service management status 102 th accu meeting

Post on 24-Feb-2016

42 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Service Management Status 102 th ACCU Meeting. 04 December 2013 . Agenda. Service Level Report and Miscellaneous News Hotel reservation system overview (Presentation by software specialists) The CERN Library. Service Reporting. Reminder: we have Service Portal (single point of contact) - PowerPoint PPT Presentation

TRANSCRIPT

Service Management Status102th ACCU Meeting

04 December 2013

Agenda• Service Level Report and Miscellaneous News• Hotel reservation system overview

(Presentation by software specialists)• The CERN Library

Service Reporting• Reminder: we have

• Service Portal (single point of contact)

• Service Status Board (news and information on service changes and interruptions planned and unplanned)

• Feedback(is actively followed up)

• Complaints process(no complaints received during last period)

Service Reporting

• > 180000 requests and incidents processed to date in 2013• Backlog (snapshot of work that remains to be done) stable/improving• ~4000 tickets resolved per week, with backlog of ~5000

Soft mobility update• Bicycle path meyrin-prevessin: no news,

‘Work should start in 2014 with hope to finish later in the year, but depending on the available budget of the local authorities.’

• Bicycle entrance close to the Swiss/French customs : no news, ‘CERN has prepared all technical solutions and CERN would be ready to start construction but discussions with the Swiss and French authorities are difficult. No time estimate can be given..’

• New bicycle entrances Prevessin site : • One new entrance planned soon

for people and bicycles (equal to the one at entrance C) close to building 864, « route du Maroc ». Plusses: proximity to Prévessin, its cycling paths and the bus stop of the TPG line “O

• Second new entrance considered for ‘later’A third entrance for people and bicycles close to ‘dechetterie’ is also considered, but not budgeted (so no date as yet).

TPG some minor changes next week

http://www.tpg.ch/web/10162/540

And tram 18 continues to Carouge as of mid 2014

Heating startup

Many thanks for your attention!

top related