1 RURAL WINGS IPCrete, 3-4 September, 2007
RURAL WINGS
4th Plenary Meeting
Discussion
Preparation of the mid term October review and Status of current and future Deliverables
2 RURAL WINGS IPCrete, 3-4 September, 2007
Interim Review
Major Issue: EC requested an interim review to assess especially the
Deliverables:
D3.1 User Needs Analysis and User Profile Report (overall responsible SU/IIE)
D2.3 Synthesis Feasibility Report (overall responsible ASTRIUM)
No agenda has been defined yet Meeting will be held in Brussels, 15 October 2007, around noon
Chaired by the new PO and the project reviewers
Mandatory presence of WP2 and WP3 leaders and the corresponding Deliverables responsibles
ICCS, ASTRIUM, SU/IIE, INSEAD Any other partners willing to support the presentation is welcome
3 RURAL WINGS IPCrete, 3-4 September, 2007
Resubmitted Deliverables
Status of (or to be) resubmitted Deliverables:
Current Deliverables: “D2.1 Available and planned applications and Satellite Scenarios
definition report” : overall responsible ICCS/AVANTI Due: M17 - MAY 2007 Status: SUBMITTED Result: ACCEPTED
“D 3.2 Task analysis”: overall responsible INSEAD Due: M17 - MAY 2007 Status: SUBMITTED Result: ACCEPTED
“D 3.1 User needs analysis and User Profiles Report”: overall responsible SU/IIE
Due: M19 – JULY 2007 Status: under internal review Result:
“D 2.3 Synthesis Feasibility Report”: overall responsible ASTRIUM Due: M19 – JULY 2007 Status: under internal review Result:
4 RURAL WINGS IPCrete, 3-4 September, 2007
Resubmitted Deliverables (2)
Other and Future Deliverables:
“D 4.1 Rural Wings scenarios”: overall responsible EA, BGU, INSEAD Due: M20 - SEPTEMBER 2007 (initial version) M27 - MARCH 2007 (revised version)
“D5.3 Integrated Rural wings Common Access Point (CAP) 1st release”: overall responsible FORTHNET
Due: M17 - MAY 2007 Status: continuously updated, ongoing development
The following Deliverables to be submitted on M24 - DECEMBER 2007
“D2.2 / D5.1 High level definition of the end to end system architecture” : overall responsible ASTRIUM
“D5.2: Rural Wings adapted e-platforms and e-tools”: overall responsible ICCS and platform providers
“D5.3.1 Integrated Rural wings Common Access Point (CAP) 2nd release”: overall responsible FORTHNET
“D5.4: Test Bed report”: overall responsible ASTRIUM
5 RURAL WINGS IPCrete, 3-4 September, 2007
Discussion
Discussion issues:
D2.3 and D3.1 to comply with: the reviewers remarks The overall project concept taking into account the specific
user needs and the specific RW applications and scenarios that will be offered to the users
Cost effective, realistic and under the RW vision solutions Proof of interaction between WP2 and WP3 and also between
the other project WPs and Deliverables To be submitted officially on 10/9/2007 having incorporated
the comments of today’s discussion
ASTRIUM and SU/IIE to present in the following what will be shown to the reviewers during the interim review in October concerning the D2.3 and D3.1 respectively.