COMPANY PROFILE
E & A CONSTRUCTION(Always ahead differently)
-
8/7/2019 Profile.doc ea
2/26
COMPANY PROFILE
M/S. E&A CONSTRUCTION
(Established in 1993)
Address: 8/1 (3rd Floor), Block-A, Aurangazeb Road,Mohammadpur, Dhaka-1207.
-
8/7/2019 Profile.doc ea
3/26
Tel: 9128614,9110207. Fax: 8116363.E-mail: mohibul_eanda@yahoo.com, shabnam_eanda@yahoo.com
INDEX
Introduction.
Organogram.
Company Details at a glance.
Forecast of Financial aspects of the firm. Experience of the firm.
Major enlistment information.
Sister concern of this firm and other agent with foreign Co.
List of Technical and other personnel.
List of machineries of the firm.
List of ongoing project.
Work completed for last 05 years.
Photograph of different project executed by this firm.
E & A C o n s t r u c t i o n
E&
A
Con
str
uction
mailto:mohibul_eanda@yahoo.commailto:shabnam_eanda@yahoo.commailto:mohibul_eanda@yahoo.commailto:shabnam_eanda@yahoo.com -
8/7/2019 Profile.doc ea
4/26
INTRODUCTION
E&A Construction is a proprietorship and modern business concern having 19 yearsexperience. Our achieved experience is quite healthy, shinning and significant. We put our firststep with construction work (Civil & Electrical) assuring best quality all times. Beside our differentconstruction line and equipments supply business experience we tried to put our next step toelectrical transmission and construction work. After that we looked front and gathered theexperience in supply (Local & international shopping), trading and other business. Now we areorganized with smart, talented and dedicated set up in civil, electrical and construction technicapersonnel, couple of spontaneous marketing hands with required strength. Our motto is to serveour clients and principals up to their desired level.
At present we are representing two Chinese and one Indian companies as their exclusive partner.Our expanded business with foreign delegation is impressive and we are enjoying cordiacooperation.
Adhering to the principal of Quality, Service and Credit the firm will continue its job withreliable service of high quality and fulfillment of business commitment.
We hope our upgrading performance as well as rich business figures in every step.
E & A C o n s t r u c t i o nE & A C o n s t r u c t i o n
Profile of E & A Construction
(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
5/26
-
8/7/2019 Profile.doc ea
6/26
Company Details at a glance:Company Name : M/S. E&A Construction
Type : Proprietorship.
Name of Proprietor : Md. Sarwar Ezaz
Established : 1993.
Location : Trader.
Nature of business : Importer, Supplier, Bidder and Construction
Firm.
Name of enlisted organization : BPDB, DESA, REB, WAPDA, R&H, LGED, DGDP,
Education Engineering Dept., District Council (DC).
Value of work : 100 Million (DESA, BPDB, EPZ etc.)
(Completed for last 03 years)
Value of work in hand : 400 Million
Bankers Name : Eastern Bank Limited, Gulshan Branch, Dhaka.
Phone:
Trust Bank Limited, Gulshan Branch, Dhaka.
Phone: 8815594, 8828088.
Phone No. : 8116363, 9128614
Fax No. : 9110207
E-mail : mohibul_eanda@yahoo.com,
Shabnam_eanda@yahoo.com
Profile of E & A construction
(up dated up to June, 2006)
mailto:mohibul_eanda@yahoo.commailto:Shabnam_eanda@yahoo.commailto:mohibul_eanda@yahoo.commailto:Shabnam_eanda@yahoo.com -
8/7/2019 Profile.doc ea
7/26
FINANCIAL STATEMENT FOR LAST FIVEYEARS
SL.No.
Year 2001 2002 2003 2004 2005
1 Total assets 83,98,967/- 1,11,43,599/- 98,69,203/- 1,04,30,543/- 1,46,30,621/-
2 Current asset 72,28,470/- 96,91,455/- 71,85,814/- 79,29,253/- 1,17,80,694/-
3Currentliabilities
6,63,405/- 27,36,316/- 10,69,984/- 98,560/- 25,54,048/-
4Profit beforeTaxes
25,99,272/- 25,50,628/- 22,95,324/- 24,26,752/- 56,48,120/-
5Profit afterTaxes
19,92,454/- 19,81,721/- 17,98,993/- 19,17,564/- 43,33,590/-
FINANCIAL STATEMENT FOR LAST FIVEYEARS
(In Million US$)
SL.No.
Year 2001 2002 2003 2004 2005
1 Total assets 0.182 0.241
2 Current asset 0.157 0.210
3Currentliabilities
0.011 0.047
4Profit beforeTaxes
0.056 0.055
5Profit afterTaxes
0.043 0.043
Profile of E & A Construction
up dated up to June, 2006
-
8/7/2019 Profile.doc ea
8/26
List of ongoing projectsSl.No
Name of work Work Order No
Name ofOrga
n.
TotalValue
Dateof
Completion
01
Construction of1st and 2nd floorof existing onestoried factorybuilding at IEPZ,
Paksey, Pabna.
Work order no:BEPZA/CE/IEPZ/CC-69/112Date: 15.05.2006
BEPZA
2,05,04,326.37
Ongoing.
02
Extension of 3rd
floor (BuildingNo-5) of Existingfour storiedfoundation threestoried factorybuilding at DhakaEPZ Extension
Area.
Work order no:BEPZA/CE/DEPZ/CR/333/107Date: 14.05.2006
BEPZA
1,56,15,576.32
Ongoing.
03
Development ofDrain repair bothside of mainroad, footpath ofWest side of oldzone at DhakaEPZ.
Work order no:BEPZ/CE/DEPZ/CR/330/113Date: 15.05.2006
BEPZA
16,38,643.66
Ongoing
04
Laxmipur office
Building. 9-TownPowerDistributionProject Division-3
Work order No: 9-Town/ Feni-3/111Date: 28/03/04
PDB 15,75,596 Ongoing
05 Modernization ofExisting 20polytechnic
Work order:XEN/EED/CHAND,ZONE/1151/15
EED 1,60,59,872.89
Ongoing.
Profile of E & A Construction
(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
9/26
Institute andEstablishment ofNew 18Polytechnic
Institute.
06
Maintenance of33/11 KV substation, 11 KVswitchingstations (MSS)
Work order No:DESCO/CS/BidNotice No:08/2005/2006/675
DESA39,84,580.
90Ongoi
ng.
Total=5,95,78,599.24
Work completed for last 05 years
Work/Supply Executed By M/S. E &AConstruction For The Year 2001
Sl.No.
Name of WorkWork
Order No.
Nameof
Organ.
WorkValue
Date ofcomple
tion
1
Work order fortrehabilitation of flooddamaged line underBasundhara Baridhara33 Kv overhead feeder.
XEN/Div-6/BL-
30/4.02/2001/27Dt:15.01.01 .
DESA 50,15,942.03
15.01.2001
2Construction work of Ctype building in DhakaEPZ Residential Area.
BEPZA/CE-11/99/559Dt.12/10/2000
BEPZA 56,48,032.98
15.07.2001
Profile of E & A Construction
(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
10/26
Sl.No.
Name of WorkWork
Order No.
Nameof
Organ.
WorkValue
Date ofcomple
tion
3
Construction work of 2
Storied zone servicebuilding at IEPZ,Pakshey, Pabna.
BEPZA/CE-
11/19/593Dt.23.10.2000
BEPZA 1,99,84,499.01
09.11.2001
4
Construction ofBoundary wall andSewerage Drain atresidential area of DPHParibagh under civilworks div., DESA.
XEN/Civil/99/2.05/66.Date:22/08/99
DESA52,43,247.
6131/11/2
001
5.
Conversion work of residential building as
office building of commercial director sdept. I Khilgaon 33/11 KVSub-station under GreaterDhaka Electric SupplyProject.
Ex.En./DD-4/2001/2.05/39Date:14.03.2001
DESA24,29,371.04
23.06.01
6.
Construction of 2nd & 3rd
floor at Paribagh DPH 1000sq.ft. Residential areaunser Greater DhakaElectric supply Project.
Ex.En./DD-5/2001/2.01/27Date:31.01.2001
DESA34,45,915.46
07.08.2001
7.
Extension work of Jinjira
P.M. Pilot Girls HighSchool;.
Facilities Dept.
16,62,500.00
24.12.2001
8.
Repair, service andsupply of spare parts forair-condition system atground, 2nd & 3rd floor inDESA office
Ex.En./DD-5/2001/2.01/120Date:30.05.2001
DESA13,02,032.55
07.02.2002
Profile of E & A Construction
(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
11/26
Sl.No.
Name of WorkWork
Order No.
Nameof
Organ.
WorkValue
Date ofcomple
tion
9.Supply of 11KVLightning Arrester.
Tender
EnquiryNo:23/ER-3/LightingArresterDt:23.05.2001
DESA9,09,990.0
025/09/2
001
10.
Supply of Jointingmaterials andtermination kits.
TenderEnquiry No.30/O&M/Fuse &Access.
DESA17,69,576.
50
11.
Supply of LightingArrester.
TenderEnquiry no.245/2001/Rev./Lot-2Dt:21.05.2001
BPDB28,20,000.
0023/09/2
001
12.
Supply of 11 KV PinInsulator
TenserEnquiry No.Barins/Raj/13/2001-
2002Dt:12.11.2001
BarindraMultipleDevelo
p.Authority
11,34,000.00
12/02/2002
Total=5,13,65,107.18
-
8/7/2019 Profile.doc ea
12/26
Work/Supply Executed By M/S. E &AConstruction For The Year 2002
Sl.N
o.
Name of WorkWork Order
No.
Nameof
Orga
n.
WorkValue
Date ofcomplet
ion
1Supply of 11 kVLighting Arrester (1000Nos.)
23/ER-3/LightingArresterDt.11.09.2001
DESA9,09,990.0
009.01.2002
2Supply of 10.5 kVLighting Arrester (1500Nos.)
25/O&M/ DOF& LADt.16.10.2001
DESA14,39,625.
0013.02.2002
3
Construction work of1000 Sft completeresidential buildingwith 5-storiedfoundation at DPHParibagh area underDESA.
XEN.Civil/01/2.05/66Dated:02/08/01
DESA1,89,98,238.
0015.02.20
02
Profile of E & A Construction
(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
13/26
Sl.No.
Name of WorkWork Order
No.
Nameof
Organ.
WorkValue
Date ofcomplet
ion
4Supply of 11 kV PinInsulator with Pin.
BMDA/BDEP-50/2001 Dt.31.12.2001
B M DA
11,34,000.00
31.03.2002
5
Supply of Jointingmaterials and Fuse &Accessories ( For Lot-1)
30/O&M/Fuse&Accessories.Dated:10.02.2002
DESA17,69,576.
5010.06.20
02
6
Supply of 11 kV PinInsulator with Pin and11 kV Disc Insulator
with Fittings
35/ Phase-IV/InsulatorDt.
17.02.2002
DESA80,37,000.
0017.06.2002
7Supply of 11 kV DOF,11 kV Fuse and 9 kVSurge Arrester.
32/Phase-IV/DOFDt.17.02.2002
DESA35,68,200.
0017.06.2002
8
Supply of 11 kV PinInsulator with Pin &Disc Insulator withfittings
Pur-18T/66/2001Dt. 10.06.02
BPDB30,29,775.
0008.10.2002
Sl.No.
Name of WorkWork Order
No.
Nameof
Organ.
WorkValue
Date ofcomplet
ion
9.
Construction ofBoundary wall andSewerage Drain at
residential area of DPHParibagh under civilworks div., DESA.
XEN/Civil/99/2.05/66.Date:22/08/9
9
DESA52,43,247.
6131/11/20
01
Profile of E & A Construction
(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
14/26
Sl.No.
Name of WorkWork Order
No.
Nameof
Organ.
WorkValue
Date ofcomplet
ion
Total=4,41,29,652.
11
Work/Supply Executed By M/S. E &AConstruction For The Year 2003
Sl.No.
Name of WorkWork
Order No.
Nameof
Organ.
WorkValue
Date ofcomple
tion
1.Construction ofboundary wall at main
custom fencing.
BEPZA/CE-12/03/350.
Dt:22/02/03
BEPZA35,13,129.
93
20/06/2
003
2.33/11 KVA , 20/28 MVA& 10/14 MVA PowerTransformer Supply
Work No:PS-3 Pur-
2/20Date:20/11/2002
DESA2,70,00,000.00
20/03/03
3.
Construction work of3000 Sft 5-Storiedresidential building atKamlapur 33/11 kv Sub-
station area underDESA.
XEN/civil/01/2.03/493Dt:
22/10/2002
DESA
1,36,63,412.00
20.04.2003
4.
Electricity networkdevelopment work atChashara crossing toKillarpole crossing underS&D division,Narawangang , DESA
XEN/DD-4/03-04/2.05/16.Dated:07/02/04.
DESA56,45,457.18
17.05.2003
-
8/7/2019 Profile.doc ea
15/26
Sl.No.
Name of WorkWork
Order No.
Nameof
Organ.
WorkValue
Date ofcomple
tion
Total=
4,98,21,999.11
Work/Supply Executed By M/S. E &A
Construction For The Year 2004
Sl.No.
Name of WorkWork Order
No.
Name ofOrga
n.
WorkValue
Date ofcomplet
ion
01
Construction of 33/11 KVS/S Control room oflaxmipur with othersrelevent works under Fenigroup-3, 9-townelectricity/distribution/supply projectdivision-3, BPDB.
Work OrderNo.: 9 TownElec.Supp.Proj.BBPDB/2003Admin-23/ 1922.Dated:01/07/2003
BPDB 70,31,713.00
15/02/04
02
Construction of ElectricitySupply office building at
Laxmipur under 9-TownPow. Distr. Project, Division-3, BPDB, Feni.
Work OrderNo.: 9Town/Feni-
3/Work Order-7/2004/109.Dated:28/03/2004.
BPDB
38,03,085.00 04/09/04
03Construction work ofLaxmipur Women hostelbuilding at Laxmipur .
Work OrderNo.:XEN/EED/Chad/Zone/713,
EED60,55,711
.00
15/10/04
Profile of E & A Constructio
(up dated up to June, 2006
-
8/7/2019 Profile.doc ea
16/26
Dated :05/11/2003.
04
Renewal & Rehabilitation of11 KV/0.4 Kv line
distribution sub-station forsupplying of 11/0.4/0.235KV line at progoti road,baishmara road and Lastportion of Ramgoti road(Partial) of Dokkhintemohoni feeder laxmipurtown under 9-town Pow.Distri. Project BPDB, Feni.
Work OrderNo.: 9 Town/Feni-3/WorkOrder-7/2004/114Dated:28/03/2004
BPDB
15,55,773.00
05/08/04
05.
Renewal & Rehabilitation of11 KV/0.4 Kv line
distribution sub-station for11K/0.4/0.235 KV lineSupply at Dokkhin Bazar,Puraton Adalat area andMobarak colloni area oflaxmipur town under 9-town Pow. Distri. ProjectBPDB, Feni.
Work Order
No.: 9 Town/Feni-3/WorkOrder-7/2004/111Dated:28/03/2004
BPDB
15,75,596.00 01/09/04
Sl.N
o.
Name of WorkWork Order
No.
Name ofOrga
n.
Work ValueDate of
completion
06Supply of 33/11 KV 20/28MNA Power transformer.
PS-3/-2/15Date:
07/12/2004DESA
3,96,00,000.00
07/06/2005
07
Construction of securitywall, 9- Town Laxmipur33/11KV sub station switchyard & construction area.
9-Town/Feni-3/W.O
7/2004/420PDB
1,04,465.00
26/02/2005
Profile of E & A Construction
(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
17/26
08
Notification of electricitydistribution networkdevelopment from chasercrossing to killolpurcrossing under
Narayangang sales anddistribution area.
XEN/DD-4/03-04/2.01/25
Date:17/05/04
PDB3,98,462.0
023/06/20
05
Total=5,41,24,805.0
0
Work/Supply Executed By M/S. E &AConstruction For The Year 2005
Profile of E & A Constructio
(up dated up to June, 2006
-
8/7/2019 Profile.doc ea
18/26
Sl
.No.
Name of Work Work OrderNo.
Nam
e ofOrga
n.
WorkValue
Date
ofcompletion
01
Construction of 600 Sft2-units3-storied building atTongi under Tongi 80MW GTPS Project..
Work OrderNo.: Tongi 80MWGTPS/2004/363.Dated:
02/06/2004.
BPDB 54,80,521.80
04/02/04.
02
Construction of
Acadimic Building(Part-2) at Laksmipur
Polytechnic Institute.
Work Order No:X-EN/EED/CHAND/ZONE/1151/15Dated:28/12/04
EED 1,60,59,87
2.89
28/12/0
5
03
Construction ofBoundary wall verticalextension at 9- Town,Laxmipur Division-3,Feni.
9-Town/Feni-3/W.O-7/05/87Date:16/04/2005
PDB1,96,370.00
14/05/2005
04
Repair of Boundarywall in 9-Town ,
Laxmipur Division-3,Feni.
9 Town/ Feni-3/W.O-7/05/88
16/04/2005PDB
1,99,320.0
0
14/05/200
5
05
Construction of Mainsecurity gate & watersupply at officebuilding and substation in 9-TownLaxmipur, Feni.
9-Town/Feni-3/W.O-7/05/95Date:23/04/2005
PDB1,92,112.50
20/05/2005
06
Construction of Guardwall at residential area& office area in 9-Town
Laxmipur, Division-3,Feni.
9-Town/Feni-3/W.O-7/05/106Date:27/04/2005
PDB1,99,705.0
0
25/05/2005
-
8/7/2019 Profile.doc ea
19/26
07
Construction ofresidential Building in 9Town, Laxmipur,Division-3, sels &Division-3 Feni
Sales & Distributiondivision.
9-Town/Feni-3/W.O-7/05/316Dt: 18/10/2005
PDB24,00,000.00
27/06/2006
Total=2,47,27,902.19
List of enlistment in various organizations
Sl.No.
Name of Dept. Status of Enlistment Validity
01 Dhaka Electric Supply Authority (DESA) A Class July 2007
02 Power Development Board (BPDB) A Class July 200703 Roads & Highway Department (R&H) G/2 Category July 2007
04 Water Development Board (WDB) G/2 Category July 2007
05 Local Government Eng. Dept. (LGED) Special Class July 2007
06 Facilities Dept. A Class July 2007
07 District Council (DC) A Class July 2007
08 Directorate General Defense Purchase (DGDP) July 200709 Electrical A, B, C July 2007
OrganogramProprietor
General Manager (Admin) Manager (Finance) General Manager (Technical)
Manager (HRD) Chief Accountant Asstt.Engineer
(Electrical)
Asstt. Engineer(Civil)
CommunicationExecutive
OfficeExecutive
Accounts Officer Sub-Asstt.Engineer
(Electrical)
Sub-Asstt.Engineer
(Civil)
Profile of E & A Constructio
(up dated up to June, 2006
-
8/7/2019 Profile.doc ea
20/26
ComputerOperator
OfficeAssistant
Cashier SiteExecutive(Electrical)
Site Executive(Civil)
Technical Personnel of the firm
Position Name Qualifications Years ofExperien
ce(General)
Years ofExperien
ce(In
proposed
position)Project Manager Md. Abdul Barek B.Sc. Engg.
(Civil.)14 10
Project Manager Tapan KumarSarker
B.Sc. Engg.(Civil.)
06 04
Project Engineer MohammedEmdadul karim
Diploma Engg.(Civil)
08 05
Asst. Engineer(Civil)
Md. Liton Azad Diploma Engg.(Civil)
06 05
Asst. Engineer(Elec.)
Md. Maruf Hossain B.Sc. Engg.(Elec.)
01 01
Astt. Engineer Md. Nuruzzaman Diploma Engr(Elec)
14 10
Sub-Asst. Engineer(Civil)
Md. MasudurRahman
Diploma Engg.(Civil)
04 03
Sub-Asst. Engineer(Civil)
Abdul Based Miah Diploma Engg.(Civil)
10 05
PlumberSaydur RahmanKhan
Class-Vlll 06 05
Md. MahfujulHaque
Class- lX 09 05
Md. IftekharulAhmed
Class-Vlll 10 08
Profile of E & A Construction
(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
21/26
List of Office equipment and logisticsof E&A Construction
Sl.No.
Description Model/NameQuantit
yRemarks
01
Office
S
p
a
ce
Location of 8/1 (3rd Floor), AurangazebRoad, Mohammadpur, Dhaka-1207.
3000 sft. In Order
02Computerwith printer
Intel Pentium I & III, Laptop (ACER)Pentium III with HP Deskjet 610 c
4 Nos.
03 Printer Printer-Canon Laser LBP 1120, HPDeskjet 610C, Canon BJC 265 SP,Canon S200SPX
4 Nos.
Profile of E & A Construction
(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
22/26
04 Scanner UMAX Astra 2100s,Canon N640P
2 Nos.
05Photo Copier
MachineToshiba-1370
1 Nos.
06Internet
Connection
BOL (2 Nos.), VHSNET (1 No),
ProshikaNet (1 No)
4 Nos.
07 Fax Machine Olympia OX 500 1 Nos.
08 Air Cooler American Air, General, Singer 4 Nos.
09Office
FurnitureChair Table, Conference chair/tablesets, computer table and others
40 Nos.
10 Genertors YongDong, 2 KVA 2 Nos.
11 Telephone
a) 8116363b) 9128614c) 9110207d) 9711381
4 Nos.
12 Motor Car
a) Toyota (Jeep) 1500 cc (1999)
Dhaka-Metro-Ga-15-6790b) Toyota (Platz) 1300 cc (Car)Dhaka-Metro-Ga-15-1259
c) Toyota (Micro bus) 2430 cc (1997)Dhaka-Metro-Ga-11-3858
3 Nos.
13 Pick UpToyota (1.5 Ton) 1995Dhaka-Metro-Ma-1049
1 Nos.
14 Motor CycleHonda-125 ccLML-150 ccDELIM-100 cc
3 Nos.
Sister Concern of E&A Construction
1. SEMP Trading Co.8/1 (3rd Floor), Aurangazeb Road,Mohammadpur,Dhaka-1207.
2. Consortium of Razon Associates and E&A Construction
82 (2nd Floor), Outer Circular Road,Moghbazar,Dhaka-1217.
3. Priti International47-A, Balaram Bose Lane(1st Floor),Kolkata,
Profile of E & A Construction
(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
23/26
India.
4. SUMEC.
5. LONGGUANG.
6. Other (Battery and Companies).
Legal Documents
Tread License.
Vat Certificate.
TIN.
IRC/ERC.
ABC License.
Other Certificate.
Profile of E & A Construction(up dated up to June, 2006)
-
8/7/2019 Profile.doc ea
24/26
Financial Document
Bankers Name:
Eastern Bank:
Phone No:
Trust Bank:Phone No:
Bank Solvency : Attached
Bank Statement: Attached
Liquid Assets : Attached
Auditors Report: Attached
Bank Guarantee: Attached
Profile of E & A Construction