Ocean Facilities Exchange Group a bottomup approach towards research fleet coordination and harmonisation Research Ship Activities and Research Ship Activities and New Equipment Acquired At C t ll &J j D ñ b iti Arturo Castellon & Juanjo Dañobeitia http://www.utm.csic.es/ Kiel December 3rd 2010

Upload: others

Post on 12-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

Research Ship Activities andResearch Ship Activities and New Equipment Acquired

A t C t ll & J j D ñ b itiArturo Castellon & Juanjo Dañobeitiahttp://www.utm.csic.es/

Kiel December 3rd 2010

Page 2: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

R/V García del Cid

20102010

94 cruise days94 cruise daysJAGO operations: 27 days

Page 3: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

2011  120  cruise days plannedNew CTD cable

bl fNew Traction cable: certifications

Page 4: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

B/O Novo As

•32 m O.L.

•293 Ton GT 

Trawler1997  to be transformed

•359 kW

Page 5: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

R/V Sarmiento de Gamboa

20102010First seismic cruises : 80 days

N i f d l d b UTMNew air guns frame developed by UTM

Page 6: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

R/V Sarmiento de Gamboa

20102010

•IEO ROV Testing (2000 m)•IEO ROV Testing (2000 m)•Install.   one compressor  aboard

Page 7: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

R/V Sarmiento de Gamboa

2011 Planned cruises2011 Planned cruises

SeismicsSeismicsPelagic fishingROVROV Bottom samplingCharteringCharteringEEZ program Total: 310 daysTotal: 310 days

Page 8: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

R/V Sarmiento de Gamboa

2011 CHARTERING2011 CHARTERINGTwo basic prices: Academic and Private.Roughly 22000 euros per day (basics) and 25000 eurosRoughly 22000 euros per day (basics) and 25000 euros per day.Adding scenario extrasAdding scenario extras.How to proceed in academic chartering (internal and external)external)

Some figuresSome figures…Ship Seismics Echosounders OBS 25000 € 9356 € 3637 € 28200 €

Page 9: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

R/V Hesperides

2010Antarctic cruiseTotal 130 cruise days 

Page 10: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

R/V Hespérides

2011Planned cruise2011Planned cruise

During 2011 Malaspina project will use about 50% ofDuring 2011 Malaspina project will use about 50% of ship time in circumnavigation.

Page 11: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

New equipment          AUV•Autonomy: 8 hrs@ 2.5 knots•Standard depth rating 100 m. •Extended Payload (2nd CPU + extra HHDD + external ports + API)• Safety tow float.

Water Quality [WQ] Vehicle:Water Quality [WQ] Vehicle:

• DVL + ADCP (10 beams). • W.Q. multiparameter sonde (CTD, Turbidity, Clorophyl, DO, pH,ORP )• Extended Depth rating to 200 m.

Camera [CAM] Vehicle:Camera [CAM] Vehicle:Camera [CAM] Vehicle:Camera [CAM] Vehicle:

• DVL + ADCP (6 beams), Wifi• Still+video cameras.

Sid (330 / 800 kH )• Sidescan (330 / 800 kHz.).

Page 12: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

New equipment  HYDROBIOS Multinet 1  m2

Page 13: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

UTM f iliti i P iñ (G li i )Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

Heavy equipment as containers

UTM facilities in Porriño (Galicia)

Heavy equipment as containers , compressors, winches etc, need of space , workshops, cranes, po er lines etc for maintenance

VIGO

power lines, etc for maintenance , storage and upgrade.

2UTM facilities in Porriño -1114 m2

–width 2 x 16 tons overhead cranes (FEDER Funds) were designed from the beginning for providing these aspects.

PORRIÑOIn the future a generator (700 kW) is needed for testing compressors etc

PORRIÑO

compressors etc. Also a forklift and a truck are needed.

Page 14: Research Ship ActivitiesResearch Ship Activities and New ...digital.csic.es/bitstream/10261/42749/1/Castellon_et_al_2010.pdf · Kiel december 3rd 2010 Ocean Facilities Exchange Group

Kiel december 3rd 2010

Ocean Facilities Exchange Groupa bottom‐up approach towards research fleet co‐ordination and harmonisation

UTM facilities in

Porriño (Galicia)