solar power project costruction milestones
Post on 16-Jul-2015
166 Views
Preview:
TRANSCRIPT
Step 1: Site Survey
Step 2: Leveling of site
Step 3:Site after leveling
Step 4:Marking of mounting structure
Step 5:Drilling Holes for Foundations
Step 6:Solar Foundations
Step 7:Adjusted frame of solar panel
Step 8:Fitting of Module & Alignment
Step 9:DC Cable laying and conduit dressing
Step 10:Control Room
Step 11:Measure of tilt angle
Step 12:Transmission line for solar plant
Step 12:Transmission line