RHIC Machine/Detector Planning Meeting21 Feb 07Questions of the day Machine: (Angelika or designee)What is planned that could lead to more luminosity/smaller vertexthat was not discussed in the 1 June 2006 "RHIC Collider Projections" document?(Improved BTA Stripping Foils, AGS Bunch Merge, Stochastic cooling in Yellow)Experiment: (Bill and Mike)Approximately how much access time is required for your experiment to be ready for physics data collection?
Planning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM_07/rhic_planning.htm
-
RHIC Machine/Detector Planning Meeting21 Feb 07Usual Agenda Scheduling Physicist Issues (Gardner) Machine Issues - (Drees) Experiment IssuesPHENIX (Leitch)STAR (Christie) RHIC Beam Experiments - (Pilat)
RCF Issues - (Throwe)
Planning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM_07/rhic_planning.htm
-
RHIC Run 7 as run/planned12 Feb cool-down begins17 Feb blue cold20 Feb 1st beam in blue ring25 Feb yellow cold26 Feb 1st beam in yellow, begin setup mode28 Feb last day for daytime experiment accesses8 Mar begin ramp-up mode, overnight stores for experiments15 Mar physics mode, 100 x 100 GeV/n Au-Au
26 Jun end physics (14.7 weeks), begin warm-up to LN230 Jun RHIC Cryo switch to LN2 complete, end 19.7 weeks of cryo operation
21 Feb 07
-
RHIC Machine/Detector Planning Meeting21 Feb 07Answer to Questions from the 6 Feb meeting (to be revisited) (1) Experiments What are your luminosity goals for the Au-Au run, Delivered and Sampled? PHENIX goals for 100 x 100 GeV/n Au-AuDelivered Luminosity = 2700 mb-1Sampled Luminosity = 1100 mb-1Assumes 68% live time, 60% vertex cut = 40.5% efficientHowever, Run5 efficiency factor was 25% (if so, the Run7 requirement is 4400 mb-1 delivered)
STAR goals for 100 x 100 GeV/n Au-AuDelivered Luminosity = 1800 mb-1Sampled Luminosity = 300 mb-1 with 60M usable min-bias events~50% live time
-
RHIC Machine/Detector Planning Meeting21 Feb 07Answer to Questions from the 6 Feb meeting (to be revisited) (2) Experiments and Machine - If the Au-Au run goes well and luminosity goals are met with a week or two left to go, what should we do? PHENIXProbably need 15 weeks to achieve Au-Au goals highest prioritypp development if well motivated/justifiedStudies to maximize Run8 figure of merit500 GeV development
STARLow energy Au-Au development, collider issues, triggering Machine1-2 days low energy Au-Au development at 0.5 injection energypp development 1st priority new RHIC working point (needs ~2 weeks)2nd priority 500 GeV development
-
PHENIX GoalSTAR GoalPHENIX Goal (with Run 5 efficiency) 15Delivered Integrated Luminosity [nb-1]Run-7 Au-Au luminosity projections 100 GeV/n
-
RHIC Machine/Detector Planning Meeting21 Feb 07
Next Meeting usual time
Tuesday, February 27, after Time Meeting
Planning Meeting Web Site: http://www.c-ad.bnl.gov/esfd/RMEM_07/rhic_planning.htm
-
RHIC-AGS FY07, 1 Feb 07
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Other (TBD)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY07
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
15 Feb 07
U.S. Department of EnergyBrookhaven Science Associates
setup
Plan, subject to change
19.7 weeks
Sep
concurrent with RHIC
ramp up luminosity
26 June
~15 weeks
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY07, 28 Dec 06
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Other (TBD)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY07
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
28 Dec 06
U.S. Department of EnergyBrookhaven Science Associates
setup
Draft Plan (awaiting final budget)
21.3 weeks
Sep
concurrent with RHIC
16.8 weeks
ramp up luminosity
schedule TBD
28 June
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY07, 5 Oct 06
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Other (TBD)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY07
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
17 Oct 06
U.S. Department of EnergyBrookhaven Science Associates
setup
30 week Draft Plan (awaiting final budget)
30 weeks
Sep
concurrent with RHIC
1 Dec
28 June
25.5 weeks
ramp up luminosity
schedule and second beam species TBD
schedule TBD
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY07, 25 Sep 06
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Setup (no colliding beams)
RHIC 250x250 GeV pp development
NSRL (NASA Radiobiology)
(NASA Schedule to be determined)
Shutdown (RHIC)
C-A Operations-FY07
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
25 Sep 06
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
30 week Draft Plan
30 weeks
Sep
concurrent with RHIC
1 Nov
30 May
25.5 weeks
Commissioning
Contingency
schedule TBD
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY07, 5 Sep 06
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Setup (no colliding beams)
RHIC Research with HI
RHIC Research with pp
RHIC 250x250 GeV pp development
NSRL (NASA Radiobiology)
(NASA Schedule to be determined)
Shutdown (RHIC)
C-A Operations-FY07
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
5 Sep 06
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
30 week Draft Plan
30 weeks
Sep
concurrent with RHIC
1 Nov
30 May
25.5 weeks
Commissioning
Contingency
species, energy and/or schedule TBD
schedule TBD
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, 19 Sep 06
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC Colliding Beams
RHIC Research with 100x100 GeV pp
RHIC Research with 31x31 GeV pp
RHIC Beam Development 11 x 11 GeV pp
RHIC 250x250 GeV pp development
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
19 Sep 06
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
AS Run
21.2 weeks
Sep
schedule to be determined
1 Feb
30 Jun
Commissioning
Unscheduled Shutdown
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, 13 Mar 06
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC Colliding Beams
RHIC Research with HI
RHIC Research with pp
RHIC 250x250 GeV pp development
NSRL (NASA Radiobiology)
(NASA Schedule to be determined)
Shutdown (RHIC)
C-A Operations-FY07
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
14 Mar 06
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
34 week Draft Plan
34 weeks
Sep
concurrent with RHIC
16 Oct
11 Jun
28.5 weeks
Commissioning
Contingency
species, energy and/or schedule TBD
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, 30 Jan 06
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC Colliding Beams
RHIC Research with 100x100 GeV pp
RHIC Research with 31x31 GeV pp
RHIC 250x250 GeV pp development
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
30 Jan 06
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
The Plan
20 weeks
Sep
schedule to be determined
1 Feb
21 Jun
14.5 weeks
Commissioning
Contingency
0.5 Week Cont'when to use TBD
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, 3 Jan 06
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC Colliding Beams
RHIC Research with 100x100 GeV/ pp
RHIC Research with ?
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
3 Jan 06
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
proposed
18 weeks
Sep
schedule to be determined
1 Feb
7 Jun
12.5 weeks
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, 18 Nov 05 (2)
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with ?
RHIC Research with ?
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
18 Nov 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
RHIC Schedule - on hold - SERIOUS BUDGET ISSUES
27.4 weeks
Sep
schedule to be determined
5 Dec
15 Jun, actual end dateto be determined
3 Oct
~ 7 weeks
?
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, 18 Nov 05
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC Research with 200 GeV pp
RHIC Research with 62.4 GeV pp
RHIC beam development with 500 GeV pp
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
18 Nov 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
ON HOLD - Serious Budget ISSUES!!!!
20 weeks
Sep
schedule to be determined
5 Dec
3 Oct
~ 7 weeks
4
1
PHENIX-FY06, 2 Nov 05
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC Research with 200 GeV AuAu
RHIC Research with 200 GeV pp
RHIC Research with 62.4 GeV pp
RHIC Research with 22.5 GeV pp
RHIC Research with 500 GeV pp
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
2 Nov 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
DRAFT - DRAFT
29.6 weeks
Sep
schedule to be determined
5 Dec
3 Oct
~ 7 weeks
PHENIX Proposal
Senate Budget and $100/MWhr("best case")
20 weeks
13
4
2
.5
1
BRAHMS Request2-3- weeks @ 62.4 GeV
STAR-FY06, 2 Nov 05
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC Research with 200 GeV pp
RHIC Research with 19.6 GeV Au-Au
RHIC Research with 31 GeV Au-Au
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
2 Nov 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
DRAFT - DRAFT
29.6 weeks
Sep
schedule to be determined
5 Dec
3 Oct
~ 7 weeks
STAR Proposal
Senate Budget and $100/MWhr("best case")
20 weeks
20
1
1
RHIC-AGS FY05, as run
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cool-down/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Cu-Cu (100x100 GeV/n)
RHIC Research with Cu-Cu (31x31 GeV/n)
RHIC Research with Cu-Cu (11x11 GeV/n)
RHIC Research with p-p (100x100 GeV)
RHIC Research with p-p (205x205 GeV)
NSRL (NASA Radiobiology)
AGS (NASA)
Shutdown (RHIC)
C-A Operations-FY05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2005
3 Aug 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - As Run
32 weeks
p,O(2),Si,Fe(2),Ti
Sep
schedule to be determined
pending funding
p,C,O,Si,Fe(2)
p,Ti,,Si,Fe(2)
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, 8 Aug 05
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldow/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with ?
RHIC Research with ?
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
3 Aug 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - subject to change
27.4 weeks
Sep
schedule to be determined
5 Dec
15 Jun, actual end dateto be determined
3 Oct
~ 7 weeks
?
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, STAR (3)
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with ?
RHIC Research with ?
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
25 July 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - subject to change
27.4 weeks
Sep
schedule to be determined
pending funding
DRAFT - Not publishedSTAR/PHENIX Proposal
5 Dec
15 Jun
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, STAR (2)
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with ?
RHIC Research with ?
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
25 July 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - subject to change
29.4 weeks
Sep
schedule to be determined
pending funding
DRAFT - Not publishedSTAR Proposal (2)
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, STAR
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with ?
RHIC Research with ?
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
25 July 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - subject to change
27.4 weeks
Sep
schedule to be determined
pending funding
DRAFT - Not publishedSTAR Proposal (1)
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, PHENIX
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with ?
RHIC Research with ?
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
25 July 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - subject to change
26.0 weeks
Sep
schedule to be determined
pending funding
DRAFT - Not publishedPHENIX Proposal
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY06, 6-14-05
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with ?
RHIC Research with ?
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY06
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2006
25 July 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - subject to change
32 weeks
Sep
schedule to be determined
pending funding
DRAFT - Not published
http://www.c-ad.bnl.gov/esfd
Sheet2
RHIC-AGS FY05, 6-14-05
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Cu-Cu (100x100 GeV/n)
RHIC Research with Cu-Cu (31x31 GeV/n)
RHIC Research with Cu-Cu (11x11 GeV/n)
RHIC Research with p-p (100x100 GeV)
RHIC Research with p-p (205x205 GeV)
NSRL (NASA Radiobiology)
AGS (NASA)
Shutdown (RHIC)
C-A Operations-FY05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2005
14 Jun 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - as run
32 weeks
p,O(2),Si,Fe(2),Ti
Sep
schedule to be determined
pending funding
p,C,O,Si,Fe(2)
p,Ti,,Si,Fe(2)
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY05, 2-7-05
http://www.c-ad.bnl.gov/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Cu-Cu (100x100 GeV/n)
RHIC Research with Cu-Cu (31x31 GeV/n)
RHIC Research with Cu-Cu (11x11 GeV/n)
RHIC Research with p-p (100x100 GeV)
NSRL (NASA Radiobiology)
AGS (NASA)
Shutdown (RHIC)
C-A Operations-FY05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2005
10 Feb 05
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - subject to change
32 weeks
p,O(2),Si,Fe(2),Ti
Sep
schedule to be determined
pending approval/funding
p,C,O,Si,Fe(2)
To be finalized
http://www.c-ad.bnl.gov/esfd
RHIC-AGS FY05, 11-9-04
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Cu-Cu (100x100 GeV/n)
RHIC Research with Cu-Cu (31x31 GeV/n)
RHIC Research with p-p (100x100 GeV)
NSRL (NASA Radiobiology)
AGS (NASA)
Shutdown (RHIC)
C-A Operations-FY05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2005
9 Nov 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - assumes presidential budget, subject to change
27 weeks
p,O(2),Si,Fe(2),Ti
Sep
schedule to be determined
pending proposal/funding
RHIC-AGS FY04-05, 11-9-04 ( (3)
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Au-Au (100x100 GeV/n)
RHIC Research with Au-Au (31x31 GeV/n)
RHIC p-p (100x100 GeV) Development Run
AGS 22 GeV/c Protons (RSVP-K0PI0 tests)
AGS 22 GeV/c Protons (US Atlas)
NSRL (NASA Radiobiology)
AGS (NASA)
Shutdown (RHIC)
C-A Operations-FY04-05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2004
9 Nov 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2005
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
26.7 weeks
27 weeks, FY05presidential budget
pending proposal/funding
Schedule - As Run/planned
RUN 5 Plan A (2)
PLAN A (Assumes Presidential Budget)
RHIC RUN5 Plan as of 9/29/05
Week #DatesActivity
Week Beginning
14-OctNitrogen Cooldown Resumes (all sectors)
116-NovCryo On, Cu in AGS/ATR
223-NovCryo On, Cu in AGS/ATR
20-NovContinuing resolution ends - Budget known??
330-NovCu-Cu Setup in RHIC
47-DecCu-Cu Setup in RHIC
514-DecCu-Cu Setup in RHIC
621-DecCu-Cu Setup in RHIC
728-DecCu-Cu Physics week 1
84-JanCu-Cu Physics week 2
911-JanCu-Cu Physics week 3
1018-JanCu-Cu Physics week 4
1125-JanCu-Cu Physics week 5
121-FebCu-Cu Physics week 6
138-FebCu-Cu Physics week 7
1415-FebCu-Cu Physics week 8
1522-Febpp Setup
161-Marpp Setup
1728-Febpp Setup
188-Marpp Physics week 1
1922-Marpp Physics week 2
2029-Marpp Physics week 3
215-Aprpp Physics week 4
2212-Aprpp Physics week 5
2319-Aprpp Physics week 6
2426-Aprpp Physics week 7
253-Maypp Physics week 8
2610-Maypp Physics week 9
2717-MayWarmup
2824-MayPossible Run Extension with added $'s
2931-MayPossible Run Extension with added $'s
308-JunPossible Run Extension with added $'s
3114-JunPossible Run Extension with added $'s
15-JunNYPA/LIPA Energy Curtailment Program Begins
RHIC-AGS FY04-05, 11-9-04
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Au-Au (100x100 GeV/n)
RHIC Research with Au-Au (31x31 GeV/n)
RHIC p-p (100x100 GeV) Development Run
AGS 22 GeV/c Protons (RSVP-K0PI0 tests)
AGS 22 GeV/c Protons (US Atlas)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY04-05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2004
9 Nov 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2005
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
26.7 weeks
27 weeks, FY05presidential budget
pending funding
Schedule - As Run/planned
RUN 5 Plan C
PLAN C (Assumes Presidential Budget)
RHIC RUN5 Yet Another Proposed Plan
Week #DatesActivity
17-NovNitrogen Cooldown Resumes (all sectors)
20-NovContinuing resolution ends - Budget known??
24-Nov(Wednesday) Decide on strategy for the run
16-Dec12-DecCryo On, Cu in AGS/ATR
213-Dec19-DecCryo On, Cu in AGS/ATR
320-Dec26-DecCu-Cu Setup in RHIC
427-Dec2-JanCu-Cu Setup in RHIC
53-Jan9-JanCu-Cu Setup in RHIC
610-Jan16-JanCu-Cu Setup in RHIC
717-Jan23-JanCu-Cu Physics week 1
824-Jan30-JanCu-Cu Physics week 2
931-Jan6-FebCu-Cu Physics week 3
107-Feb13-FebCu-Cu Physics week 4
1114-Feb20-FebCu-Cu Physics week 5
1221-Feb27-FebCu-Cu Physics week 6
1328-Feb6-MarCu-Cu Physics week 7
147-Mar13-Marpp Setup
1514-Mar20-Marpp Setup
1621-Mar27-Marpp Setup
1728-Mar3-Aprpp Physics week 1
184-Apr10-Aprpp Physics week 2
1911-Apr17-Aprpp Physics week 3
2018-Apr24-Aprpp Physics week 4
2125-Apr1-Maypp Physics week 5
222-May8-Maypp Physics week 6
239-May15-Maypp Physics week 7
2416-May22-Maypp Physics week 8
2523-May29-MayWarmup
2630-May5-JunPossible Run Extension with added $'s
276-Jun12-JunPossible Run Extension with added $'s
2813-Jun14-Jun
2815-JunNYPA/LIPA Energy Curtailment Program Begins
RUN 5 Plan A
PLAN A (Assumes Presidential Budget)
RHIC RUN5 Plan as of 9/29/05
Week #DatesActivity
14-OctNitrogen Cooldown Resumes (all sectors)
18-Nov14-NovCryo On, Cu in AGS/ATR
215-Nov21-NovCryo On, Cu in AGS/ATR
20-NovContinuing resolution ends - Budget known??
322-Nov28-NovCu-Cu Setup in RHIC
429-Nov5-DecCu-Cu Setup in RHIC
56-Dec12-DecCu-Cu Setup in RHIC
613-Dec19-DecCu-Cu Setup in RHIC
720-Dec26-DecCu-Cu Physics week 1
827-Dec2-JanCu-Cu Physics week 2
93-Jan9-JanCu-Cu Physics week 3
1010-Jan16-JanCu-Cu Physics week 4
1117-Jan23-JanCu-Cu Physics week 5
1224-Jan30-JanCu-Cu Physics week 6
1331-Jan6-FebCu-Cu Physics week 7
147-Feb13-Febpp Setup
1514-Feb20-Febpp Setup
1621-Feb27-Febpp Setup
1728-Feb6-Marpp Physics week 1
187-Mar13-Marpp Physics week 2
1914-Mar20-Marpp Physics week 3
2021-Mar27-Marpp Physics week 4
2128-Mar3-Aprpp Physics week 5
224-Apr10-Aprpp Physics week 6
2311-Apr17-Aprpp Physics week 7
2418-Apr24-Aprpp Physics week 8
2525-Apr1-MayWarmup
262-May8-MayPossible Run Extension with added $'s
279-May15-MayPossible Run Extension with added $'s
2816-May22-MayPossible Run Extension with added $'s
2923-May29-MayPossible Run Extension with added $'s
3030-May5-JunPossible Run Extension with added $'s
316-Jun12-JunPossible Run Extension with added $'s
13-Jun14-Jun
15-JunNYPA/LIPA Energy Curtailment Program Begins
RUN 5 Plan B
PLAN B
RHIC RUN5 Plan - Proposed (Assumes Presidential Budget)
Week #DatesActivity
12-NovNitrogen Cooldown Resumes (all sectors)
20-NovContinuing resolution ends - Budget known??
24-Nov(Wednesday) Decide on strategy for the run
11-Dec7-DecCryo On, Cu in AGS/ATR
28-Dec14-DecCryo On, Cu in AGS/ATR
315-Dec21-DecCu-Cu Setup in RHIC
422-Dec28-DecCu-Cu Setup in RHIC
529-Dec4-JanCu-Cu Setup in RHIC
65-Jan11-JanCu-Cu Setup in RHIC
712-Jan18-JanCu-Cu Physics week 1
819-Jan25-JanCu-Cu Physics week 2
926-Jan1-FebCu-Cu Physics week 3
102-Feb8-FebCu-Cu Physics week 4
119-Feb15-FebCu-Cu Physics week 5
1216-Feb22-FebCu-Cu Physics week 6
1323-Feb1-MarCu-Cu Physics week 7
142-Mar8-Marpp Setup
159-Mar15-Marpp Setup
1616-Mar22-Marpp Setup
1723-Mar30-Marpp Physics week 1
1831-Mar5-Aprpp Physics week 2
196-Apr12-Aprpp Physics week 3
2013-Apr20-Aprpp Physics week 4
2120-Apr6-Maypp Physics week 5
2227-Apr3-Maypp Physics week 6
234-May10-Maypp Physics week 7
2411-May17-Maypp Physics week 8
2518-May24-MayWarm-up
2625-May31-MayPossible Run Extension with added $'s
271-Jun7-JunPossible Run Extension with added $'s
288-Jun14-JunPossible Run Extension with added $'s
2915-JunNYPA/LIPA Energy Curtailment Program Begins
30
31
RHIC-AGS FY04, 9-31-04
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Au-Au (100x100 GeV/n)
RHIC Research with Au-Au (31x31 GeV/n)
RHIC p-p (100x100 GeV) Development Run
AGS 22 GeV/c Protons (RSVP-K0PI0 tests)
AGS 22 GeV/c Protons (US Atlas)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY04
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2004
31 Sep 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Schedule - As Run
26.7 weeks
O(2),Fe(2),Si,Ti,p
p & Fe(2)
C,Si,Fe(2),Ti
C,Fe(2),Ti
RHIC-AGS FY04-05, 9-17-04
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Au-Au (100x100 GeV/n)
RHIC Research with Au-Au (31x31 GeV/n)
RHIC p-p (100x100 GeV) Development Run
AGS 22 GeV/c Protons (RSVP-K0PI0 tests)
AGS 22 GeV/c Protons (US Atlas)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY04-05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2004
17 Sep 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2005
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
26.7 weeks
25 weeks, FY05presidential budget
pending funding
Schedule - As Run/planned
RHIC-AGS FY04-05, 8-31-04
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Au-Au (100x100 GeV/n)
RHIC Research with Au-Au (31x31 GeV/n)
RHIC p-p (100x100 GeV) Development Run
AGS 22 GeV/c Protons (RSVP-K0PI0 tests)
AGS 22 GeV/c Protons (US Atlas)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY04-05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2004
31 Aug 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2005
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
26.7 weeks
25 weeks, FY05presidential budget
pending funding
Schedule - As Run/planned
RHIC-AGS FY04-05, 6-17-04
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Au-Au (100x100 GeV/n)
RHIC Research with Au-Au (31x31 GeV/n)
RHIC p-p (100x100 GeV) Development Run
AGS 22 GeV/c Protons (RSVP-K0PI0 tests)
AGS 22 GeV/c Protons (US Atlas)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY04-05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2004
17 Jun 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2005
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
26.7 weeks
31 weeks, FY05presidential budget
pending funding
Schedule - As Run/planned
RHIC-AGS FY04, 5-24-04 (2)
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo off
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Au-Au (100x100 GeV/n)
RHIC Research with Au-Au (31x31 GeV/n)
RHIC p-p (100x100 GeV) Development Run
AGS 22 GeV/c Protons (RSVP-K0PI0 tests)
AGS 22 GeV/c Protons (US Atlas)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY04
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2004
7 Jun 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Commissioning
schedule to be determined
Schedule - As Run/planned
NSRL-1
26.7 weeks
pending funding
O(3),Fe(2),Si,p
p & Fe(2)
C,Si,Fe(2),Ti
C,Fe(2),Ti
NSRL-2
NSRL-3
NSRL-4
RHIC-AGS FY05, 6-4-04
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC with colliding beams
RHIC Research with Fe-Fe(?) (100x100 GeV/n)
RHIC Research with pp (100x100 GeV/n)
AGS 22 GeV/c Protons (RSVP-tests)
RSVP Construction Start (earliest)
NSRL (NASA Radiobiology)
AGS (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY05
Program Element
Sep
4 Jun 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2005
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
31 weeks, FY05presidential budget
pending funding
Schedule - possible
O(3),Fe(2),Si,p
RHIC-AGS FY04-05, 5-10-04
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC Research with colliding beams
RHIC Research with Au-Au (100x100 GeV/n)
RHIC Research with Au-Au (31x31 GeV/n)
RHIC p-p (100x100 GeV) Development Run
AGS 24 GeV/c Protons (RSVP-K0PI0 tests)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY04-05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2004
10 May 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2005
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
subject to funding etc.
26 weeks, FY04actual budget
31 weeks, FY05presidential budget
pending funding
RHIC-AGS FY03, 9-31-03
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC Research with colliding beams
RHIC Research with d-Au (100x100 GeV/n)
RHIC Research with p-p (100x100 GeV)
AGS 7.5 & 24 GeV/c Protons (NNSA - proton radiography)
AGS Fe 0.6-1 GeV/n (SEB-NASA)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY03
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2003
31 Sept 03
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Commissioning
schedule to be determined
Schedule - As Run
31 weeks
pending funding
RHIC-AGS FY03-04, 9-28-03
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC Research with colliding beams
RHIC Research with d-Au (100x100 GeV/n)
RHIC Research with p-p (100x100 GeV)
AGS 7.5 & 24 GeV/c Protons (NNSA - proton radiography)
AGS 24 GeV/c Protons (RSVP tests)
AGS Fe 0.6-1 GeV/n (SEB-NASA)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY03-04
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2003
28 Sept 03
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2004
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
FY 2004 subject to funding etc.
31 weeks
27 weeks, FY04presidential budget
pending funding
RHIC-AGS FY04-05, 2-17-04
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC Research with colliding beams
RHIC Research with Au-Au (100x100 GeV/n)
RHIC p-p (100x100 GeV) Development Run
AGS 24 GeV/c Protons (RSVP-K0PI0 tests)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY04-05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2004
17 Feb 04
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2005
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
subject to funding etc.
25 weeks, FY04actual budget
31 weeks, FY05presidential budget
pending funding
RHIC-AGS FY04-05, 9-28-03
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC Research with colliding beams
RHIC Research with d-Au (100x100 GeV/n)
RHIC Research with p-p (100x100 GeV)
AGS 7.5 & 24 GeV/c Protons (NNSA - proton radiography)
AGS 24 GeV/c Protons (RSVP tests)
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY04-05
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2004
28 Sept 03
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2005
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
subject to funding etc.
27 weeks, FY04presidential budget
37 weeks, FY05budget request
pending funding
RHIC-AGS FY03-04, 4-8-03
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC Research with colliding beams
RHIC Research with d-Au (100x100 GeV/n)
RHIC Research with p-p (100x100 GeV)
AGS 25 GeV/c Protons (HEP, NP & Other)
AGS Fe 0.6-1 GeV/n (SEB-NASA)
NSRL 25 (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY03-04
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2003
9 Apr 03
U.S. Department of EnergyBrookhaven Science Associates
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2004
Commissioning
Jun
May
schedule to be determined
Jul
Sep
Aug
subject to funding etc.
29 weeks
27 weeks, FY04presidential budget
150 hrs NSRL initial run
250 hrs
250 hrs
RHIC-AGS FY03-04, 3-12-03
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC Research with colliding beams
RHIC Research with d-Au (100x100 GeV/n)
RHIC Research with p-p (100x100 GeV)
AGS 25 GeV/c Protons (HEP, NP & Other)
AGS Fe 0.6-1 GeV/n (SEB-NASA)
NSRL 25 (NASA Radiobiology)
Shutdown (AGS/RHIC)
C-A Operations-FY03-04
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2003
12 Mar 03
U.S. Department of EnergyBrookhaven Science Associates
Concurrent with RHIC operations
No BAF/SEB/FEB operation
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2004
Commissioning
Jun
May
Oct
with additional funds
Jul
Sep
Aug
subject to funding etc.
NSRL Project Complete
500 hrs NSRL, schedule to be determined
29 weeks
26 weeks, FY04presidential budget
150 hrs NSRL initial run
RHIC-AGS FY03-04, 3-10-03
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC Research with colliding beams
RHIC Research with d-Au (100x100 GeV/n)
RHIC Research with p-p (100x100 GeV)
AGS 25 GeV/c Protons (HEP, NP & Other)
AGS Fe 0.6-1 GeV/n (SEB-NASA)
NSRL 25 (NASA Radiobiology)
Shutdown (AGS/RHIC)
C-A Operations-FY03-04
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2003
10 Mar 03
U.S. Department of EnergyBrookhaven Science Associates
Concurrent with RHIC operations
No BAF/SEB/FEB operation
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2004
Commissioning
Jun
May
Oct
with additional funds
Jul
Sep
Aug
subject to funding etc.
NSRL Project Complete
500 hrs NSRL, schedule to be determined
29 weeks, FY03presidential budget
25 weeks, FY04presidential budget
100 hrs NSRL initial run
RHIC-AGS FY03-04, 7-15-02
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC Research with colliding beams
AGS 25 GeV/c Protons (FEB-HEP,E962)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (SEB-HEP,E952)
AGS 25 GeV/c Protons (SEB-NP,E930)
AGS Fe 0.6-1 GeV/n (SEB-NASA)
BAF 25 (NASA Radiobiology)
Shutdown (AGS/RHIC)
C-A Operations-FY03-04
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2003
15 July 02
to be determined
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
Concurrent with RHIC operations
No BAF/SEB/FEB operation
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2004
Commissioning
Jun
May
Oct
As Required
Pulse on demand
Jul
Sep
Aug
subject to funding etc. AGS fixed target experiments (FEB and SEB)are contingent upon restoration of operations funds, currently no such funds are included in the FY 2003 presidential budget request
?
BAF Project Complete, followed by 100 hr initial run
500 hrs BAF, schedule to be determined
29 weekspresidential budget
37 weeks optimumRHIC schedule
RHIC-AGS FY01-02, 6-19-02 )
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
BLIP
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E913/E927/953)
AGS 25 GeV/c Protons (FEB-NNSA,E955/P963)
AGS 25 GeV/c Protons (FEB-BES,E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2001
19 June 02
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
FY 2002
AGS cycle on demand
Jun
Aug
Jul
Sep
Commissioning/tests
agreement with NYPAto reduce BNL powerto < 31 MW15 June-15 Sep
pending funding
RHIC-AGS FY03-04, 6-19-02
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Cryo Standby(or off)
RHIC Systems Test (no colliding beams)
RHIC Research with colliding beams
AGS 25 GeV/c Protons (FEB-HEP,E962)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS Fe 0.6-1 GeV/n (SEB-NASA)
BAF 25 (NASA Radiobiology)
Shutdown (AGS/RHIC)
C-A Operations-FY03-04
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2003
19 Jun 02
to be determined
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
Concurrent with RHIC operations
No BAF/SEB/FEB operation
setup/ramp up luminosity
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2004
Commissioning
Jun
May
Oct
As Required
Pulse on demand
Jul
Sep
Aug
subject to funding etc. AGS fixed target experiments (FEB and SEB)are contingent upon restoration of operations funds, currently no such funds are included in the FY 2003 presidential budget request
?
BAF Project Complete, followed by 100 hr initial run
500 hrs BAF, schedule to be determined
29 weekspresidential budget
37 weeks optimumRHIC schedule
RHIC-AGS FY01-02, 5-13-02
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
BLIP
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E913/E927)
AGS 25 GeV/c Protons (FEB-DP,E955/P963)
AGS 25 GeV/c Protons (FEB-BES,E956)
BAF Booster extraction commissioning
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2001
13 May 02
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
FY 2002
AGS cycle on demand
Jun
Aug
Jul
Sep
Commissioning/tests
agreement with NYPAto reduce BNL powerto < 31 MW15 June-15 Sep
probable extension
7 June
pending funding
17 May
RHIC-AGS FY01-02, 5-7-02
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
BLIP
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E913/E927)
AGS 25 GeV/c Protons (FEB-DP,E955/P963)
AGS 25 GeV/c Protons (FEB-BES,E956)
BAF Booster extraction commissioning
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2001
7 May 02
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
FY 2002
AGS cycle on demand
Jun
Aug
Jul
Sep
Commissioning/tests
agreement with NYPAto reduce BNL powerto < 31 MW15 June-15 Sep
probable extensions
7 June
pending funding
17 May
RHIC-AGS FY01-02, 2-21-02
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E913/E927)
AGS 25 GeV/c Protons (FEB-DP,E955/963)
AGS 25 GeV/c Protons (FEB-BES,E956)
BAF Booster extraction commissioning
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2001
21 Feb 02
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
FY 2002
AGS cycle on demand
Jun
Aug
Jul
Sep
Commissioning/tests
9~19 Apr
agreement with NYPAto reduce BNL powerto < 31 MW15 June-15 Sep
possible extension (1-2 weeks?)is so, the schedule slips accordingly
RHIC-AGS FY03-04, 3-4-02
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)
RHIC Cryo Standby
RHIC Research with colliding HI/pp beams
RHIC Research with colliding pp beams
AGS Fe 0.6-1 GeV/n (SEB-NASA)
AGS 25 GeV/c Protons (FEB-HEP,E962)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (FEB-NNSA,P963)
AGS 25 GeV/c Protons (SEB - NSF, RSVP)
BAF 25 (NASA Radiobiology)
Shutdown (AGS/RHIC)
C-A Operations-FY03-04
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2003
4 Mar 02
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
Concurrent with RHIC operations
BAF/SEB/FEB operation blackout
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
FY 2004
Commissioning
Jun
May
Oct
As Required
Pulse on demand
Jul
29 weekspresidential budget
37 weeks optimumRHIC schedule
Sep
Aug
600 hrs BAF in 30 weeks
subject to funding etc. AGS fixed target experiments (FEB and SEB)are contingent upon restoration of operations funds, currently no such funds are included in the FY 2003 presidential budget request
available for BAF operationsif $'s made available
?
?
BAF Project Complete
?
RHIC-AGS FY01-02, 2-14-02
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E913/E927)
AGS 25 GeV/c Protons (FEB-DP,E955/963)
AGS 25 GeV/c Protons (FEB-BES,E956)
BAF Booster extraction commissioning
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2001
14 Feb 02
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Oct
FY 2002
AGS cycle on demand
Jun
Aug
Jul
Sep
Commissioning/tests
9-19 Apr
agreement with NYPAto reduce BNL powerto < 31 MW15 June-15 Sep
fixed at 5 months for BAFBooster work
possible extension (1-2-3 weeks?)is so, the schedule slips accordingly
RHIC-AGS FY01-02, 10-22-01
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E927/953/958)
AGS 25 GeV/c Protons (FEB-DP,E955)
AGS 25 GeV/c Protons (FEB-BES,E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2001
22 Oct 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
AGS cycle on demand
~Current RHIC Budget Limit
?
SEB ends when AGS pp studies begin
?
?
?
8 Nov
26 Nov
26-29 Nov
~20 Dec
~24 Jan
RISK Zone
NOT FOR DISTRIBUTION, FOR DISCUSSION ONLY
RHIC-AGS FY01-02, 10-3-01
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E927/953/958)
AGS 25 GeV/c Protons (FEB-DP,E955)
AGS 25 GeV/c Protons (FEB-BES,E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2001
3 Oct 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
AGS cycle on demand
~Current RHIC Budget Limit
?
SEB ends when AGS pp studies begin
?
?
?
8 Nov
26 Nov
26-29 Nov
~20 Dec
~24 Jan
RISK Zone
Preliminary schedule, subject to funding and other issues
RHIC-AGS FY01-02, 8-21-01
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E927/953/958)
AGS 25 GeV/c Protons (FEB-DP,E955)
AGS 25 GeV/c Protons (FEB-BES,E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
FY 2001
21 Aug 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
AGS cycle on demand
~Current RHIC Budget Limit
?
SEB ends when AGS pp studies begin
pp start date to be determined
?
?
?
RHIC-AGS FY01-02, 8-6-01
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E927/953/958)
AGS 25 GeV/c Protons (FEB-DP,E955)
AGS 25 GeV/c Protons (FEB-BES,E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
FY 2001
6 Aug 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
AGS cycle on demand
~Current RHIC Budget Limit
?
SEB ends when AGS pp studies begin
pp start date to be determined
?
?
?
RHIC-AGS FY01-02, 7-17-01
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E927/953/958)
AGS 25 GeV/c Protons (FEB-DP,E955)
AGS 25 GeV/c Protons (FEB-BES,E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
FY 2001
18 July 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
AGS cycle on demand
~Current RHIC Budget Limit
?
SEB ends when AGS pp studies begin
pp start date to be determined
?
?
?
RHIC-AGS FY01-02, 6-29-01
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E927/953/958)
AGS 25 GeV/c Protons (FEB-DP,E955)
AGS 25 GeV/c Protons (FEB-BES,E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
FY 2001
29 June 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
AGS cycle on demand
~Current RHIC Budget Limit
?
SEB ends when AGS pp studies begin
pp start date to be determined
?
?
?
RHIC-AGS FY01-02, 6-8-01
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fixed Target Experiments
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E927/953/958)
AGS 25 GeV/c Protons (FEB-DP,E955)
AGS 25 GeV/c Protons (FEB-BES,E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
FY 2001
8 June 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
AGS cycle on demand
~Current RHIC Budget Limit
?
SEB ends when AGS pp studies begin
pp start date to be determined
FY 2002 SEB/FEB schedule to be determined
RHIC-AGS FY01-02, 6-7-01
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E927/953/958)
AGS 25 GeV/c Protons (FEB-DP,E955)
AGS 25 GeV/c Protons (FEB-BES,E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
FY 2001
7 June 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
AGS cycle on demand
~Current RHIC Budget Limit
?
?
?
SEB ends when AGS pp studies begin
pp start date to be determined
RHIC-AGS FY01-02 detailed
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown/Warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957/960)
AGS 25 GeV/c Protons (FEB-HEP,E821)
AGS 25 GeV/c Protons (SEB-HEP,E949)
AGS 25 GeV/c Protons (FEB-HEP,E951)
AGS 25 GeV/c Protons (SEB-NP,E930/931)
AGS 25 GeV/c Protons (SEB-NP,E927/953/958)
AGS 25 GeV/c Protons (FEB-DP,E955)
AGS 25 GeV/c Protons (FEB-BES,E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
FY 2001
1 May 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
AGS cycle on demand
Current RHIC Budget Limit
?
?
?
?
RHIC-AGS FY01-02 fwp
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-HEP/NP)
AGS 25 GeV/c Protons (FEB-E955)
AGS 25 GeV/c Protons (FEB-E951/E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
FY 2001
22 Feb 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
C-Line Only
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
End Date To Be Determined
C-AD FY00-01 Run (FWP)
AGS-Booster-Tandem Startup
RHIC Maintenance
RHIC Cryo Cooldow/tests/warmup
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Studies/Polarized Beam Commissioning
RHIC Research with colliding beams
AGS Fe 0.6-1 GeV/n (SEB-NASA)
AGS 25 GeV/c Protons (FEB-E821)
AGS Protons (FEB-955,956,951)
AGS 25 GeV/c Protons (SEB-HE/NP)
Shutdown
C-A Operations-FY00-01
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Schedule - As Run/planned
May
Jun
Jul
Aug
Sep
Oct
FY 2000
12 Jan 01
RHIC Shield Walls Up
standby
U.S. Department of EnergyBrookhaven Science Associates
g=30 Au beam collisins observed
g=70 Au beam collisins observed
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
FY 2001
RHIC-AGS FY01 post PAC (2)
http://server.c-ad.bnl.gov/esfd
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-HEP/NP)
AGS 25 GeV/c Protons (FEB-E955)
AGS 25 GeV/c Protons (FEB-E951/E956)
Shutdown
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
FY 2001
11 Jan 01
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
C-Line Only
setup
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
FY 2002
End Date To Be Determined
RHIC-AGS FY01 post PAC
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding HI beams
RHIC Research with colliding pp beams
AGS Polarized Proton Studies (No SEB)
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-E949/E930/E931)
AGS 25 GeV/c Protons (FEB-E955)
AGS 25 GeV/c Protons (FEB-E951/E956)
Shutdown
C-A Operations-FY01
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
Oct
FY 2001
4 Dec 00
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
C-Line Only
setup
RHIC-AGS FY01-02 (2)
PLAN A
RHIC Cryo Cooldow/Operation/Warmup
RHIC Research with HI beams
RHIC Research with polarized protons
Shutdown(RHIC Experiments)
PLAN B
RHIC Cryo Cooldow/Operation/Warmup
RHIC Research with HI beams
RHIC Research with polarized protons
Shutdown (RHIC Experiments)
PLAN C
RHIC Cryo Cooldow/Operation/Warmup
RHIC Research with HI beams
RHIC Research with polarized protons
Shutdown (RHIC Experiments)
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
for discussion only
May
Jun
Jul
Aug
Sep
FY 2001
28 Nov 00
FY 2002
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
RHIC-AGS FY01-02
PLAN A
RHIC Cryo Cooldow/Operation
RHIC Research with HI beams
RHIC Research with polarized protons
Shutdown(RHIC Experiments)
PLAN B
RHIC Cryo Cooldow/Operation
RHIC Research with HI beams
RHIC Research with polarized protons
Shutdown (RHIC Experiments)
C-A Operations-FY01-02
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
for discussion only
May
Jun
Jul
Aug
Sep
FY 2001
27 Nov 00
U.S. Department of EnergyBrookhaven Science Associates
FY 2002
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
RHIC-AGS FY01 (7)
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding beams
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-E949/E930/E931)
AGS 25 GeV/c Protons (FEB-E955)
AGS 25 GeV/c Protons (FEB-E951/E956)
Shutdown
C-A Operations-FY01
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
Oct
FY 2001
28 Nov 00
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
End g-2 start SEB??
RHIC-AGS FY01 (power)
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding beams
AGS Fe 0.6-1 GeV/n (SEB-NASA)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-E949/E930/E931)
AGS 25 GeV/c Protons (FEB-E933')
AGS 25 GeV/c Protons (FEB-E951/E938)
Shutdown
C-A Operations-FY01
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
Oct
FY 2001
9 Sep 00
U.S. Department of EnergyBrookhaven Science Associates
DRAFT
?
?
g-2 cryo startup
proposed
subject to conditions
concurrent with RHIC operations
6 MW
15 MW
12 MW
6 MW
RHIC-AGS FY01 (6)
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding beams
AGS Fe 0.6-1 GeV/n (SEB-NASA, E957)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-E949/E930/E931)
AGS 25 GeV/c Protons (FEB-E955)
AGS 25 GeV/c Protons (FEB-E951/E956)
Shutdown
C-A Operations-FY01
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
Oct
FY 2001
14 Nov 00
U.S. Department of EnergyBrookhaven Science Associates
g-2 cryo startup
concurrent with RHIC operations
to be determined
RHIC-AGS FY01 (5)
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding beams
AGS Fe 0.6-1 GeV/n (SEB-NASA)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-E949/E930/E931)
AGS 25 GeV/c Protons (FEB-E955)
AGS 25 GeV/c Protons (FEB-E951/E938)
Shutdown
C-A Operations-FY01
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
Oct
FY 2001
9 Sep 00
U.S. Department of EnergyBrookhaven Science Associates
DRAFT
?
?
g-2 cryo startup
subject to conditions
concurrent with RHIC operations
RHIC-AGS FY01 (4)
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding beams
AGS Fe 0.6-1 GeV/n (SEB-NASA)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-E949/E930/E931)
AGS 25 GeV/c Protons (FEB-E933')
AGS 25 GeV/c Protons (FEB-E951/E938)
Shutdown
C-A Operations-FY01
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
Oct
FY 2001
27 Jul 00
U.S. Department of EnergyBrookhaven Science Associates
DRAFT
?
?
g-2 cryo startup
to be proposed
subject to conditions
concurrent with RHIC operations
RHIC-AGS FY01-03-other (2)
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding beams
RHIC Research with polarized protons
AGS Fe 0.6-1 GeV/n (SEB-NASA)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-E949/E930/E931)
AGS 25 GeV/c Protons (FEB-E933)
AGS 25 GeV/c Protons (FEB-E951/E938)
Shutdown
C-A Operations-FY01-03
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
FY 2001
25 Jul 00
U.S. Department of EnergyBrookhaven Science Associates
DRAFT- No PHENIX Consideration
FY 2002
FY 2003
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
BAF Construction in Booster
RHIC-AGS FY01 (3)
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)As Required
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding beams
AGS Fe 0.6-1 GeV/n (SEB-NASA)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-E949/E930/E931)
AGS 25 GeV/c Protons (FEB-E933)
AGS 25 GeV/c Protons (FEB-E951/E938)
Shutdown
C-A Operations-FY01
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
Oct
FY 2001
19 Jul 00
U.S. Department of EnergyBrookhaven Science Associates
OR
OR
OR
DRAFT
RHIC-AGS FY01 (2)
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding beams
AGS Fe 0.6-1 GeV/n (SEB-NASA)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-E949/E930/E931)
AGS 25 GeV/c Protons (FEB-E933)
AGS 25 GeV/c Protons (FEB-E951/E938)
Shutdown
AGS-Booster-Tandem Startup
C-A Operations-FY01
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
Oct
FY 2001
20 Mar 00
depends on $'s
standby
U.S. Department of EnergyBrookhaven Science Associates
RHIC-AGS FY01
AGS-Booster-Tandem Startup
RHIC Cryo Cooldown
RHIC Cryo Operation
RHIC Systems Test (Ramping etc, no beam)
RHIC Cryo Standby(or off)
RHIC Startup with beams
RHIC Research with colliding beams
AGS Fe 0.6-1 GeV/n (SEB-NASA)
AGS 25 GeV/c Protons (FEB-E821)
AGS 25 GeV/c Protons (SEB-E949/E930/E931)
AGS 25 GeV/c Protons (FEB-E933)
AGS 25 GeV/c Protons (FEB-E951/E938)
Shutdown
AGS-Booster-Tandem Startup
C-A Operations-FY01
Program Element
Oct
Nov
Dec
Jan
Feb
Mar
Apr
Preliminary schedule, subject to funding and other issues
May
Jun
Jul
Aug
Sep
Oct
FY 2001
10 Mar 00
-
As of 20 Feb
Chart6
0.37655112180.0397867621
0.375582190.0388783886
0.33724882550.039241738
0.36637733790.0387572721
0.36492394010.0385755974
0.36559008080.0400289951
0.36801241030.0399684369
0.36722515320.0749710982
0.72706220140.0388783886
2.05431709620.0385755974
2.09246878590.0386967139
1.92605474880.0391206215
1.46605437550.0396050874
1.56016187690.0381516897
1.37043291830.0405740192
1.29091995220.0399684369
1.28837650630.038212248
1.01919513980.0396050874
1.03996661540.0393628545
1.01695448510.0389389468
1.03778651880.0386967139
1.04826309390.0395445292
0.82389482340.0393628545
0.36286496010.0389389468
0.36425779950.0395445292
0.3669223620.2614904702
0.36595343020.4231809648
0.3643789160.4036812123
0.36480282370.6445213234
1.10343164841.8062099965
2.17240565962.024461885
4.96153683223.1234727821
6.56312054365.7893073828
6.91326827385.9448814953
7.40251827586.7308063037
6.93276802637.9341590443
6.79318128857.4907516281
7.20485618816.1654345969
7.87184461776.4750083078
8.05376156366.4622305197
7.894130049238758
7.481667892438759
6.884260877938760
6.601877815738761
6.202617354838762
6.255605392238763
6.385078904338764
6.467014620438765
6.414510207838766
6.461140471438767
6.473857701338768
6.425289574138769
6.381869317738770
6.366790737138771
6.319131404138772
6.316587958138773
6.313681162738774
6.221148175538775
6.112567255438776
6.122680060538777
6.126556208338778
6.117411914438779
6.15883374938780
6.110508275338781
6.113536187238782
6.114323444338783
6.108509853538784
6.118441404438785
6.12698011638786
6.135094919838787
6.105239708638788
6.119713127438789
6.119046986838790
6.095005366538791
6.115292376138792
6.123225505238793
6.110447717138794
6.096095414738795
6.110326600638796
6.106814222838797
6.118017496838798
6.124376111738799
6.125890067738800
6.137940736438801
6.14115032338802
6.131279330338803
6.135639523438804
6.141453534838805
6.140060274738806
6.14139255638807
6.361824541138808
5.905215849638809
6.155684720638810
6.20776480538811
6.137698503538812
6.142482604338813
6.143088607238814
6.156411419538815
6.150294616938816
6.13121877238817
6.134488916938818
6.143875864338819
6.164102315638820
6.142361908338821
6.120924292238822
6.116503540838823
6.117411914438824
6.144965912538825
6.081319204838826
6.12698011638827
6.079684132338828
6.098820535438829
6.101424539738830
6.100213374938831
6.113051721338832
6.107540921738833
6.114626235538834
6.126192858938835
6.122377689938836
6.116382424438837
6.124800019438838
6.127827510738839
6.122680060538840
6.127040253738841
6.13273272838842
6.133096077438843
6.132066587438844
6.128009185538845
6.120136614638846
6.099062347938847
6.122680060538848
6.118319867438849
6.119773265138850
6.110628
top related