richard d. browning high school -...

16
Long Beach Unified School District 1 New Browning High School Construction Richard D. Browning High School Community Update September 29, 2015

Upload: duongminh

Post on 30-Jan-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 1  

New Browning High School Construction

Richard D. Browning High School

Community Update September 29, 2015

Page 2: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 2  

New Browning High School Construction

Project Goals

1.  Creating 21st century learning environments for the next generation

2.  Changing type and size of high schools •  Construction of new state of the art small

high school

3.  Integrating high school pathways with rigorous college-prep curriculum

•  Culinary Arts/Food Science •  Hospitality

PROJECT GOALS & OBJECTIVES

Page 3: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 3  

New Browning High School Construction

Browning student body •  Enrollment of 840 •  Enrollment will be phased in over four years, beginning with ninth grade in

September 2017. •  School of choice selection process- meet eligibility criteria and

demonstrate strong interest in the pathways •  Building leaders in culinary arts and hospitality

–  Management  of  Lodging  Facili1es    –  Managers  in  Travel  and  Tourism  

–  Restaurant  and  Beverage  Management    –  Spa  Management    –  Human  Resources/Finance/Opera1ons  Directors    

Page 4: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 4  

New Browning High School Construction

Proposed Curriculum

  Grade   PE   Math   Lab  Science   English   World  Languages  

History/  Social  Science  

Visual/  Perform  Arts  

College  Prep  

CTE  

   9

       PE

Business  Algebra  1-­‐2  or    Accelerated  Algebra  1-­‐2

   Biology

   Accelerated  English  1-­‐2

   Spanish  1-­‐2  Span/Span  Speakers  1-­‐2  Chinese  1-­‐2

     Drawing  &  Pain1ng  1-­‐2

     

Principals  of  Hospitality  &  Tourism  Geography  of  Tourism

   10

   PE

   Geometry  or    Accelerated  Geometry

   Food  Science  1-­‐2

   Accelerated  English  3-­‐4

Spanish  3-­‐4  Span/Span  Speakers  3-­‐4  Chinese  3-­‐4

Modern  World  History  Acc.  or  AP

       

   Foods  and  Nutri1on

   11

  Intermediate  Algebra  1-­‐2  or  Accelerated  Intermediate  Algebra  1-­‐2

   Chemistry  1-­‐2,  AP  or  Honors  Chemistry

   Honors  English  5-­‐6

   Spanish  5-­‐6  Span/Span  Speakers  5-­‐6  Chinese  5-­‐6

   U.S.  History  Honors  or  AP

Digital  Arts  &  Imagining  1-­‐2    Social  Media  &  Marke1ng

     

   Advanced  Foods  Hospitality  Marke1ng

   12

     Pre-­‐Sta1s1cs  Finite  Math,  Pre-­‐Calculus  

   Environmental  Science  Honors  or  AP

English  7-­‐8    ERWC  Rhetoric  &  Comp  Mul1cultural  or  AP  Lit  

   Spanish  7-­‐8  AP  Spanish  Chinese  7-­‐8

   Govt/  Econ  Honors

  Business  in  Global  Econ

Sports,  Entertainment  &  Event  Planning  Sustainable  Tourism

Page 5: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 5  

New Browning High School Construction

BROWNING HS SITE PLAN

State of the art facility •  10.3 acre site; 130,000 sq. ft. •  4 buildings, 31 classrooms •  Science laboratories •  Technical educational

laboratories •  Special education classrooms •  Visual arts classrooms •  Administration building •  Media center •  Gymnasium •  Multi-purpose room •  Nutrition services •  Managed single point of entry

to campus on Obispo •  State of the art fire alarm,

intercom, and security cameras

North West View

Admin/ CR

MPR/ CR

Gym

Library/ CR

Fields

Page 6: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 6  

New Browning High School Construction

RENDERINGS OF NEW BUILDINGS

Obispo Street View (Front of School)

View of Courtyard

Page 7: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 7  

New Browning High School Construction

RENDERINGS OF NEW BUILDINGS

Redondo Street View

Hill Street View

Page 8: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 8  

New Browning High School Construction

TYPICAL DESIGN OF NEW BUILDINGS

Cut thru of Academic Building

Cut thru of Library

Page 9: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 9  

New Browning High School Construction

CONSTRUCTION  PHASE

START  DATE

COMPLETION    DATE

Phase  1:    Site  Prep May  2014 Completed

Phase  2:    Building  New  High  School

October  2014 Winter  2016

CONSTRUCTION PHASING

View from Obispo facing the entrance

View of Courtyard from the Fields

Page 10: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 10  

New Browning High School Construction

•  $52  million  construc1on  budget  •  Structural  steel  90%  complete  •  Slab  on  grade  and  2nd  floor  concrete  

60%  complete  •  Exterior  and  interior  framing  begun  •  Exterior  cladding  and  roofing  to  

begin  soon  •  Interior  finish  work  to  begin  once  

the  exterior  cladding  and  roofing  completed  

•  Site  work  and  landscaping  will  be  done  towards  the  end  of  the  project  

•  Construc1on  hours:  –  M-­‐F;  7am  –  10pm  (interior  work,  if  

necessary)    –  Saturday  (if  needed);  9am-­‐4pm  

CONSTRUCTION

Page 11: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 11  

New Browning High School Construction

CONSTRUCTION PROGRESS

Page 12: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 12  

New Browning High School Construction

CONSTRUCTION PROGRESS

Page 13: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 13  

New Browning High School Construction

CONSTRUCTION PROGRESS

Page 14: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 14  

New Browning High School Construction

•  Undergrounding of all utilities on Hill

•  Tree wells will be installed

•  Work estimated to begin in November 2015

•  Traffic mitigation measures during construction will be taken

OFF SITE IMPROVEMENTS

Page 15: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 15  

New Browning High School Construction

Long Beach Unified School District 15  

•  Contact:  [email protected]  •  Communica1ons  Coordinator:  Vivien  Hao  

–  Cell  323-­‐893-­‐4743  •  Online  Updates:  hhp://measurekbond.net  

Measure K School Bonds

Page 16: Richard D. Browning High School - lbschoolbonds.netlbschoolbonds.net/pdfs/browning-commmtg-20150915.pdf · Long Beach Unified School District 1 New Browning High School Construction

Long Beach Unified School District 16  

New Browning High School Construction

Q  &  A