ITU Workshop

Rome, 9th September 2011

Geoffroy de Dinechin – FT Marine

Reducingcostsoninstallationand maintenance

2

Group CONFIDENTIAL

12

Summary

Reducing costs on installation and maintenance

Reducing costs for mob/demob

3 Reducing costs for shore-ends

4Reduction from re-use

Conclusion

Reduction by engineering

567

Reducing costs for protection

3

Group CONFIDENTIAL

1/Reducing costson installationand maintenance

4

Group CONFIDENTIAL

The share of installation costs

5

Group CONFIDENTIAL

The marine maintenance costs

6

Group CONFIDENTIAL

2/Reducing costsfor mob/demob

7

Group CONFIDENTIAL

Expensive mobilization

8

Group CONFIDENTIAL

Expensive mobilization for cableships

9

Group CONFIDENTIAL

Take advantageof vessel’sposition

10

Group CONFIDENTIAL

3/Reducing costsfor shore-ends

11

Group CONFIDENTIAL

The share of shore-end costs

12

Group CONFIDENTIAL

Costs for shore-ends

Expensive shore-ends

Cheap shore-ends

13

Group CONFIDENTIAL

Expensive shore-ends : 2.0 M$

Cheap shore-ends : 0.1 M$

Costs for shore-ends

14

Group CONFIDENTIAL

4/Reducing costsfor protections

15

Group CONFIDENTIAL

Protection for what risks ?

Trawls

Anchors

16

Group CONFIDENTIAL

Costs for protection

Trenching by plow Finishing trenching by ROV

Insulation by Uraducts

Anti-abrasing by steel pipes

17

Group CONFIDENTIAL

Reduction from surface lay

18

Group CONFIDENTIAL

The water depth installation costs

Expensive

ReasonableCheap

100 k$/km

0.4 k$/km

19

Group CONFIDENTIAL

5/Reduction of costsfrom re-use

20

Group CONFIDENTIAL

Reduction from re-use

21

Group CONFIDENTIAL

« In service » cables

FT Marine property

22

Group CONFIDENTIAL

« Out of service » cables

FT Marine property

23

Group CONFIDENTIAL

Condition of recovered cable

10 years oldLWP cableduringrecovery

24

Group CONFIDENTIAL

Condition of recovered cable

10 years oldrepeaterduringrecovery

25

Group CONFIDENTIAL

Condition of recovered cable

10 years oldLWP cable

26

Group CONFIDENTIAL

Condition of recovered cable

10 years oldLW cable

27

Group CONFIDENTIAL

6/Reduction of costsby engineering

28

Group CONFIDENTIAL

Reducing cost by engineering

29

Group CONFIDENTIAL

Reduction cost by engineering

30

Group CONFIDENTIAL

7/Conclusion

31

Group CONFIDENTIAL

Conclusion

Engineering is the key element, for a cost effective project.

Re-use of cable, request highlevel of engineering