Simplification of the CRC Energy Efficiency Scheme

4th February 2013

Welcome

Public sector support on:

• Energy management

• Service adaptation

• Community resilience

• Low carbon economy

� Network

� Information

� Training

� Project funding

� Wide range of resources at:

www.claspinfo.org

CRC Energy Efficiency Scheme

administrator for England and

Wales

Leading NW Climate Change

Partnership

Funding CLASP 2012/13

Todays Seminar

Simplification of the CRC Energy Efficiency Scheme

Steve Smith and Neil Guthrie, Environment Agency

Questions and Answers

Round-table Discussions

Feeding back, concluding thoughts and questions

Simplification

Steve Smith

CRC Operations Support Officer

CRC Energy Efficiency Scheme

Phase 2 Qualification

CRC Energy Efficiency Scheme

Qualification;

• 6000 MWh of electricity delivered through settled half hour

meters between 01 April 2012 – 31 March 2013

• Exclude supplies to CCA and EU ETS facilities and dynamic pseudo

supplies

• Public bodies to register/assess qualification on the basis of their

legal structure on 31 March 2013 (same as phase 1).

CRC Energy Efficiency Scheme

Compliance

CRC Energy Efficiency Scheme

Fuels;

• Electricity delivered through meter profiles 3-8 and 00 only

• Gas used for heating purposes, delivered through meters that

measured more than 73,200kWh during the compliance year

CRC Energy Efficiency Scheme

Supply Rules;

• Footprint reports going

• Residual Measurement Lists going

• Core non-core distinction going

CRC Energy Efficiency Scheme

Supply Rules;

• Emission factors will be brought in line with DEFRA annual Green

House Gas Emissions factors

• Licensed activities:

Gas used for electricity generation excluded

Electricity directly used for generation transmission and distribution

of gas excluded

CRC Energy Efficiency Scheme

Supply Rules;

• Electricity Generating Credits to be removed from the scheme

• New emissions factor for self supplied electricity

CRC Energy Efficiency Scheme

Supply Rules;

• CCA Exemptions to be removed from the scheme

• This also applies to energy supplied to EU ETS installations

• Energy supplied to state funded schools in England will also be

excluded

CRC Energy Efficiency Scheme

Supply Rules;

• Responsible for the supply you request to be delivered

• The payment requirement is to be removed from the supply

criteria

• A supply can only be classed as unconsumed if it is metered

• The landlord tenant rule is to stay the same, except for

construction leases of 30 years or more

CRC Energy Efficiency Scheme

Organisational Rules:

• SGUs going, replaced by Participant Equivalents (PE)

• Disaggregation will be available for all undertakings (except top

parent) – individually or as a group

• Disaggregation can take place at any time

• Designated change staying largely as it is

CRC Energy Efficiency Scheme

Allowance Sales;

• 2 sales each year

• Surrender of allowances deadline moved to end of October

CRC Energy Efficiency Scheme

Reporting and Record Keeping:

• Data retention requirements to be reduced to 6 years after the

end of the scheme year it refers to

The Performance League Table:

• PLT stopping from 2012/13 onwards

CRC Energy Efficiency Scheme

Dates Phase 1 Phase 2

01 April 2012 - 31 March 2013 Compliance Year Qualification Year

April 2013 - July 2013 Submit Annual Report

June 2013 - July 2013 Purchase Allowances

Autumn Registration

31 October 2013 Surrender Allowances

01 April 2013 - 31 March 2014 Compliance Year

April 2014 - July 2014 Submit Annual Report

June 2014 - July 2014 Purchase Allowances Forecast Emission Sale

31 October 2014 Surrender Allowances

01 April 2014 - 31 March 2015 Compliance Year

April 2015 - July 2015 Submit Annual Report

June 2015 - July 2015 Buy to Comply Sale

June 2015 - July 2015 Forecast Emission Sale (for yr 2)

31 October 2015 Surrender Allowances

Time Table:

Subject to change

Continues

CRC Energy Efficiency Scheme

Transition Period;

For current compliance year 2012/13:

• Only report on 2 fuels:

- Electricity delivered through meter profiles 3-8 and 00

- Gas used for heating purposes, delivered through meters that

measured more than 73,200kWh during the compliance year

• 2% de minimis on gas applies

• Electricity Generating Credits cannot be claimed where the input

fuel should have been reported in years 1 and 2

• Surrender date for allowances will be end of October

CRC Energy Efficiency Scheme

Questions

Table Discussions

• Introduce yourselves

�Experience / role with regards to CRC

• Views on simplification

� Barriers / challenges remaining

� Examples of CRC as driver for carbon management

• Further information or support required?

• Feedback

Please make notes on

the A3 sheets, FAO the

Environment Agency

30 mins in total

Feedback and Final Questions

Thank you for coming.

Links to presentations will be emailed out.

www.claspinfo.org