quotation eralab

4
30 DEC 2015 T o: Managing Director Eralab Sdn Bhd Attention: Pn Noraini Shair  APEXS SYNERGY RESOURCES member of apexsgroup unit a12b-1, jalan selaman 1/1, dataran palma, 68000 ampang, selangor, malaysia, t: +603!2"8!""# , e: $eo%apexsmy , &:  &&& apexsmy QUOTATION Dear Sir, SUBJECT: OFFI CE RENOVA TION, MOVERS AND SUPPL Y/INSTALL STANDARD WORKBENCH FOR LAB USE :: Q1221-321 REV!"# We are pleased to submit our price quotation, scope of work and commercial & business terms as below:  These pricing is worked based on the limited information we received from the client and might be adjusted it incorporate whatever items or works need to be done to complete the nal lab equipment / interior decoration or environment.   All other variation order sha ll be charged accordingly , if any .   All payments are in Ringgit Malaysia and must be made payable to our designated company for this purpose. i.e. A!"# #$%!&'$ &!#()&*!#   All payment+s made / rec eived are not refundable due to any reaso n or whatsoever.  This -uotation is valid for working days from the date stipulated herein. PART A: SCHEDULE OF PRICE SCOPE DESCRIPTION QUANTITI PRICE RM# A1 Removal of existin parti ti ons ! workbenc" and wall cabinet #$% 'D#$( electrical appliances and cables dismantlin 1 lot at 1 location ),*++ A OPTIONAL MOVER : All of t"e above items to a new location Dependin on location -ac" *./ 0 R/1++ A) Relocation of 23ce 4ile Racks, tables and ot"ers from /iddle 23ce location to front location 1 ot ++ A5 Suppl6 2f Wor kbe nc" 4 or 7'8 S"ape 9 See Appendix A Sketc"es; Default top Surface :: /ica surface table Allo6 steel ! aluminum le 1 ot 1,<*

Upload: micheal-shah

Post on 07-Jul-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Quotation Eralab

8/18/2019 Quotation Eralab

http://slidepdf.com/reader/full/quotation-eralab 1/4

30 DEC 2015

To:

Managing Director 

Eralab Sdn Bhd

Attention: Pn Noraini Shair 

 APEXS SYNERGY RESOURCESmember of apexsgroup

unit a12b-1, jalan selaman 1/1, dataran palma, 68000 ampang, selangor, malaysia, t: +603!2"8!""# , e: $eo%apexsmy , &:  &&&apexsmy

QUOTATIONDear Sir,

SUBJECT: OFFICE RENOVATION, MOVERS AND SUPPLY/INSTALL STANDARDWORKBENCH FOR LAB USE :: Q1221-321 REV!"#

We are pleased to submit our price quotation, scope of work and commercial & businessterms as below:

•  These pricing is worked based on the limited information we received from the client and might 

be adjusted it incorporate whatever items or works need to be done to complete the nal labequipment / interior decoration or environment.

•   All other variation order shall be charged accordingly, if any.

•   All payments are in Ringgit Malaysia and must be made payable to our designated company 

for this purpose. i.e. A!"# #$%!&'$ &!#()&*!#

•   All payment+s made / received are not refundable due to any reason or whatsoever.

•  This -uotation is valid for working days from the date stipulated herein.

PART A: SCHEDULE OF PRICE

SCOPE DESCRIPTION QUANTITI PRICE RM#

A1 Removal of existin partitions !

workbenc" and wall cabinet

#$%'D#$( electrical appliances

and cables dismantlin

1 lot at 1 location ),*++

A OPTIONAL MOVER : 

All of t"e above items to a new

location

Dependin on

location

-ac" *./ 0 R/1++

A) Relocation of 23ce 4ile Racks,

tables and ot"ers from /iddle

23ce location to front location

1 ot ++

A5 Suppl6 2f Workbenc" 4or 7'8

S"ape 9 See Appendix A

Sketc"es;

• Default top Surface :: /ica

surface table

• Allo6 steel ! aluminum le

1 ot 1,<*

Page 2: Quotation Eralab

8/18/2019 Quotation Eralab

http://slidepdf.com/reader/full/quotation-eralab 2/4

• $ormal wooden cabinet wit"

small partitions for sample

"older

Page 3: Quotation Eralab

8/18/2019 Quotation Eralab

http://slidepdf.com/reader/full/quotation-eralab 3/4

A* #nstallation of t"e above 1 ot ,++

A= OPTIONAL:

Anti>corrosive ! Anti acid surface

)/ 4ilm 9 installation and suppl6

?er Sqft@: 'SD )<@++

A< Suppl6 & #nstall of extension of

workbenc" 9 ( 4loor

• Default top surface :: /ica

surface table

• Allo6 steel ! aluminum le

 

$ormal wooden cabinet wit"

small partitions for sample

"older

1 ot *,*++

A (lass door suppl6, replacement

and installation

1 ot +

A ) B ) (A$( -lectric plu socket 9

suppl6 and install

1 ot +

(RA$D C2CA )*,**

(oodwill 9 onetime discount = ,1);

FINAL OFFER PRICE RM 33,3$3!""

PART B: SCHEDULE OF PAYMENT / PAYMENT TERMS

SCOPE DESCRIPTION PERCENTUM VALUE RM#

E1 'pon ?urc"ase 2rder : prior to start

work

*+ 1=,==@*+

E 'pon %ompletion of #nstallation and

Deliver6 of EACH #tem in Sc"edule A

5* 1*,+=@*

E) 'pon Satisfaction and Approval of t"e

overall ?roFect and Gandin 2ver

meetin ! session Retention;

* 1,==,=*

We s"all mobiliHe onl6 after we receive FULL pa6ment of t"e Irst milestone %&'()& *+ (' A). 2"1* for all of t"e above or else, 6ou are NOT entitled for t"e (oodwill discount@

Reards,

f 0 #hah1ar 0 2dris, *!(

 Ape3 #ymphony #dn 4hd

Page 4: Quotation Eralab

8/18/2019 Quotation Eralab

http://slidepdf.com/reader/full/quotation-eralab 4/4

APPENDI0 A :: S&+& 4 F() R&5.&6.78 P9)(& O7

 C"e full drawins s"all be produce upon ?2@