Long Beach Unified School District 1  

New Browning High School Construction

Richard D. Browning High School

Community Update September 29, 2015

Long Beach Unified School District 2  

New Browning High School Construction

Project Goals

1.  Creating 21st century learning environments for the next generation

2.  Changing type and size of high schools •  Construction of new state of the art small

high school

3.  Integrating high school pathways with rigorous college-prep curriculum

•  Culinary Arts/Food Science •  Hospitality

PROJECT GOALS & OBJECTIVES

Long Beach Unified School District 3  

New Browning High School Construction

Browning student body •  Enrollment of 840 •  Enrollment will be phased in over four years, beginning with ninth grade in

September 2017. •  School of choice selection process- meet eligibility criteria and

demonstrate strong interest in the pathways •  Building leaders in culinary arts and hospitality

–  Management  of  Lodging  Facili1es    –  Managers  in  Travel  and  Tourism  

–  Restaurant  and  Beverage  Management    –  Spa  Management    –  Human  Resources/Finance/Opera1ons  Directors    

Long Beach Unified School District 4  

New Browning High School Construction

Proposed Curriculum

  Grade   PE   Math   Lab  Science   English   World  Languages  

History/  Social  Science  

Visual/  Perform  Arts  

College  Prep  

CTE  

   9

       PE

Business  Algebra  1-­‐2  or    Accelerated  Algebra  1-­‐2

   Biology

   Accelerated  English  1-­‐2

   Spanish  1-­‐2  Span/Span  Speakers  1-­‐2  Chinese  1-­‐2

     Drawing  &  Pain1ng  1-­‐2

     

Principals  of  Hospitality  &  Tourism  Geography  of  Tourism

   10

   PE

   Geometry  or    Accelerated  Geometry

   Food  Science  1-­‐2

   Accelerated  English  3-­‐4

Spanish  3-­‐4  Span/Span  Speakers  3-­‐4  Chinese  3-­‐4

Modern  World  History  Acc.  or  AP

       

   Foods  and  Nutri1on

   11

  Intermediate  Algebra  1-­‐2  or  Accelerated  Intermediate  Algebra  1-­‐2

   Chemistry  1-­‐2,  AP  or  Honors  Chemistry

   Honors  English  5-­‐6

   Spanish  5-­‐6  Span/Span  Speakers  5-­‐6  Chinese  5-­‐6

   U.S.  History  Honors  or  AP

Digital  Arts  &  Imagining  1-­‐2    Social  Media  &  Marke1ng

     

   Advanced  Foods  Hospitality  Marke1ng

   12

     Pre-­‐Sta1s1cs  Finite  Math,  Pre-­‐Calculus  

   Environmental  Science  Honors  or  AP

English  7-­‐8    ERWC  Rhetoric  &  Comp  Mul1cultural  or  AP  Lit  

   Spanish  7-­‐8  AP  Spanish  Chinese  7-­‐8

   Govt/  Econ  Honors

  Business  in  Global  Econ

Sports,  Entertainment  &  Event  Planning  Sustainable  Tourism

Long Beach Unified School District 5  

New Browning High School Construction

BROWNING HS SITE PLAN

State of the art facility •  10.3 acre site; 130,000 sq. ft. •  4 buildings, 31 classrooms •  Science laboratories •  Technical educational

laboratories •  Special education classrooms •  Visual arts classrooms •  Administration building •  Media center •  Gymnasium •  Multi-purpose room •  Nutrition services •  Managed single point of entry

to campus on Obispo •  State of the art fire alarm,

intercom, and security cameras

North West View

Admin/ CR

MPR/ CR

Gym

Library/ CR

Fields

Long Beach Unified School District 6  

New Browning High School Construction

RENDERINGS OF NEW BUILDINGS

Obispo Street View (Front of School)

View of Courtyard

Long Beach Unified School District 7  

New Browning High School Construction

RENDERINGS OF NEW BUILDINGS

Redondo Street View

Hill Street View

Long Beach Unified School District 8  

New Browning High School Construction

TYPICAL DESIGN OF NEW BUILDINGS

Cut thru of Academic Building

Cut thru of Library

Long Beach Unified School District 9  

New Browning High School Construction

CONSTRUCTION  PHASE

START  DATE

COMPLETION    DATE

Phase  1:    Site  Prep May  2014 Completed

Phase  2:    Building  New  High  School

October  2014 Winter  2016

CONSTRUCTION PHASING

View from Obispo facing the entrance

View of Courtyard from the Fields

Long Beach Unified School District 10  

New Browning High School Construction

•  $52  million  construc1on  budget  •  Structural  steel  90%  complete  •  Slab  on  grade  and  2nd  floor  concrete  

60%  complete  •  Exterior  and  interior  framing  begun  •  Exterior  cladding  and  roofing  to  

begin  soon  •  Interior  finish  work  to  begin  once  

the  exterior  cladding  and  roofing  completed  

•  Site  work  and  landscaping  will  be  done  towards  the  end  of  the  project  

•  Construc1on  hours:  –  M-­‐F;  7am  –  10pm  (interior  work,  if  

necessary)    –  Saturday  (if  needed);  9am-­‐4pm  

CONSTRUCTION

Long Beach Unified School District 11  

New Browning High School Construction

CONSTRUCTION PROGRESS

Long Beach Unified School District 12  

New Browning High School Construction

CONSTRUCTION PROGRESS

Long Beach Unified School District 13  

New Browning High School Construction

CONSTRUCTION PROGRESS

Long Beach Unified School District 14  

New Browning High School Construction

•  Undergrounding of all utilities on Hill

•  Tree wells will be installed

•  Work estimated to begin in November 2015

•  Traffic mitigation measures during construction will be taken

OFF SITE IMPROVEMENTS

Long Beach Unified School District 15  

New Browning High School Construction

Long Beach Unified School District 15  

•  Contact:  info@measurekbond.net  •  Communica1ons  Coordinator:  Vivien  Hao  

–  Cell  323-­‐893-­‐4743  •  Online  Updates:  hhp://measurekbond.net  

Measure K School Bonds

Long Beach Unified School District 16  

New Browning High School Construction

Q  &  A  