roljclou ilsljebolc b9l1< o gu nçcou 66 ooq hook ch 19 ... · 178133 b lo emgÀ ire b9lu61j...

Post on 28-Jul-2020

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

0 700 1,400 2,100m

1:50,000REPRODUCTION FROM ORDNANCE SURVEY MAPS, BY

PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OFTHE CONTROLLER OF HER MAJESTY'S STATIONERY

OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OSLICENCE NO.100035971/0160

THIS PLAN IS PRODUCED TO ASSIST WITH THE ASSESSMENTOF THE PRELIMINARY ENVIRONMENTAL INFORMATION. IT IS

ISSUED WITHOUT PREJUDICE TO THE SCOPE, CONTENT ANDORDER LAND IN ANY SUBSEQUENT APPLICATION FOR

DEVELOPMENT CONSENT

Coordinate System: British National GridUnits: Metre

THIS DRAWING IS SCALED AT PAPER SIZE A3,THEREFORE ANY PRINTS TAKEN AT SMALLER SIZESWILL AFFECT ACCURACY OF THE MEASUREMENT UNITSAND SHOULD NOT BE SCALED AGAINST

Client

ISSUE DATE COMMENTS DRAWN CHK'D APP'DA 27.08.15 DD TW SP

Title

APPLICATION No. GISA3

DRAWING No.6.4 DSCALE1:50,000ISSUEB

COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF TRANSPORT FOR LONDON

Notes

ASSESSED CASE (2021)MODELLED ROADS

A

DC

B

®

KEY PLAN

B 29.09.15 DD TW SP

SILVERTOWN TUNNEL:PRELIMINARY ENVIRONMENTAL

INFORMATION REPORTASSESSED CASE (2021) MODELLED ROADS

top related