Friday, 8 September 2006Friday, 8 September 2006 page page 1

Disaster Mitigation Efforts in Indonesia

presented atSecond Asian Science and Technology Forum

Tokyo, 8 September 2006

byDr. Idwan Suhardi

Deputy Minister for Utilization and Dissemination of Research and Technology

State Ministry of Research and TechnologyRepublic of Indonesia

State Ministry of Research and TechnologyRepublic of IndonesiaRepublic of Indonesia

Friday, 8 September 2006Friday, 8 September 2006 page page 2

OUTLINEOUTLINE

1.1. INTRODUCTIONINTRODUCTION

22 RECENTRECENT DISASTERDISASTER

3. CURRENT STATUS OF INDONESIAN TSUNAMI EARLY WARNING SYSTEMS

4. END4. END--TOTO--END TSUNAMI SIMULATION IN PADANG END TSUNAMI SIMULATION IN PADANG CITY ON 26 DECEMBER 2005CITY ON 26 DECEMBER 2005

Friday, 8 September 2006Friday, 8 September 2006 page page 3

1.1. INTRODUCTIONINTRODUCTION

Friday, 8 September 2006Friday, 8 September 2006 page page 4

The Indonesian region very complicated plates convergence : subduction, collision, back-arc thrusting, back-arc and opening faults

Moving relatively to each other • the India-Australia plate :

moving northward • the Philippine sea plate :

moving west-northwestward. • the Caroline plate : moving

east-southeastward (near Aru) and west-northwestward (near Yap trench)

Every year about 460earthquakes (M > 4.0 )

Tectonic Setting and Tectonic Setting and SeismicitySeismicity of Indonesiaof Indonesia

Friday, 8 September 2006Friday, 8 September 2006 page page 5

Earthquake and Tsunami HistoryEarthquake and Tsunami History

EARTHQUAKE WITH M ≥ 7.0 RSIN INDONESIA, 1900 - 2004

EARTHQUAKE WITH M ≥ 7.0 RSIN INDONESIA, 1900 - 2004

A. TOTAL : 212

B. IN THE SEA : 182 ( 86 % )

C. SHALLOW IN THE SEA : 153 ( 72 % )

D. GENERATED TSUNAMI) : 86 ( 40 % )

A. TOTAL : 212

B. IN THE SEA : 182 ( 86 % )

C. SHALLOW IN THE SEA : 153 ( 72 % )

D. GENERATED TSUNAMI) : 86 ( 40 % )

modified from : Latif and Guisakof

Friday, 8 September 2006Friday, 8 September 2006 page page 6

Earthquake Events in IndonesiaEarthquake Events in Indonesia

EARTHQUAKE with MAGNITUDE ≥ 7.0 RS(1900 – 2004)

212 event11%

1756 event89%

Indonesia

Out of Indonesia

TOTAL NUMBER OF Earthquakes = 1968 event

Friday, 8 September 2006Friday, 8 September 2006 page page 7

2. Recent Disaster2. Recent DisasterAcehAceh TsunamiTsunami

MerapiMerapi EruptionEruptionJogjaJogja EarthquakeEarthquake

PangandaranPangandaran TsunamiTsunami

Friday, 8 September 2006Friday, 8 September 2006 page page 8

Tsunami Tsunami AcehAceh : a brief reminder : a brief reminder 

• 132,000 confirmed dead• 37,000 missing• 572,000 displaced• 1.3 million homes and buildings destroyed• 8 ports and 4 fuel deports damaged• 85% of the water and 92% of the sanitation

system broke down• 120 km of roads and 18 main bridges

demolished• total losses amount to US$ 4.5 billion, which

represents 2.2% of National GDP and 97%of Aceh’s GDP

Friday, 8 September 2006Friday, 8 September 2006 page page 9

the causes the causes 

Catastrophic earthquakeScale 9 with shallow epicenter offshoreVery strong ground shaking for 4 minutes felt in many areasPeople moved out of their houses out of fear

Followed by a tsunamiWave height ranging from 4 – 35 mMost people have never seen such calamity in their livesDid not know what to do – chaoticNo warning was issued

Friday, 8 September 2006Friday, 8 September 2006 page page 10

What remains What remains 

Friday, 8 September 2006Friday, 8 September 2006 page page 11

Volcanic Eruption : Mount Volcanic Eruption : Mount MerapiMerapi

page page 12

The The MerapiMerapi CycleCycle

During the period of 1006 to 2001 Mount Merapi has erupted 82 times.

• Short cycle 2-5 years• Medium cycle 5-7 years

The last three eruptions (1997,1998, 2001) no casualties, but two people died during 2006 eruption.

Friday, 8 September 2006Friday, 8 September 2006 page page 13

The The JogjaJogja Earthquake, Earthquake, 27 May 200627 May 2006

Earthquake with 5.9 SR6,234 people died7,057 houses collapse, including several historical sitesJogja airport was closed for several daysTotal losses is estimated at US$ 3 billion

Friday, 8 September 2006Friday, 8 September 2006 page page 14

Earthquake and Tsunami, Earthquake and Tsunami, 17 July 200617 July 2006

Friday, 8 September 2006Friday, 8 September 2006 page page 15

…… the victimsthe victims

Friday, 8 September 2006Friday, 8 September 2006 page page 16

6.70m+7:41:53.2S109:15:51.8EWidara Payung

4.69m7:41:37.6S108:39:06.0EPangandaran

7.67m7:41:01.2S108:36:43.3EBulak Laut

5.34m7:41:31.9S108:32:09.4EBatu Hiu

2.12m7:44:48.6S108:29:51.3EBatukaras

5.9m7:49:10.2S108:26:32.1E

3.67m7:48:56.0S108:24:09.9E

3.74m+7:45:52.8S108:03:35.7ESindangkerta

5.20m7:40:05.9S107:41:26.6EPameungpeuk

Inundation height

LatitudeLongitudeLocation

…… maximum : 7 m wavemaximum : 7 m wave

Friday, 8 September 2006Friday, 8 September 2006 page page 17

2. CURRENT STATUS OF INDONESIAN TEWS

Friday, 8 September 2006Friday, 8 September 2006 page page 18

in response to in response to AcehAceh tsunami, tsunami, 

• Government formed the Reconstruction and Rehabilitation Agency (BRR)

• Ministry of Research and Technology responsible in coordinating various agencies in the Development of TsunamiWarning Systems throughout Indonesia

BAKOSURTANALBPPT LAPAN LIPI BMGDKP

ESDM BAPPENASKOMINFODEPLUKLHBAKORNAS PBP

ITB

Friday, 8 September 2006Friday, 8 September 2006 page page 19

Summary of GrandSummary of Grand--scenarioscenario

Sensing Devices :•Seismometer•Accelerometer•OBU :

- Seismometer- Accelerometer- Pressure

•GPS

Transmit Data :Bottom to Surface,Surface to center

Processing Center

Transmit Information :SR/MMILocation (LS+BT)DepthTimePredict : Tsunami ?

Recipients :•Bakornas•Satkorlak•Satlak•Media

Geo Input

Recipients :•Bakornas•Satkorlak•Satlak•Media

COMMUNITY

Friday, 8 September 2006Friday, 8 September 2006 page page 20

Schematic Diagram of Basic Design Schematic Diagram of Basic Design 

Friday, 8 September 2006Friday, 8 September 2006 page page 21

Satellite in Satellite in Pacific systemPacific system

Bottom pressure Bottom pressure gaugegauge

OBSOBS

BuoyBuoy

Regional/NationalRegional/NationalCenterCenter

Coastal stationCoastal station

Coastal stationCoastal station

HAAHAA

Indian Ocean PlateIndian Ocean Plate

Satellite in Satellite in Indian OceanIndian Ocean

GTS or GTS or ACeSACeS

SeismographSeismograph

Tide gageTide gage

GPSGPS

© Jan Sopaheluwakan, 2005

Friday, 8 September 2006Friday, 8 September 2006 page page 22

Seismic MonitoringSeismographAccelerograph

Database of Tsunami ModelingSea level monitoring

DART - BUOYTide Gauge

Information and Communication TechnologyCrustal Deformation Monitoring

GPSGeospatial Information

Satellite ImageryTopographic and Bathymetric map

Community PreparednessCapacity Building

System ElementsSystem Elements

Friday, 8 September 2006Friday, 8 September 2006 page page 23

NO DEVICE PLANNED EXISTING

1 SEISMOGRAPH 160 units scattered in 10 Regional Offices issue warning within 5 minutes

58 units scattered in 5 Regional Offices issue warning within 20-30 minutes

2 ACCELEROGRAPH 500 Units 9 Units

Seismic Monitoring Seismic Monitoring 

Friday, 8 September 2006Friday, 8 September 2006 page page 24

DEVICE EXISTING PLAN

TIDE GAUGE

60 units (35 analog graphical chart and 25 digital tidal recording)

120 units of digital tidal recording

SeaSea‐‐level Monitoring level Monitoring 

Friday, 8 September 2006Friday, 8 September 2006 page page 25

Oceanographic MonitoringOceanographic MonitoringDEVICE EXISTING PLANNED

DART-BUOY 12 Units to only monitor sea environment 22 Units of Ocean Bottom Pressure Sensors

Friday, 8 September 2006Friday, 8 September 2006 page page 26

Plan to install Continuous GPS ( 27 GPS near tide gauges and 10 GPS near Buoys)

CrustalCrustal Deformation MonitoringDeformation Monitoring

Friday, 8 September 2006Friday, 8 September 2006 page page 27

Tsunami ModelingTsunami Modeling

1. The 1797 West Sumatran Tsunami2. The 1818 Bali Tsunami3. The 1820 Bima Tsunami4. The 1833 Bengkulu Tsunami5. The 1883 Krakatau Volc Tsunami6. The 1935 North Sumatera Tsunami7. The 1969 Mandar Tsunami 8. The 1992 Flores Tsunami

16 of 109 tsunamis have been simulated

9. The 1994 East Java Tsunami10. The 1996 Toli-Toli Tsunami11. The 1996 Biak Tsunami12. The 1998 PNG Tsunami13. The 2000 Banggai Tsunami14. The 2004 Aceh Tsunami15. The 2005 Nias Tsunami16. The 2006 Pangandaran Tsunami

Friday, 8 September 2006Friday, 8 September 2006 page page 28

The 2004 The 2004 AcehAceh TsunamiTsunami

Latief, Aditya, Haris, (2005)

Tsunami Height Distribution

Tsunami Inundation

Friday, 8 September 2006Friday, 8 September 2006 page page 29

Friday, 8 September 2006Friday, 8 September 2006 page page 30

Numerical Modeling Numerical Modeling (Pangandaran 17 July 2006)

Friday, 8 September 2006Friday, 8 September 2006 page page 31

EndEnd--toto--end Tsunami Simulation end Tsunami Simulation in in PadangPadang CityCity

on 26 December 2005on 26 December 2005

Friday, 8 September 2006Friday, 8 September 2006 page page 32

Tsunami Prone Area in the WorldTsunami Prone Area in the World

PADANG City

(Source : Geographica)

Friday, 8 September 2006Friday, 8 September 2006 page page 33

Community PreparednessCommunity Preparedness

Tsunami in Indonesia are local type• Generated very close to coastal communities• Insufficient time to accurately assess the risk• Less time to disseminate warnings and carry out orderly evacuation

Friday, 8 September 2006Friday, 8 September 2006 page page 34

Seismological Summary of Seismological Summary of SumateraSumatera

Several big earthquake have been recorded in the West Coast of Sumatra (e.g. 1833, 1935 and 2004) and initiated tsunami disaster. Based on paleo-tsunami research, the next big earthquake with tsunami is forecasted to occur at Padang

Padang

(Natawidjaya, 2002)

Friday, 8 September 2006Friday, 8 September 2006 page page 35

Friday, 8 September 2006Friday, 8 September 2006 page page 36

Area : 694.96 km2

Inhabitants : 901,488 people

Coast length : +/- 84 km

Number of surrounding rivers : 21

Geographical Position : 0°54’ - 1° 08’ S

Altitude : 0 – 10 m (60%)

Statistics of Statistics of PadangPadang CityCity

Friday, 8 September 2006Friday, 8 September 2006 page page 37

Public Education MaterialsPublic Education Materials

Friday, 8 September 2006Friday, 8 September 2006 page page 38

National Media CampaignNational Media Campaign

Friday, 8 September 2006Friday, 8 September 2006 page page 39

Local Media CampaignLocal Media Campaign

Friday, 8 September 2006Friday, 8 September 2006 page page 40

Distributed Materials and Previous ExerciseDistributed Materials and Previous Exercise

Earthquake and tsunami drill

Hazard Map Evacuation Routes Learning media

Friday, 8 September 2006Friday, 8 September 2006 page page 41

Increasing Awareness for Government OfficersIncreasing Awareness for Government Officers

Friday, 8 September 2006Friday, 8 September 2006 page page 42

Workshop for Developing Evacuation MapWorkshop for Developing Evacuation Map

Friday, 8 September 2006Friday, 8 September 2006 page page 43

TOT for Local Officers, Students, NGO and PublicTOT for Local Officers, Students, NGO and Public

Friday, 8 September 2006Friday, 8 September 2006 page page 44

TOT for Local Officers, Students, NGO and PublicTOT for Local Officers, Students, NGO and Public

Friday, 8 September 2006Friday, 8 September 2006 page page 45

Tsunami numerical simulation is under-development for Padangarea based on the 1833 earthquake. The model would be able to simulate tsunami run-upand predicts the available time for evacuation purposes

Please wait … take some time to run the program

Tsunami Model for Tsunami Model for PadangPadang CityCity

Friday, 8 September 2006Friday, 8 September 2006 page page 46

Elevation of Elevation of PadangPadang CityCity

: 0-5 mdpl

: 5 – 10 mdpl

: 10 – 25 mdpl

: 25 – 100 mdpl

: > 100 mdpl

Safe Area: > 5 meters above sea-level

: Danger Zone

: Alert Zone

: Safe Zone

: Relocation Zone

: Relocation Zone

Kogami 2005

Friday, 8 September 2006Friday, 8 September 2006 page page 47

Documentation LIPI

Evacuation Map and Sign BoardsEvacuation Map and Sign Boards

Friday, 8 September 2006Friday, 8 September 2006 page page 48

Evacuation Routes and Escape Building

Friday, 8 September 2006Friday, 8 September 2006 page page 49

PUSAT KOTAJL. RADEN SALEH

INDARUNG

LUBUK BEGALUNG

TELUK BAYUR

SIMPANG HARU

BY PASS

KAMPUS UNAND

Evacuation Routes and Escape Building

Friday, 8 September 2006Friday, 8 September 2006 page page 50

Evacuation Routes and Escape Building

ULAK KARANG

LAPAI

SITEBA

BY-PASS/BALAI BARU

TABING/AIR TAWAR

BY-PASS

TUNGGUL HITAM

RAWANG PANJANG

Friday, 8 September 2006Friday, 8 September 2006 page page 51

Evacuation Routes and Escape Building

BEBERAPA JALUR DAN TITIK EVAKUASISUMBER: Dinas Prasarana Jalan Propinsi Sumbar

SIMPANG KALUMPANG

LUBUK MINTURUN

BY PASS

BY PASS

BY PASS

LUBUK BUAYA

ANAK AIR

PARAK BURUAK

SIMPANG LALANG

SIMPANG TABING

SIMPANG DUKU

Friday, 8 September 2006Friday, 8 September 2006 page page 52

DTM of DTM of PadangPadang

Friday, 8 September 2006Friday, 8 September 2006 page page 53

People went to the designed evacuation place (PangilunMountain)

Activities at the Evacuation Place

Sending warning from National Center (BMG) to Major of Padang City (Authorized person) by Pushing Red Button

Commemoration of OneCommemoration of One--year Tsunami Disasteryear Tsunami Disaster

Friday, 8 September 2006Friday, 8 September 2006 page page 54

Indonesia, with the aids from several other countries, have established additional 11 seismometer stations (Nias, Yogyakarta, Banda Aceh, Jambi, Padang Panjang, Bengkulu, Bandung, Palu, Waingapu, Denpasar, Tangerang) as a part of INA-TWS. Utilizing the global network, INA-TWS has capacity to distribute earthquake information in less than 10 minutes after earthquake occurs. This has been demonstrated by an end-to-end simulation on December 2005 to commemorate one-year of the Aceh-tsunami

RealReal––time Earthquake Monitoringtime Earthquake Monitoring

Friday, 8 September 2006Friday, 8 September 2006 page page 55

System for sea level monitoring in Padang has been established and directly connected with BMG on real time basis for tsunami warning confirmation.

RealReal--time Seatime Sea--level Monitoringlevel Monitoring

Friday, 8 September 2006Friday, 8 September 2006 page page 56

Terjadi gempa kuat 26 Desember 2005; 09.16 WIB; 125 km baratdaya Kota Padang.

Potensi timbulkan tsunami, segera tinggalkan pantai Kota Padangdan sekitarnya. (BMG)

Message Content via SMS :

A strong earthquake has occurred on December 26, 2005; 09.16 WIB; 125 km South-West of Padang City

It potentially can trigger tsunami, please evacuate yourself immediately from coasts of Padang City and its surrounding

Tsunami WarningTsunami Warning

Friday, 8 September 2006Friday, 8 September 2006 page page 57

From National Center (BMG-Jakarta) to Major of Padang via SMS

From Major of Padang to Critical Posts by Siren, HT, Local Communication. The Critical Posts include:

• The Center of Operational Control

• Fire Brigade

• Police

• Indonesian Red Cross

• Mosques

• Churches

Dissemination of Warning InformationDissemination of Warning Information

Friday, 8 September 2006Friday, 8 September 2006 page page 58

SITUATION DURING TSUNAMI DRILL

Friday, 8 September 2006Friday, 8 September 2006 page page 59

Spatial Plan Principles for Padang City :

Friday, 8 September 2006Friday, 8 September 2006 page page 60

…… the way forwardthe way forward

Tsunami early warning systems cannot be handled by a single country. Strong cooperation is needed among all countries over the globe, especially those who have coastal areas threatened by tsunami.

Such cooperation can be classified into two main groups, i.e. : structure (relating to establishment of sensing devices) and culture (relating to building resilient communities)

The cooperation can be in the form of :

A. STRUCTURE

• Funding for sensing equipment and installation, including data sharing and information exchange

• Operation and maintenance of the systems for both financial and technological aspects

• Development of robust communication infrastructure

Friday, 8 September 2006Friday, 8 September 2006 page page 61

…… the way forwardthe way forward

B. CULTURE

• Capacity building in human resource development, joint research program and institutional development

• Empowering domestic resources in instrumentation industries and facilities

• Strengthening the regional network

• Enhancing the community preparedness together with public awareness towards community-based disaster management

• Development of redundancy in warning dissemination

• Development of formal education in disaster management

Friday, 8 September 2006Friday, 8 September 2006 page page 62