30 DEC 2015
To:
Managing Director
Eralab Sdn Bhd
Attention: Pn Noraini Shair
APEXS SYNERGY RESOURCESmember of apexsgroup
unit a12b-1, jalan selaman 1/1, dataran palma, 68000 ampang, selangor, malaysia, t: +603!2"8!""# , e: $eo%apexsmy , &: &&&apexsmy
QUOTATIONDear Sir,
SUBJECT: OFFICE RENOVATION, MOVERS AND SUPPLY/INSTALL STANDARDWORKBENCH FOR LAB USE :: Q1221-321 REV!"#
We are pleased to submit our price quotation, scope of work and commercial & businessterms as below:
• These pricing is worked based on the limited information we received from the client and might
be adjusted it incorporate whatever items or works need to be done to complete the nal labequipment / interior decoration or environment.
• All other variation order shall be charged accordingly, if any.
• All payments are in Ringgit Malaysia and must be made payable to our designated company
for this purpose. i.e. A!"# #$%!&'$ &!#()&*!#
• All payment+s made / received are not refundable due to any reason or whatsoever.
• This -uotation is valid for working days from the date stipulated herein.
PART A: SCHEDULE OF PRICE
SCOPE DESCRIPTION QUANTITI PRICE RM#
A1 Removal of existin partitions !
workbenc" and wall cabinet
#$%'D#$( electrical appliances
and cables dismantlin
1 lot at 1 location ),*++
A OPTIONAL MOVER :
All of t"e above items to a new
location
Dependin on
location
-ac" *./ 0 R/1++
A) Relocation of 23ce 4ile Racks,
tables and ot"ers from /iddle
23ce location to front location
1 ot ++
A5 Suppl6 2f Workbenc" 4or 7'8
S"ape 9 See Appendix A
Sketc"es;
• Default top Surface :: /ica
surface table
• Allo6 steel ! aluminum le
1 ot 1,<*
8/18/2019 Quotation Eralab
http://slidepdf.com/reader/full/quotation-eralab 2/4
• $ormal wooden cabinet wit"
small partitions for sample
"older
8/18/2019 Quotation Eralab
http://slidepdf.com/reader/full/quotation-eralab 3/4
A* #nstallation of t"e above 1 ot ,++
A= OPTIONAL:
Anti>corrosive ! Anti acid surface
)/ 4ilm 9 installation and suppl6
?er Sqft@: 'SD )<@++
A< Suppl6 & #nstall of extension of
workbenc" 9 ( 4loor
• Default top surface :: /ica
surface table
• Allo6 steel ! aluminum le
$ormal wooden cabinet wit"
small partitions for sample
"older
1 ot *,*++
A (lass door suppl6, replacement
and installation
1 ot +
A ) B ) (A$( -lectric plu socket 9
suppl6 and install
1 ot +
(RA$D C2CA )*,**
(oodwill 9 onetime discount = ,1);
FINAL OFFER PRICE RM 33,3$3!""
PART B: SCHEDULE OF PAYMENT / PAYMENT TERMS
SCOPE DESCRIPTION PERCENTUM VALUE RM#
E1 'pon ?urc"ase 2rder : prior to start
work
*+ 1=,==@*+
E 'pon %ompletion of #nstallation and
Deliver6 of EACH #tem in Sc"edule A
5* 1*,+=@*
E) 'pon Satisfaction and Approval of t"e
overall ?roFect and Gandin 2ver
meetin ! session Retention;
* 1,==,=*
We s"all mobiliHe onl6 after we receive FULL pa6ment of t"e Irst milestone %&'()& *+ (' A). 2"1* for all of t"e above or else, 6ou are NOT entitled for t"e (oodwill discount@
Reards,
f 0 #hah1ar 0 2dris, *!(
Ape3 #ymphony #dn 4hd
8/18/2019 Quotation Eralab
http://slidepdf.com/reader/full/quotation-eralab 4/4
APPENDI0 A :: S&+& 4 F() R&5.&6.78 P9)(& O7
C"e full drawins s"all be produce upon ?2@