Work Flow Chart : Piping
PCMC Engineering Co., Ltd
Material PreparaNon
Pipe Pre-‐Cut and Pre-‐fabricated
Pipe InstallaNon
Pipe InstallaNon
Check
Pipe Pressure Test
InsulaNon (if required )and / or PainNng Work
Opening gap filling / fire stop
Support PreparaNon
Support InstallaNon
Not Pass
Not Pass
Pass
FXL : Piping InspecNon
PCMC Engineering Co., Ltd
FXL : Piping Procedure
PCMC Engineering Co., Ltd
InspecNon Pipe : Non-‐DestrucNve Test
PCMC Engineering Co., Ltd
InspecNon Pipe : Non-‐DestrucNve Test
PCMC Engineering Co., Ltd
FXL : Air Flow Balancing Test
PCMC Engineering Co., Ltd
AVL : PTT Euro 5
PCMC Engineering Co., Ltd
AVL : TAI Bang-‐pu
PCMC Engineering Co., Ltd
AVL : PowerTech
PCMC Engineering Co., Ltd