GENERAL GUIDELINES

GENERAL GUIDELINES

1. Fill out the Submission Booklet

2. Collate the evidence required as per regulation.

3. Suggested formats / documentation as highlighted in this document

4. Put together the submission package in a structured manner as illustrated

Supporting Documents

A

Green Building

1. Fee Receipt

2. Submission Booklet

3. Others

B

C

D

E

F

G

H

A1

A2 B1

B14

H1

H4

STRUCTURING THE GREEN BUILDING SUBMISSION PACKAGE

Integrated Design Approach for achieving energy savingsA1

Minutes of Meeting Copy

Minutes of Meeting – Date stamped Photo

Post Contract Green BriefingA2

Format ….Undertaking letter

Compliance with Thermal Insulation system & Best Practices Energy ConservationB1

Extract from Specifications

Compliance with Thermal Insulation system & Best Practices Energy ConservationB1

Building details

Compliance with Thermal Insulation system & Best Practices Energy ConservationB1

Building details

Compliance with Thermal Insulation system & Best Practices Energy ConservationB1

EXTERNAL WALL SEC NO 1

LAYER THK.DESCRIPTIONS

DENSITY R Mass

NO in Ib/ft3 oF ft2.h/Btu Ib/ft2

1.00 1.000 Out side surface resistance 0.000 0.250 0.000

442.02 3.4002 IN RHP (Roof APPLY.) Rigid Polyurethane Insulation Panel with Steel & Alu.facing Sandwich Panel (RH-4''Box Rib) Registered

20072.188 21.334 0.620

26.00 0.500 Plaster (Cement / Sand) 116.250 0.100 4.844

2.00 1.000 Inside vertical surface resistance 0.000 0.680 0.000

1.000 0.000 0.000 0.000 0.000

0.00 1.000 0.000 0.000 0.000 0.000

0.00 1.000 0.000 0.000 0.000 0.000

0.00 1.000 0.000 0.000 0.000 0.000

0.00 1.000 0.000 0.000 0.000 0.000

0.00 1.000 0.000 0.000 0.000 0.000

0.00 1.000 #N/A #N/A 0.000 0.000

Sec.Thk 3.900 REV. 2 2007 15 2 2007

AS PER DM REGU. Outside color U (Btu / OF ft2 h) R Mass

0.100 D 0.045 22.364 5.464

ROOF NO 4

LAYER THK.DESCRIPTIONS

DENSITY R Mass

NO in Ib/ft3 oF ft2.h/Btu Ib/ft2

1.00 1.000 1 IN Outside surface resistance 0.000 0.250 0.000

6.00 2.000 Terrazzo Tiles 160.000 0.160 26.667

12.00 0.500 .5 IN Plaster (Cement / Sand) 116.250 0.100 4.844

68.01 3.100 Rigid Polyfoam-50 ((Rcc Roof Slabs ) - Registered 2007 - Certified DCL 3.125 19.452 0.807

9.02 4.000 Light Weight Concrete (Light Weight Aggregate) 100.000 0.687 33.333

9.00 8.000 Reinforced Concrete 150.000 0.624 100.000

12.00 0.500 .5 IN Plaster (Cement / Sand) 116.250 0.100 4.844

3.00 1.000 1 IN Inside horizontal surface resistance 0.000 0.920 0.000

0.00 1.000 #N/A #N/A 0.000 0.000

0.00 1.000 #N/A #N/A 0.000 0.000

0.00 1.000 #N/A #N/A 0.000 0.000

Sec.Thk 18.100 REV. (1) 25 9 2007

AS PER DM REGU. Outside color U (Btu / OF ft2 h) R Mass

0.078 D 0.045 22.294 170.495

Envelope U (thermal) Calculations and Sections

Compliance with Thermal Insulation system & Best Practices Energy ConsnB1

Envelope Sections - Wall

Envelope Sections - Roof

Glazing Details / Sections

HAP Input summary sheet

HAP Input summary sheet

HAP Input summary sheet

Limiting / Reversing Thermal BridgesB2

Compliance Strategies

Thermal Bridging Concept Report

All the Non-Repeating Thermal Bridges (i.e. junctions of floor and roof with the external wall, and details around

window and door openings) shall be reduced by designing all insulating building components to work in unison and

by creating barrier to heat flow in building envelope. The insulation shall be reviewed in relation to its location within

wall and roofs, its interface/connectivity with surrounding or penetration materials and connectivity within & between

insulating

components.

Following are the general strategies to be adopted at a minimum in order to achieve minimize thermal bridges:

- All the gaps between ceiling and walls shall be sealed with either plaster, adhesive or flexible sealant.

- All the gaps between walls and floor shall be sealed with either plaster, adhesive or flexible sealant.

- All the penetrations through air barrier shall be sealed by using a flexible sealant.

- All the penetrations around windows & door openings shall be sealed by using a flexible sealant.

- Partially filled insulation shall be secured firmly against inner leaf of wall.

- Provide full depth insulation between and over joists extending to inner edge of wall.

- Cavities shall be kept clean of mortar snots and other debris during construction.

- Provide a continuous air barrier of masonry inner leaf with wet-finish plaster alongside of internal wall, floor and

ceilings. Apply flexible sealant to all interfaces between internal air barriers and window/door frames.

Drawings for acceptable construction details shall be prepared by the contractor and approval has to be taken from

the consultant prior to proceed for the construction in relevance to the above

requirements.

Thermal Bridging Strategy

Envelope Tightness (Prescriptive Based)B3

Letter of Undertaking

Method Statement – From Qualified Thermographer

Extract from Specification

Envelope Tightness (Performance Based)B4

Letter of Undertaking

Method Statement – From Qualified Thermographer

Extract from Specification

THIS IS A VOLUNTARY CREDIT ……

Efficient sizing of HVAC systemB5

Heat Load Calculations

Heat load estimate should provide proof of the ENVELOPE U values being used in the project.

Input sheet of the software can be submitted

Efficient sizing of HVAC systemB5

Efficient sizing of HVAC systemB5

Schedule of Equipment

Central Air-conditioning Units with Energy Recovery Units (ERV)B6

Ventilation / Exhaust Air Calculations

Air Balancing Calculations / Table

Central Air-conditioning Units with Energy Recovery Units (ERV)B6

Energy Recovery Table with Efficiency details

HVAC Drawings indicating the units

Selection of Air-conditioning Units with HIGH Energy Efficiency Ratio (EER)B7

Heat Load Summary with EER of the units for various areas 1 of 2

Selection of Air-conditioning Units with HIGH Energy Efficiency Ratio (EER)B7

Heat Load Summary with EER of the units for various areas 2 of 2

Selection of Air-conditioning Units with HIGH Energy Efficiency Ratio (EER)B7

Energy Efficient Auxiliary Systems of HVAC – Blowers and Pumps B8

NOT APPLICABLE ……

Interior Lighting LevelsB9

Lighting Drawing along with Notes / Legend

LPD Calculation and Reduction Chart

Interior Lighting LevelsB9

LPD Calculation and Reduction Chart

Exterior Lighting LevelsB10

Lighting Drawing along with Notes / Legend

LPD Calculation and Reduction Chart

Exterior Lighting LevelsB10

LPD Calculation and Reduction Chart

LPD Calculation and Reduction Chart

Notes in Electrical Drawing

LPD Calculation and Reduction Chart

Use of Renewable Sources of Energy for domestic heatingB11

Extract from Specification

Use of Renewable Sources of Energy for domestic heatingB11

Hot Water Calculation

Use of Renewable Sources of Energy for domestic heatingB11

Hot Water Calculation / Notes in the drawing

Use of Renewable Sources of Energy for domestic heatingB11

Roof Top Water Supply Layout with Solar System Notes / Legend in the Drawing

Use of Renewable Sources of Energy for domestic heatingB11

Roof Top Water Supply Layout with Solar System Notes / Legend in the Drawing

Use of Renewable Sources of Energy for PowerB12

Solar PV system layout

Notes in the Electrical Drawing

THIS IS A VOLUNTARY CREDIT ……

Energy MeteringB13

Single Line Diagram

Energy MeteringB13

Metering Schedule

Extract of Specification

COMMISSIONINGB14

Commissioning Specifications (Extract)

COMMISSIONINGB14

Commissioning Specifications (Extract)

COMMISSIONINGB14

Commissioning Specifications (Extract)

COMMISSIONINGB14

Details of Training proposed

BUILDING ENERGY SIMULATION REPORT [Conditioned areas > 2000 m2]B15

A copy of the Energy Modeling Report

A copy of the Simulation output from software

General

1. GB consultant to follow same requirements as LEED based regulation.

2. GB should be from Trakhees re qualified list.

INDEPENDENT COMMISSIONING AGENT [Conditioned area >2000 m2]B16

General

1. Commissioning Specialist should follow same requirements as LEED based regulation.

2. Commissioning specialist should be from Trakhees re qualified list.

C. LIGHTING

Use of Solar Day lighting technologiesC1

Sky lightingTHIS IS A VOLUNTARY CREDIT ……

Relevant Extract / Section of Specification

Design Drawings showing Skyllights along with Clear LEGEND

Use of Energy Saving High Performance LampsC2

Villa Lighting Layout Drawings

Relevant Extract / Section of Specification

Use of Energy Saving High Performance Lamps [OFFICE Portion]C2

Notes / Legend in the Electrical Drawing

Use of Electronic BallastC3

Relevant Extract / Section of Specification

Electrical Drawing

Use of Electronic BallastC3

Notes / Legend in the Electrical Drawing

Use of Programmable thermostat for HVAC systemD1

Relevant Extract / Section of Specification

Use of Programmable thermostat for HVAC systemD1

Drawing indicating Thermostat locationProgrammable Thermostat with Timer controls at a basic level

T

Use of Programmable thermostat for HVAC systemD1

Notes / Legend in the Electrical Drawing

Programmable Thermostat with Timer controls at a basic level

T

Control of External LightsD2

Relevant Extract / Section of Specification

Electrical Drawing Notes / Legend in the Electrical Drawing

Control of External LightsD2

Interlock of Toilet / Bathroom FansD3

Relevant Extract / Section of Specification

Interlock of Toilet / Bathroom FansD3

Electrical Drawing / Thermostat location Notes / Legend in the Electrical Drawing

Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4

Relevant Extract / Section of Specification

Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4

Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4

Extract from Specification – Motion Sensor

Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4

Electrical Drawing / Motion Sensor location

Notes / Legend in the Electrical Drawing

PART - 7

E. WATER

Usage of STP for treating Grey Water & Reuse of treated water E1

Relevant Extract / Section of Specification

THIS IS A VOLUNTARY CREDIT ……

Drawings indicating the proposed STP

July 2016Revision 00 Page 73 of 102

Performance Requirements of Sanitary Fittings E2

Relevant Extract / Section of Specification Comprising the flow rates

Performance Requirements of Sanitary Fittings E2

Notes from the Water Supply Layout Drawing

Water Efficient landscaping & Irrigation Systems E3

Relevant Extract / Section of Specification

Water Efficient landscaping & Irrigation Systems E3

Landscape layout / Setting out drawing

Water Efficient landscaping & Irrigation Systems E3

Relevant Notes in the Drawing

Water Efficient landscaping & Irrigation - Eliminate Potable Water E4

Relevant Extract / Section of Specification

Landscape layout / Setting out drawing

THIS IS A VOLUNTARY CREDIT ……

Water Efficient landscaping & Irrigation - Eliminate Potable Water E4

Drawings indicating the proposed STP

Landscape layout / Setting out drawing

THIS IS A VOLUNTARY CREDIT ……

PART - 8

F. ENVIRONMENT & INDOOR AIR QUALITY

Building Ventilation and Minimum Indoor Air Quality (IAQ)F1

Relevant Extract / Section of Specification

Building Ventilation and Minimum Indoor Air Quality (IAQ)F1

Fresh Air Calculations (sample)

Building Ventilation and Minimum Indoor Air Quality (IAQ)F1

Fresh Air Calculations (sample)

Building Ventilation and Minimum Indoor Air Quality (IAQ)F1

Drawing / Layout showing FAHU

Building Ventilation and Minimum Indoor Air Quality (IAQ)F1

Fresh Air Schematic

Control of Environmental Tobacco SmokeF2

NOT APPLICABLE ……

July 2016Revision 00 Page 87 of 102

Low Emitting Paints, Coatings, Adhesives and SealantsF3

Relevant Extract / Section of Specification mentioning the requirements

Drawing indicating the requirements under GENERAL NOTES / GENERL REQUIREMENTS

Use of Ozone Friendly materials in AC Eqpts,Thermal Insulation, Foam & FF EqptsF4

Relevant Extract / Section of Specification mentioning the requirements

Relevant Notes in the Drawing

PART -9

G. SUSTAINABLE SITE AND MANAGEMENT

Construction Activity Pollution Prevention (CAPP) / (ESC)G1

Draft template of Erosion & Sedimentation Control Plan

Construction Activity Pollution Prevention (CAPP) / (ESC)G1

Relevant Extract / Section of Specification mentioning the requirements

Heat Island Effect – Non RoofG2

Relevant Extract / Section of Specification mentioning the SRI requirements

Heat Island Effect – Non RoofG2

Drawings Highlighting the requirement

Relevant Notes in the Drawing

Heat Island Effect –RoofG3

Relevant Extract / Section of Specification mentioning the SRI requirements

Roof PlanRelevant Notes in the Drawing

PART - 10

H. OPERATIONAL SUSTAINABILIY

Recycling Facility – Storage & Collection of RecyclablesH1

Relevant Extract / Section of Specification mentioning the SRI requirements

Drawing indicating the location of Bins

Energy Efficient Equipments (White Goods)H2

Relevant Extract / Section of Specification

Energy Efficient Equipments (White Goods)H2

Letter of Undertaking by the client (where relevant)

Building User GuideH3

Extract of specification mentioning this requirement

Draft structure / format of the proposed building user guide

Building User GuideH3

Draft structure / format of the proposed building user guide

Facility / Building Services TuningH4

NOT APPLICABLE ……