Pass  

Pass  

FXL  :  Piping  InspecNon  

PCMC  Engineering  Co.,  Ltd  

FXL  :  Piping  Procedure  

PCMC  Engineering  Co.,  Ltd  

InspecNon  Pipe  :  Non-­‐DestrucNve  Test    

PCMC  Engineering  Co.,  Ltd  

InspecNon  Pipe  :  Non-­‐DestrucNve  Test    

PCMC  Engineering  Co.,  Ltd  

FXL  :  Air  Flow  Balancing  Test  

PCMC  Engineering  Co.,  Ltd  

AVL  :  PTT  Euro  5  

PCMC  Engineering  Co.,  Ltd  

AVL  :  TAI  Bang-­‐pu  

PCMC  Engineering  Co.,  Ltd  

AVL  :  PowerTech  

PCMC  Engineering  Co.,  Ltd  