New Ringgold Middle School

Project SlideshowFebruary 4, 2017

Aerial Photo Approaching from North

Provided by Hudson Group – Taken 2.4.2017

Aerial Photo from Northeast

Provided by Hudson Group – Taken 2.4.2017

Aerial Photo from East

Provided by Hudson Group – Taken 2.4.2017

Aerial Photo from West

Provided by Hudson Group – Taken 2.4.2017

Aerial Photo from Northwest

Provided by Hudson Group – Taken 2.4.2017

Masonry Installation – Kitchen - Area A

Brick Installation – Area A

Brick Installation – Area A

Storefront Framing between Kitchen & Cafeteria – Area A

Bulkhead Framing - Kitchen – Area A

Work Progress – 1st Floor - Area A

Stud Wall Framing - 2nd Floor – Area A

Stud Wall Framing - 2nd Floor – Area A

Stud Wall Framing - 2nd Floor – Area A

Stud Wall Framing - 2nd Floor – Area A

Brick Installation – 2nd Floor – Area A

Stair 4 Installation – Area A

Stair 4 Installation – Area A

Work Progress – 2nd Floor – Area A

Masonry Installation – 2nd Floor- Area B

Masonry Installation – 2nd Floor- Area B

Brick Installation – 2nd Floor- Area B

Work Progress – 2nd Floor - Area B

Masonry Installation – 2nd Floor – Area C

Grouting Masonry Walls – 2nd Floor – Area C

Work Progress – 2nd Floor - Area C

Masonry Installation - Area D

Steel Erection – Auditorium - Area D

Steel Erection – Auditorium - Area D

Provided by Hudson Group – Taken 2.4.2017

Work Progress – Area D

Steel Detailing – Cafeteria - Area A

Steel Detailing – Gym - Area D

Roof Decking – Area A

Bar Joist Installation – Area A

Roof Installation – Above Mech. Room – Area A

Roof Progress

Brick Installation – Fitness Center

Roof Decking – Fitness Center

Additional Storm Water Control Measures

Electrical Rough In – Metal Framing – Area A

Electrical Rough In – Masonry Walls – Area B

Pulling Wire – 1st Floor - Area B

Plumbing Rough In – Area A

Area Drain Installation - Courtyard

HVAC Piping Installation – Area A

HVAC Piping Installation – Area A

HVAC Piping Installation – Areas B & C

HVAC Piping Installation – Areas B & C

Sprinkler Piping Installation – Area A

• Finish Masonry Installation – Areas A• Continue Masonry Installation – 2nd Floor – Areas B & C• Continue Masonry Installation – Area D• Continue Brick Installation – Area B• Continue Plumbing & Electrical Wall Rough In• Roof Decking – Cafeteria – Area A, Gym – Area D & Fitness Center• Continue Steel Erection – Area D• Long Span Joist Installation – Auditorium – Area D• Roofing – Area A & Fitness Center• Continue Stud Wall Installation• Continue Door Frame Installation• Set Transformer & Installation of Permanent Power• HVAC Piping Installation – 1st Floor - Areas A, B, & C• Start HVAC Ductwork Installation• Sprinkler Piping Installation – Area A

Scheduled Work for Next Few Weeks