S04 Ninfield Road Overbridge – Installation of the permanent diversion of telecoms across the bridge deck.

S04 Ninfield Road Overbridge – Permanent diversion connection manholes for foul water pipes next to the bridge deck.

S04 Ninfield Road Overbridge – Permanent diversion connection manholes for foul water pipes next to the bridge deck.

S04 Ninfield Road Overbridge – Installation of the permanent diversion of foul water pipes through the bridge deck.

S04 Ninfield Road Overbridge – Reinforced concrete lining of the abutment walls in advance of brick facing.

S04 Ninfield Road Overbridge – Remedial works to reinforced concrete lining of the abutment walls.

S04 Ninfield Road Overbridge – Brick faced lining of the abutment walls underway.

S04 Ninfield Road Overbridge – Brick faced lining of the abutment walls underway.

Looking east along the railway cutting from Glover’s Lane Bridge. Kerbs and sub-base laid.

Looking east along the railway cutting from Glover’s Lane Bridge. Kerbs and sub-base laid.

Looking west along the railway cutting towards the Ninfield Road Overbridge. Kerbing and CBGM already placed.

Glover’s Lane Bridge resurfaced.

Glover’s Lane Bridge – Removal of scaffold foundations.

Looking west along the railway cutting towards the refurbished Glover’s Lane Bridge.

Looking west along the railway cutting towards the refurbished Glover’s Lane Bridge. CBGM now laid.

Start of the equestrian route near Glover’s Lane Bridge under construction.

Equestrian route east of the Combe Haven ford being constructed.

Glover’s Roundabout – Removal of soft spot beneath east side of roundabout being excavated.

Glover’s Roundabout – Connecting in to the NEBGR spine road.

S07 Combe Haven Underbridge – Preparing for bridge deck surfacing and verge works.

Arrival of the Cement Bound Granular Material (CBGM) batching plant.

CBGM batching plant in full production.

S09 Watermill Stream Underbridge – Preparing western wing wall and deck stringcourse concrete pours.

Cement Bound Granular Material laying trial.

1.2Km of Cement Bound Granular Material laid to Southbound lane viewed from Glover’s Roundabout.

Cement Bound Granular Material being laid to the Northbound lane viewed from Acton’s cut.

Greenway – Construction underway east of Acton’s Farm. Equestrian route is on left hand side.

Greenway – Construction underway east of Acton’s Farm. Equestrian route is on right hand side.

Greenway – View from the Acton’s Farm section.