District Department of Transportation AWI Overview
South Capitol Street Community Update Meeting
d.
John Deatrick, PEChief Engineer / Deputy Director
DDOT
District Department of Transportation
Anacostia Waterfrontd.
Overview• AWI Overview • Local Employment Center and LSDBE
Contracts• South Capitol Street Project Background• NEPA• Interchange improvements : Suitland/I-295
and Suitland/MLK Ave• Near Term Improvement and Rehab of the
existing Frederick Douglass Bridge• Replacement of the Frederick Douglass
Bridge
District Department of Transportation
Anacostia Waterfrontd.
Kenilworth AvenueCorridor StudyKenilworth AvenueCorridor Study
AnacostiaRiverwalkTrail
AnacostiaRiverwalkTrail
Boundary ofAnacostia Waterfront InitiativeBoundary ofAnacostia Waterfront Initiative
Middle AnacostiaCrossings StudyMiddle AnacostiaCrossings Study
11th Street BridgeEnvironmental Impact Statement11th Street BridgeEnvironmental Impact Statement
South Capitol StreetEnvironmental Impact StatementSouth Capitol StreetEnvironmental Impact Statement
South Capitol StreetBridge Alignment StudySouth Capitol StreetBridge Alignment Study
Southwest Waterfront –Maine Avenue StudySouthwest Waterfront –Maine Avenue Study
14th Street BridgeEnvironmental Impact Statement14th Street BridgeEnvironmental Impact Statement
BallparkBallpark
d.
District Department of Transportation
Anacostia Waterfrontd.
AWI Projects Overview
District Department of Transportation
Anacostia Waterfrontd.
Background
District Department of Transportation
Anacostia Waterfrontd.
District Department of Transportation South Capitol Street
Projects Overview
South Capitol Street Community Update Meeting
d.
Anne Hassoun, PEDDOT
District Department of Transportation
Anacostia Waterfrontd.
South Capitol Street EIS (Long Term Improvements)
District Department of Transportation
Anacostia Waterfrontd.
EIS Schedule
District Department of Transportation
Anacostia Waterfrontd.
Alternative I
District Department of Transportation
Anacostia Waterfrontd.
Alternative II
District Department of Transportation
Anacostia Waterfrontd.
Interchange ImprovementsSuitland/I-295
MLK-Suitland
District Department of Transportation
Anacostia Waterfrontd.
Environmental Analyses
To date:• Cultural Resources (Historic properties)• Hazmat sites (Preliminary Assessment)• Natural Resources (Short-nose Sturgeon)Next Steps:• Complete the remaining analyses• DEIS• Continue Public Involvement
District Department of Transportation
Anacostia Waterfrontd.
South Capitol Street Near Term Improvements
District Department of Transportation
Anacostia Waterfrontd.
South Capitol Street Near Term Improvements• Improvements around Baseball stadium
District Department of Transportation
Anacostia Waterfrontd.
Industrial Use / Truck Traffic
District Department of Transportation
Anacostia Waterfrontd.
11th St. Bridges Project
FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010NEPABridge RehabRFK Ramp DemolitionMLK Ave ImprovementsDesign Type Size LocationAccelerated Design-construction
District Department of Transportation
Anacostia Waterfrontd.
South Capitol Street Community Update Meeting
District Department of Transportation
d.
Ray McCabe Chief Engineer, Signature Bridges,
HNTB
Frederick Douglass Memorial Bridge
District Department of Transportation
Anacostia Waterfrontd.
Proposed South Capitol Street Bridge Alignment
District Department of Transportation
Anacostia Waterfrontd.
Proposed Frederick Douglass Memorial Bridge
Cable Stayed Swing Span Bridge Stayed Bascule Bridge
Arched Bascule Bridge Retractile Bridge
District Department of Transportation
Anacostia Waterfrontd.
Alternate 1 – Cable Stayed Swing Bridge
Double-Leaf Swing Bridge With a Main Span Length of 340-ft. Each Leaf Supported by Cables Emanating From Transversely Inclined Flag-Pole Towers and Innovatively Integrated Roadway and Pedestrian Walkway Areas are Key Features of this Design Option.
District Department of Transportation
Anacostia Waterfrontd.
Alternate 1 – Cable Stayed Swing Bridge
Cable Stayed Swing Section
District Department of Transportation
Anacostia Waterfrontd.
Alternate 1 – Cable Stayed Swing Bridge
• Longitudinal Elevation • River User's View
District Department of Transportation
Anacostia Waterfrontd.
Alternate 1 – Cable Stayed Swing Bridge
View from Ballpark District
District Department of Transportation
Anacostia Waterfrontd.
Alternate 1 – Cable Stayed Swing Bridge
River User’s View of Bridge in Open Position
District Department of Transportation
Anacostia Waterfrontd.
Alternate 1 – Cable Stayed Swing Bridge
Night View from Anacostia River
District Department of Transportation
Anacostia Waterfrontd.
Alternate 2 – Stayed Bascule
Four tower stayed spans provide a lower height profile than the swing option. The layout provides a movable span indistinguishable from the rest in the closed position. Rhythmic repetition of the span layout along the crossing, carefully sculptured diamond towers and the articulated stay profiles are the key features of this design.
District Department of Transportation
Anacostia Waterfrontd.
Alternate 2 – Stayed Bascule
Stayed Bascule Section
District Department of Transportation
Anacostia Waterfrontd.
Alternate 2 – Stayed Bascule
• Longitudinal Elevation • River User's View
District Department of Transportation
Anacostia Waterfrontd.
Alternate 2 – Stayed Bascule
View from Ballpark District
District Department of Transportation
Anacostia Waterfrontd.
Alternate 2 – Stayed Bascule
River User’s View of Bridge in Open Position
District Department of Transportation
Anacostia Waterfrontd.
Alternate 2 – Stayed Bascule
Night View from Anacostia River
District Department of Transportation
Anacostia Waterfrontd.
Alternate 3 – Arched Bascule
Arched bascule profile provides a bridge alternative with a traditional yet unique flavor. Main span of 550-ft is needed for this option to provide the required 250-ft navigational clearance due to the deeper profile of the bridge near the main piers. The approach spans leading to the movable section are of concrete construction.
District Department of Transportation
Anacostia Waterfrontd.
Alternate 3 – Arched Bascule
• Longitudinal Elevation • River User's View
District Department of Transportation
Anacostia Waterfrontd.
Alternate 3 – Arched Bascule
View from Ballpark District
District Department of Transportation
Anacostia Waterfrontd.
Alternate 3 – Arched Bascule
River User’s View of Bridge in Open Position
District Department of Transportation
Anacostia Waterfrontd.
Alternate 3 – Arched Bascule
Night View from Anacostia River
District Department of Transportation
Anacostia Waterfrontd.
Alternate 4 – Retractile
Seven span layout utilizing a unique curved truss provides a rhythmic repetition of the span layout along the crossing.
District Department of Transportation
Anacostia Waterfrontd.
Alternate 4 – Retractile
Retractile Section
District Department of Transportation
Anacostia Waterfrontd.
Alternate 4 – Retractile
• Longitudinal Elevation • River User's View
District Department of Transportation
Anacostia Waterfrontd.
Alternate 4 – Retractile
View from Ballpark District
District Department of Transportation
Anacostia Waterfrontd.
Alternate 4 – Retractile
River User’s View of Bridge in Open Position
District Department of Transportation
Anacostia Waterfrontd.
Alternate 4 – Retractile
Night View from Anacostia River
District Department of Transportation
Anacostia Waterfrontd.
Washington Post Survey Results - Proposed Designs
District Department of Transportation
Anacostia Waterfrontd.
South Capitol Street Community Update Meeting
District Department of Transportation d.
May 4th, 2006
top related