snow collider-accelerator department 12-22-2009 take 5 for safety
Post on 31-Dec-2015
212 Views
Preview:
TRANSCRIPT
Snow
Collider-Accelerator Department12-22-2009
Take 5 for SafetyTake 5 for Safety
C-AD Procedures Related to Snow
OPM 1.23 addresses working extended hours ... 4.2 Work Planners, Technical Supervisor, Group
Leaders, or higher management, shall consider hazardous weather conditions (e.g. snow) when calling in staff for ...
OPM 2.35 addresses snow removal and priority for clean-up F&O cannot guarantee cleanup priority for storms > 6
inches
OPM 3.0 addresses the local emergency plan and includes natural phenomena
2
OPM Search
3
Culprits Caught on Film…
4
top related