research ship activitiesresearch ship activities and new...
Post on 12-Aug-2020
2 Views
Preview:
TRANSCRIPT
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
Research Ship Activities andResearch Ship Activities and New Equipment Acquired
A t C t ll & J j D ñ b itiArturo Castellon & Juanjo Dañobeitiahttp://www.utm.csic.es/
Kiel December 3rd 2010
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
R/V García del Cid
20102010
94 cruise days94 cruise daysJAGO operations: 27 days
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
2011 120 cruise days plannedNew CTD cable
bl fNew Traction cable: certifications
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
B/O Novo As
•32 m O.L.
•293 Ton GT
Trawler1997 to be transformed
•359 kW
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
R/V Sarmiento de Gamboa
20102010First seismic cruises : 80 days
N i f d l d b UTMNew air guns frame developed by UTM
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
R/V Sarmiento de Gamboa
20102010
•IEO ROV Testing (2000 m)•IEO ROV Testing (2000 m)•Install. one compressor aboard
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
R/V Sarmiento de Gamboa
2011 Planned cruises2011 Planned cruises
SeismicsSeismicsPelagic fishingROVROV Bottom samplingCharteringCharteringEEZ program Total: 310 daysTotal: 310 days
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
R/V Sarmiento de Gamboa
2011 CHARTERING2011 CHARTERINGTwo basic prices: Academic and Private.Roughly 22000 euros per day (basics) and 25000 eurosRoughly 22000 euros per day (basics) and 25000 euros per day.Adding scenario extrasAdding scenario extras.How to proceed in academic chartering (internal and external)external)
Some figuresSome figures…Ship Seismics Echosounders OBS 25000 € 9356 € 3637 € 28200 €
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
R/V Hesperides
2010Antarctic cruiseTotal 130 cruise days
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
R/V Hespérides
2011Planned cruise2011Planned cruise
During 2011 Malaspina project will use about 50% ofDuring 2011 Malaspina project will use about 50% of ship time in circumnavigation.
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
New equipment AUV•Autonomy: 8 hrs@ 2.5 knots•Standard depth rating 100 m. •Extended Payload (2nd CPU + extra HHDD + external ports + API)• Safety tow float.
Water Quality [WQ] Vehicle:Water Quality [WQ] Vehicle:
• DVL + ADCP (10 beams). • W.Q. multiparameter sonde (CTD, Turbidity, Clorophyl, DO, pH,ORP )• Extended Depth rating to 200 m.
Camera [CAM] Vehicle:Camera [CAM] Vehicle:Camera [CAM] Vehicle:Camera [CAM] Vehicle:
• DVL + ADCP (6 beams), Wifi• Still+video cameras.
Sid (330 / 800 kH )• Sidescan (330 / 800 kHz.).
Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
New equipment HYDROBIOS Multinet 1 m2
UTM f iliti i P iñ (G li i )Kiel december 3rd 2010
Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation
Heavy equipment as containers
UTM facilities in Porriño (Galicia)
Heavy equipment as containers , compressors, winches etc, need of space , workshops, cranes, po er lines etc for maintenance
VIGO
power lines, etc for maintenance , storage and upgrade.
2UTM facilities in Porriño -1114 m2
–width 2 x 16 tons overhead cranes (FEDER Funds) were designed from the beginning for providing these aspects.
PORRIÑOIn the future a generator (700 kW) is needed for testing compressors etc
PORRIÑO
compressors etc. Also a forklift and a truck are needed.