Report TAG baseline suggestions:

• Font size should be legible

• English units

• Most existing reports should be

started from scratch

• Any table on a page should be able

to be exported in excel

3

Updated reports?

• 23 Metrics

• Orphaned Elements

4

23 Metrics

• Includes Metrics 6, 7, 8, 9, 10, 11, 13, and

14

5

Orphaned Elements

6

Which reports to focus on?

• The TAG decided to discuss

inspection/SI&A first.

7

Which “existing” reports to focus on?

• Inspection

• Inspection SI&A

• Network Element Summary

• Bridge Condition Summary

8

9

• “One Stop”

Inspection reports

• Combines SI&A,

Element Report,

Inspection

Procedures

Report, and a

Channel Profile

Report

10

Which other reports to focus on?

11

Inspection Data Work Candidates

Default Utility Tree Utility Weight Profiles

Benefits

Actions Network Actions

Element Deterioration Rates NBI Deterioration

Rates NBI Conversion

Profiles

Network

Policies Lifecycle

Policies Funding Sources

Projects

Segments

Performance Measures

Funding Allocation

Programs

Scenario

Explorer

Optimization

Project Categories

NBIS requirements, Summary

Listing of Bridges & Condition

Strategy to

minimize life

cycle costs

Performance Target

Alternative Strategies

Lifecycle Planning

Deterioration

Models

Work Types

& Costs

Bridge

Objectives &

Measures

Identify &

Assess Risk

Evaluate &

Prioritize Risk

Performance

Target

Financial Plan – 10 year

costs and annual needs

Investment Strategies & 5 year Plan

12

Which other reports to focus on?

• Provide feedback/ideas on handout

• Interested not only in *which* reports, but what

content do you need?

• Add thoughts later and email Beckie

(curtisr4@michigan.gov)