South Capitol Street Community Update Meeting

District Department of Transportation

May 4th, 2006

d.

District Department of Transportation

Anacostia Waterfrontd.

District Department of Transportation AWI Overview

South Capitol Street Community Update Meeting

d.

John Deatrick, PEChief Engineer / Deputy Director

DDOT

District Department of Transportation

Anacostia Waterfrontd.

Overview• AWI Overview • Local Employment Center and LSDBE

Contracts• South Capitol Street Project Background• NEPA• Interchange improvements : Suitland/I-295

and Suitland/MLK Ave• Near Term Improvement and Rehab of the

existing Frederick Douglass Bridge• Replacement of the Frederick Douglass

Bridge

District Department of Transportation

Anacostia Waterfrontd.

Kenilworth AvenueCorridor StudyKenilworth AvenueCorridor Study

AnacostiaRiverwalkTrail

AnacostiaRiverwalkTrail

Boundary ofAnacostia Waterfront InitiativeBoundary ofAnacostia Waterfront Initiative

Middle AnacostiaCrossings StudyMiddle AnacostiaCrossings Study

11th Street BridgeEnvironmental Impact Statement11th Street BridgeEnvironmental Impact Statement

South Capitol StreetEnvironmental Impact StatementSouth Capitol StreetEnvironmental Impact Statement

South Capitol StreetBridge Alignment StudySouth Capitol StreetBridge Alignment Study

Southwest Waterfront –Maine Avenue StudySouthwest Waterfront –Maine Avenue Study

14th Street BridgeEnvironmental Impact Statement14th Street BridgeEnvironmental Impact Statement

BallparkBallpark

d.

District Department of Transportation

Anacostia Waterfrontd.

AWI Projects Overview

District Department of Transportation

Anacostia Waterfrontd.

Background

District Department of Transportation

Anacostia Waterfrontd.

District Department of Transportation South Capitol Street

Projects Overview

South Capitol Street Community Update Meeting

d.

Anne Hassoun, PEDDOT

District Department of Transportation

Anacostia Waterfrontd.

South Capitol Street EIS (Long Term Improvements)

District Department of Transportation

Anacostia Waterfrontd.

EIS Schedule

District Department of Transportation

Anacostia Waterfrontd.

Alternative I

District Department of Transportation

Anacostia Waterfrontd.

Alternative II

District Department of Transportation

Anacostia Waterfrontd.

Interchange ImprovementsSuitland/I-295

MLK-Suitland

District Department of Transportation

Anacostia Waterfrontd.

Environmental Analyses

To date:• Cultural Resources (Historic properties)• Hazmat sites (Preliminary Assessment)• Natural Resources (Short-nose Sturgeon)Next Steps:• Complete the remaining analyses• DEIS• Continue Public Involvement

District Department of Transportation

Anacostia Waterfrontd.

South Capitol Street Near Term Improvements

District Department of Transportation

Anacostia Waterfrontd.

South Capitol Street Near Term Improvements• Improvements around Baseball stadium

District Department of Transportation

Anacostia Waterfrontd.

Industrial Use / Truck Traffic

District Department of Transportation

Anacostia Waterfrontd.

11th St. Bridges Project

FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010NEPABridge RehabRFK Ramp DemolitionMLK Ave ImprovementsDesign Type Size LocationAccelerated Design-construction

District Department of Transportation

Anacostia Waterfrontd.

South Capitol Street Community Update Meeting

District Department of Transportation

d.

Ray McCabe Chief Engineer, Signature Bridges,

HNTB

Frederick Douglass Memorial Bridge

District Department of Transportation

Anacostia Waterfrontd.

Proposed South Capitol Street Bridge Alignment

District Department of Transportation

Anacostia Waterfrontd.

Proposed Frederick Douglass Memorial Bridge

Cable Stayed Swing Span Bridge Stayed Bascule Bridge

Arched Bascule Bridge Retractile Bridge

District Department of Transportation

Anacostia Waterfrontd.

Alternate 1 – Cable Stayed Swing Bridge

Double-Leaf Swing Bridge With a Main Span Length of 340-ft. Each Leaf Supported by Cables Emanating From Transversely Inclined Flag-Pole Towers and Innovatively Integrated Roadway and Pedestrian Walkway Areas are Key Features of this Design Option.

District Department of Transportation

Anacostia Waterfrontd.

Alternate 1 – Cable Stayed Swing Bridge

Cable Stayed Swing Section

District Department of Transportation

Anacostia Waterfrontd.

Alternate 1 – Cable Stayed Swing Bridge

• Longitudinal Elevation • River User's View

District Department of Transportation

Anacostia Waterfrontd.

Alternate 1 – Cable Stayed Swing Bridge

View from Ballpark District

District Department of Transportation

Anacostia Waterfrontd.

Alternate 1 – Cable Stayed Swing Bridge

River User’s View of Bridge in Open Position

District Department of Transportation

Anacostia Waterfrontd.

Alternate 1 – Cable Stayed Swing Bridge

Night View from Anacostia River

District Department of Transportation

Anacostia Waterfrontd.

Alternate 2 – Stayed Bascule

Four tower stayed spans provide a lower height profile than the swing option. The layout provides a movable span indistinguishable from the rest in the closed position. Rhythmic repetition of the span layout along the crossing, carefully sculptured diamond towers and the articulated stay profiles are the key features of this design.

District Department of Transportation

Anacostia Waterfrontd.

Alternate 2 – Stayed Bascule

Stayed Bascule Section

District Department of Transportation

Anacostia Waterfrontd.

Alternate 2 – Stayed Bascule

• Longitudinal Elevation • River User's View

District Department of Transportation

Anacostia Waterfrontd.

Alternate 2 – Stayed Bascule

View from Ballpark District

District Department of Transportation

Anacostia Waterfrontd.

Alternate 2 – Stayed Bascule

River User’s View of Bridge in Open Position

District Department of Transportation

Anacostia Waterfrontd.

Alternate 2 – Stayed Bascule

Night View from Anacostia River

District Department of Transportation

Anacostia Waterfrontd.

Alternate 3 – Arched Bascule

Arched bascule profile provides a bridge alternative with a traditional yet unique flavor. Main span of 550-ft is needed for this option to provide the required 250-ft navigational clearance due to the deeper profile of the bridge near the main piers. The approach spans leading to the movable section are of concrete construction.

District Department of Transportation

Anacostia Waterfrontd.

Alternate 3 – Arched Bascule

• Longitudinal Elevation • River User's View

District Department of Transportation

Anacostia Waterfrontd.

Alternate 3 – Arched Bascule

View from Ballpark District

District Department of Transportation

Anacostia Waterfrontd.

Alternate 3 – Arched Bascule

River User’s View of Bridge in Open Position

District Department of Transportation

Anacostia Waterfrontd.

Alternate 3 – Arched Bascule

Night View from Anacostia River

District Department of Transportation

Anacostia Waterfrontd.

Alternate 4 – Retractile

Seven span layout utilizing a unique curved truss provides a rhythmic repetition of the span layout along the crossing.

District Department of Transportation

Anacostia Waterfrontd.

Alternate 4 – Retractile

Retractile Section

District Department of Transportation

Anacostia Waterfrontd.

Alternate 4 – Retractile

• Longitudinal Elevation • River User's View

District Department of Transportation

Anacostia Waterfrontd.

Alternate 4 – Retractile

View from Ballpark District

District Department of Transportation

Anacostia Waterfrontd.

Alternate 4 – Retractile

River User’s View of Bridge in Open Position

District Department of Transportation

Anacostia Waterfrontd.

Alternate 4 – Retractile

Night View from Anacostia River

District Department of Transportation

Anacostia Waterfrontd.

Washington Post Survey Results - Proposed Designs

District Department of Transportation

Anacostia Waterfrontd.

South Capitol Street Community Update Meeting

District Department of Transportation d.

May 4th, 2006