quality homes & offsite solutions - alan clucas
Post on 15-Jan-2017
222 Views
Preview:
TRANSCRIPT
HCA MIDS Housing Design Seminar Quality homes & offsite solutions 16 July 2015
Agenda : The Laing O’Rourke Accommodation sector offering
• The Laing O’Rourke Group
• Our Unique Business Offer
• Our accommodation experience
• Laing O’Rourke’s residential proposition
• Engineering-led thinking
• Our emerging approach to offsite manufacture: modular housing
• Housing projects
THE LAING O’ROURKE GROUP
LAING O’ROURKE GROUP OUR UNIQUE BUSINESS OFFERING
(UBO)
Our Unique Business Offering (“UBO”)
UBO DfMA
EngExG
Digital Engineering
Vertical Integration
CONSTRUCTION INFRASTRUCTURE
Our Unique Business Offering
Digital Engineering represents the
Laing O’Rourke culture of
embracing change,
challenging conventional
methods and sharing
information without borders
Digital Engineering
Sequencing
Costing
Visualization
Design coordination
Logistics Planning
Constructability
Facilities management
Engineering Excellence Group
Laing O’Rourke’s innovative approach is an integral part of its entrepreneurial culture;
the EnExG was formed to drive this innovation
COLLABORATE
“Advancing our clients’
core business”
DELIVER
“Solving implementation
challenges”
INNOVATE
“Creating viable and
Sustainable solutions”
EDUCATE
“Enhancing engineering
leadership and capability”
Explore Manufacturing – LOR’s UK Manufacturing Businesses
OUR ACCOMMODATION
EXPERIENCE
Our accommodation experience
• Delivered over 12,500 units over the last decade
• Across a range of tenures
• Private for sale/ rent
• Affordable
• Student accommodation
• Key worker accommodation
• MOD
• Hotels
LAING O’ROURKE’S
RESIDENTIAL PROPOSITION
Excellence in delivery
Our emerging accommodation sector UBO – an end-to-end approach
16
Verification
and
sign-off
Laing O’Rourke From start to finish
Construction Delivery Manufacturing
Verification
and
sign-off
Verification
and
sign-off
Asset management
Customer
End Customer
OUR EMERGING APPROACH
TO OFFSITE MANUFACTURE
Our emerging approach to offsite manufacture; modular housing
Building better futures for our customers and your residents
18
Cost certainty
Innovative approach across
the value chain
Quality assured
construction for fully
accredited homes
Reduced maintenance
costs and greater
predictability for asset
management
Capacity to deliver 5–10,000
homes p.a bringing Design,
Digital Engineering,
Manufacture, Delivery and
Assembly closer together
Delivery & quality certainty Delivering quality homes
that people want to live in
Programme certainty &
reductions
Innovations and Emerging Offer
LOR’s Modular Emerging Proposition
• The new Modular Housing System is under development
• Committed to delivering a modular housing system for over 5 years and
have continually invested into product development to ensure the highest
quality
• The early inception of the product has been focused on the
residential market, but with opportunities for other sectors in the
future
• Modular off site housing solution designed to deliver apartment blocks at
20 stories through to single story one off houses.
• Steel framed solution to be manufactured in a new facility at EIP. The
modules will have all internal fittings and finishes installed, external
cladding, windows, doors and contain packaged furniture.
• Prototypes for apartments and a house were completed in
September & December 2014
• A new Advanced Manufacturing Facility is proposed at our Explore
Manufacturing site in Worksop
• Subject to above modular homes could be available to the market by
early 2017
Explore Living - Modular housing proposition
LOR’s Housing Proposition
New Modular
Housing Solution
(2017)
Our Products
DfMA
(delivering today)
Elephant Road
Prototypes
Corsham MOD Elephant Road
Innovations and Emerging Offer
LOR’s Modular Emerging Proposition
• The new Modular Housing System is under development
• Committed to delivering a modular housing system for over 5 years and
have continually invested into product development to ensure the highest
quality
• The early inception of the product has been focused on the
residential market, but with opportunities for other sectors in the
future
• Modular off site housing solution designed to deliver apartment blocks at
20 stories through to single story one off houses.
• Steel framed solution to be manufactured in a new facility at EIP. The
modules will have all internal fittings and finishes installed, external
cladding, windows, doors and contain packaged furniture.
• Prototypes for apartments and a house were completed in
September & December 2014
• A new Advanced Manufacturing Facility is proposed at our Explore
Manufacturing site in Worksop
• Subject to above modular homes could be available to the market by
early 2017
Explore Living - Modular housing proposition
Elephant Road
Prototypes
Corsham MOD
LOR Modular Apartments: E5+ Prototypes
HOUSING PROJECTS
Our accommodation experience
Where we are today – delivering our ambitions
River Light,
Wandsworth
Two Fifty One,
Southwark
One The Elephant,
Southwark One Hyde Park,
Knightsbridge
Imperial College Southside &
Eastside, Kensington
Whitechapel Central,
Tower Hamlets
Clarges, Mayfair
190 The Strand, Westminster
Brompton Road,
Knightsbridge
William Street Quarter,
Barking & Dagenham
Housing projects
• One Hyde Park: A benchmark not just for
London , but for the global residential market
• 80 luxury apartments
• At peak 2000 operatives on site
• 200 daily vehicle movements in a busy
confined central London location
• Solution: an offsite construction
consolidation centre to that reduced traffic
mileage by 66%
• Recycled 97% of waste
• Include construction of 70 affordable homes
within the City of Westminster
Housing projects
• William Street Quarter, Barking London: The UK’s very first
privately funded social housing scheme.
• 201 homes to CfSH Level 4
• 71% of project constructed offsite
Housing projects
• Riverlight, Vauxhall, London: A total of 811 homes (116
affordable)
• Initially appointed to construct the two – storey mixed use
basement , on completion we were awarded the superstructure
package for the six high rise blocks
• Includes luxury apartments, a hotel, restaurant and shops set in
landscaped gardens
• All six frames include offsite manufactured structural components
Housing projects
• One the Elephant, Elephant & Castle, London:
• Scheme to be completed in 2016
• 373 residential apartments
• 272 student residences
• 17000 sq ft supermarket
• Cimema
• 13 retail units and 3 restaurants
• Includes 870 bathroom pods
Housing projects
• Whitechapel Central, London
• Comprising 3 buildings , the development will vary from 4 to 24 storeys, a mix of
affordable and private rental sector homes
• Working closely with L&Q one of London and the South East’s leading housing
associations
• We will design , provide offsite manufactured components and construct 633
residential units, 1200 sq m of office, restaurant and cinema
• Construction will begin in Winter 2015
• Opening to coincide with opening of Whitechapel Crossrail in 2019
THANK-YOU
top related