1 RURAL WINGS IPCrete, 3-4 September, 2007

RURAL WINGS

4th Plenary Meeting

Discussion

Preparation of the mid term October review and Status of current and future Deliverables

Page 2: RURAL WINGS

2 RURAL WINGS IPCrete, 3-4 September, 2007

Interim Review

Major Issue: EC requested an interim review to assess especially the

Deliverables:

D3.1 User Needs Analysis and User Profile Report (overall responsible SU/IIE)

D2.3 Synthesis Feasibility Report (overall responsible ASTRIUM)

No agenda has been defined yet Meeting will be held in Brussels, 15 October 2007, around noon

Chaired by the new PO and the project reviewers

Mandatory presence of WP2 and WP3 leaders and the corresponding Deliverables responsibles

ICCS, ASTRIUM, SU/IIE, INSEAD Any other partners willing to support the presentation is welcome

Page 3: RURAL WINGS

3 RURAL WINGS IPCrete, 3-4 September, 2007

Resubmitted Deliverables

Status of (or to be) resubmitted Deliverables:

Current Deliverables: “D2.1 Available and planned applications and Satellite Scenarios

definition report” : overall responsible ICCS/AVANTI Due: M17 - MAY 2007 Status: SUBMITTED Result: ACCEPTED

“D 3.2 Task analysis”: overall responsible INSEAD Due: M17 - MAY 2007 Status: SUBMITTED Result: ACCEPTED

“D 3.1 User needs analysis and User Profiles Report”: overall responsible SU/IIE

Due: M19 – JULY 2007 Status: under internal review Result:

“D 2.3 Synthesis Feasibility Report”: overall responsible ASTRIUM Due: M19 – JULY 2007 Status: under internal review Result:

Page 4: RURAL WINGS

4 RURAL WINGS IPCrete, 3-4 September, 2007

Resubmitted Deliverables (2)

Other and Future Deliverables:

“D 4.1 Rural Wings scenarios”: overall responsible EA, BGU, INSEAD Due: M20 - SEPTEMBER 2007 (initial version) M27 - MARCH 2007 (revised version)

“D5.3 Integrated Rural wings Common Access Point (CAP) 1st release”: overall responsible FORTHNET

Due: M17 - MAY 2007 Status: continuously updated, ongoing development

The following Deliverables to be submitted on M24 - DECEMBER 2007

“D2.2 / D5.1 High level definition of the end to end system architecture” : overall responsible ASTRIUM

“D5.2: Rural Wings adapted e-platforms and e-tools”: overall responsible ICCS and platform providers

“D5.3.1 Integrated Rural wings Common Access Point (CAP) 2nd release”: overall responsible FORTHNET

“D5.4: Test Bed report”: overall responsible ASTRIUM

Page 5: RURAL WINGS

5 RURAL WINGS IPCrete, 3-4 September, 2007

Discussion

Discussion issues:

D2.3 and D3.1 to comply with: the reviewers remarks The overall project concept taking into account the specific

user needs and the specific RW applications and scenarios that will be offered to the users

Cost effective, realistic and under the RW vision solutions Proof of interaction between WP2 and WP3 and also between

the other project WPs and Deliverables To be submitted officially on 10/9/2007 having incorporated

the comments of today’s discussion

ASTRIUM and SU/IIE to present in the following what will be shown to the reviewers during the interim review in October concerning the D2.3 and D3.1 respectively.