BIM b ildi j topenBIM building project:
SKANSKA’S NEW HEADQUARTER IN HELSINKI, FINLAND
Tiina KoppinenSkanska Finland
FINLAND
1Tiina Koppinen22.3.2012
C t tContents
Sk k Wh ?− Skanska – Who are we?
− BIM Implementation in Skanska Globally
− openBIM in Finland – Example Skanska House, integrated design and construction
BIM diti b i f li bl titi− BIM auditing – basis for reliable quantities− BIM in production planning
Why is openBIM important for Skanska?− Why is openBIM important for Skanska?
222.3.2012 Tiina Koppinen
Skanska – Who are we?
Skanska in short
− Founded 1887 in Sweden
− International business since 18971897
− Listed on the Stockholm Stock ExchangeExchange
− 2010 revenues: SEK 122 billion
2011 SEK 123 billi− 2011 revenues: SEK 123 billion
− 10 000 ongoing projects
− 53,000 employees
− A Fortune 500 company
− Member of UN Global Compact •Älvsborgsbron, Gothenburg, Sweden
3Tiina Koppinen22.3.2012
Local presence – global strength
SwedenNorwayFinlandFinlandDenmarkUnited KingdomE t iEstoniaPolandCzech RepublicSlovakiaHungaryRomania
United StatesLatin America
4Tiina Koppinen22.3.2012
Residential Development (RD)Construction
Infrastructure Development (ID)
Commercial Development (CD) Development (ID)Development (CD)
5Tiina Koppinen22.3.2012
Fi l th t ttFive zeros – values that matter
L kiLoss-makingprojects
DefectsAccidentsEnvironmentalincidents
Ethical breaches
Tiina Koppinen6
22.3.2012
BIM Implementation in Skanska Globally
”BIM in all design/builddesign/build projects 2009”
Johan Karlström, Management Meeting, Orlando, October 2008
Tiina Koppinen7
22.3.2012
BIM li tiBIM applications Facilities Mgt.ProcurementSupport for implementing applications in Skanska
Safety PlanningVisualizations
Site planning–Production BIM
applications in Skanska
y g
Intelligent3D-Modeling
Clash= level 14D-Scheduling
SimulationsEnergy, fire etc
Detection
= level 2
= level 3Quantity take-off, Costing
LCC optioneering
Supply Chain Management
= level 3
p gand Green analyses
Tiina Koppinen8
22.3.2012
Different expertise areas in Skanska WorldwideDifferent expertise areas in Skanska Worldwide
Mäntylinna project, FinlandNew Meadowlands Stadium, New Jersey, USA
Marienborgtunnelen, Trondheim, Norway Refap Sulfur Plant – Skanska LA
Tiina Koppinen9
22.3.2012
All DB projects use BIM in FinlandExamples of openBIM in Finland
All DB projects use BIM in Finland• All Skanska´s DB-projects are modeled:
hit t t t M&E t h i larchitecture, structures, M&E, geotechnical• Model information is utilized in many
processes: quantity take-off, costing, construction, etc.construction, etc.
• More than 100 BIM projects
Visualizations – New Skanska Building
BIM at site: visualizations, scheduling (4D),, g ( ),details, quantities Safety planning
10Tiina Koppinen22.3.2012
BIM bl fi i t tiBIM enables five zeros in construction process
0 errors in design0 errors in design
0 errors in quantity- and cost estimations and schedulingg
0 errors in procurement and logistics
0 errors in production
0 errors in hand-over
Results a better productivity!
11Tiina Koppinen22.3.2012
Vi li ti f ilit t d i i ki iVisualization facilitates decision making in all phases
Supplied
In storagge
Casting completed
12Tiina Koppinen22.3.2012
In production
Model auditing &clash detection of IFC-models are the basis for a successful BIM-projectp j
Tiina Koppinen13
22.3.2012
BIM A diti i d t1. Check the compliance with the project’s BIM Strategy
BIM Auditing is used to…
11.3.201214
Tiina Koppinen22.3.2012
2 Checking all the individual models for clashes and2. Checking all the individual models for clashes and modeling errors
intersections between components
double components
15Tiina Koppinen22.3.2012
3. Comparing the architectural model with the structural model.
4. Comparing MEP models with architectural and structural models (Integrated model)models (Integrated model)
16Tiina Koppinen22.3.2012
E l f l h f d d i thExamples of clashes found during the design of the new Skanska headquarers
17Tiina Koppinen22.3.2012
18Tiina Koppinen22.3.2012
19Tiina Koppinen22.3.2012
Integrated model is used in Design MeetingsIntegrated model is used in Design Meetings
20Tiina Koppinen22.3.2012
11.3.2012 BIM Competence Center21
22Tiina Koppinen22.3.2012
BIM Auditing in construction projectBIM Auditing in construction project- Process is based on checking rounds before each checking pointProcess is based on checking rounds before each checking point- Checking points are design milestones, like applying for the buildingpermit
Supporting databases1 2
Programming DesignDetailed design MaintenanceConstruction
BIM BIMIntelligent3D-Modeling
BIMAuditing
BIM Auditing
23Tiina Koppinen22.3.2012
Add d V l f BIM t P d tiAdded Value from BIM to Production
New SkanskaNew Skanska Headquarter Helsinki, Finland
24Tiina Koppinen22.3.2012
E l f BIM M&EExample of BIM process: M&E From a design to production phase
MagiCAD EXCEL
TEKLA Construction ManagementSolibri
Bill Of Materials (BOM)
CONTROL
Person-hour Schedule
MagiCAD EXCEL (MagiCAD)(Dyna)
IFC-file
M&E Design Production ControlTender Calculation
25Tiina Koppinen22.3.2012
Q tit t k ff b l tiQuantity take off by locations
Tiina Koppinen26
22.3.2012
Production model based onStructuralGeotechnical
Production model based on IFC
Architectural
HVAC-models
Production model
Site planning and safety Electrical
Tiina Koppinen27
22.3.2012
Struc + M&E (Tekla CM)Different model combinations arecombinations are used on site
Arch + M&E (Tekla CM)Model Checker (Solibri)
28Tiina Koppinen22.3.2012
Production model – source of construction information
Site planning d f t
Prefabrication information
construction information
Supply chain management,
Logistics
and safety
Purchase packages
Drawings, Reports, measurements, co-
ordinations, packages
Details: ARC, Structural, MEP
Scheduling (4D)
Tiina Koppinen29
22.3.2012
Why is openBIM important for Skanska?
AllplanEngineeringTekla
Structures
Bentley Architecture Bentley
ProConcrete/ProSteelAutocad
Architecture ArchiCAD
Revit Architecture
Revit Allplan
Engineering
NovapointTerrain
ArchitecturalDesign
StructuresStructural
Engineering
AutoCAD
Engineering
CADS planner
MagiCAD on Revit Revit
CAD-Duct
BIM T l
AutoCAD Civil-3D
BentleyInRoads
GeotechnicalDesign
MagiCAD
CADPIPEMEPDesign
MEP
CQTools on Revit
MEP
Revit MEPTools
Vico Office
BentleyInRoads CivilBentley MX
OctagaEnterprise
Solidworks
Novapoint Tekla CM
Synchro
AutodeskNavisworks
B tlSolibri Model
Autodesk Design
Free-of-chargeViewers
OtherAutoCAD Civil-3D
Solidworks y
NemetschekIFC
Bentley Projectwise-Navigator
Model Checker
DDS IFC-
Viewer
Solibri ModelViewer
VirtualBuilding
Explorer*
Design Review
Novapoint IFC-Viewer
Novapoint Virtual Map*
Tiina Koppinen30
22.3.2012
BIM i d t th it d ilBIM is used at the sites daily− BIM can be used in production meeting for:BIM can be used in production meeting for:
− Visualizing the forthcoming tasks− Visualizing dependence between different tasks− Synchronizing tasks− Planning accurate deliveries to the site
31Tiina Koppinen22.3.2012
Th bi t h i t thThe biggest chance is not the new technology, but the new way of working
- Drawings are always produced from models- Models are correct, not only for visualizations- Transparency of the design, no shortcuts possible
The new way of working improves theThe new way of working improves the process
- Less data loss from design to production - The design can really be checked for errors in 3D- The design is clear for everyone – everybody
understands things similarly
32Tiina Koppinen22.3.2012
B ild i fi i ll !Build it first virtually!
Tiina Koppinen33
22.3.2012
Thank you!Thank you!
Tiina Koppinen34
22.3.2012