GENERAL GUIDELINES
GENERAL GUIDELINES
1. Fill out the Submission Booklet
2. Collate the evidence required as per regulation.
3. Suggested formats / documentation as highlighted in this document
4. Put together the submission package in a structured manner as illustrated
Supporting Documents
A
Green Building
1. Fee Receipt
2. Submission Booklet
3. Others
B
C
D
E
F
G
H
A1
A2 B1
B14
H1
H4
STRUCTURING THE GREEN BUILDING SUBMISSION PACKAGE
Integrated Design Approach for achieving energy savingsA1
Minutes of Meeting Copy
Minutes of Meeting – Date stamped Photo
Post Contract Green BriefingA2
Format ….Undertaking letter
Compliance with Thermal Insulation system & Best Practices Energy ConservationB1
Extract from Specifications
Compliance with Thermal Insulation system & Best Practices Energy ConservationB1
Building details
Compliance with Thermal Insulation system & Best Practices Energy ConservationB1
Building details
Compliance with Thermal Insulation system & Best Practices Energy ConservationB1
EXTERNAL WALL SEC NO 1
LAYER THK.DESCRIPTIONS
DENSITY R Mass
NO in Ib/ft3 oF ft2.h/Btu Ib/ft2
1.00 1.000 Out side surface resistance 0.000 0.250 0.000
442.02 3.4002 IN RHP (Roof APPLY.) Rigid Polyurethane Insulation Panel with Steel & Alu.facing Sandwich Panel (RH-4''Box Rib) Registered
20072.188 21.334 0.620
26.00 0.500 Plaster (Cement / Sand) 116.250 0.100 4.844
2.00 1.000 Inside vertical surface resistance 0.000 0.680 0.000
1.000 0.000 0.000 0.000 0.000
0.00 1.000 0.000 0.000 0.000 0.000
0.00 1.000 0.000 0.000 0.000 0.000
0.00 1.000 0.000 0.000 0.000 0.000
0.00 1.000 0.000 0.000 0.000 0.000
0.00 1.000 0.000 0.000 0.000 0.000
0.00 1.000 #N/A #N/A 0.000 0.000
Sec.Thk 3.900 REV. 2 2007 15 2 2007
AS PER DM REGU. Outside color U (Btu / OF ft2 h) R Mass
0.100 D 0.045 22.364 5.464
ROOF NO 4
LAYER THK.DESCRIPTIONS
DENSITY R Mass
NO in Ib/ft3 oF ft2.h/Btu Ib/ft2
1.00 1.000 1 IN Outside surface resistance 0.000 0.250 0.000
6.00 2.000 Terrazzo Tiles 160.000 0.160 26.667
12.00 0.500 .5 IN Plaster (Cement / Sand) 116.250 0.100 4.844
68.01 3.100 Rigid Polyfoam-50 ((Rcc Roof Slabs ) - Registered 2007 - Certified DCL 3.125 19.452 0.807
9.02 4.000 Light Weight Concrete (Light Weight Aggregate) 100.000 0.687 33.333
9.00 8.000 Reinforced Concrete 150.000 0.624 100.000
12.00 0.500 .5 IN Plaster (Cement / Sand) 116.250 0.100 4.844
3.00 1.000 1 IN Inside horizontal surface resistance 0.000 0.920 0.000
0.00 1.000 #N/A #N/A 0.000 0.000
0.00 1.000 #N/A #N/A 0.000 0.000
0.00 1.000 #N/A #N/A 0.000 0.000
Sec.Thk 18.100 REV. (1) 25 9 2007
AS PER DM REGU. Outside color U (Btu / OF ft2 h) R Mass
0.078 D 0.045 22.294 170.495
Envelope U (thermal) Calculations and Sections
Compliance with Thermal Insulation system & Best Practices Energy ConsnB1
Envelope Sections - Wall
Envelope Sections - Roof
Glazing Details / Sections
HAP Input summary sheet
HAP Input summary sheet
HAP Input summary sheet
Limiting / Reversing Thermal BridgesB2
Compliance Strategies
Thermal Bridging Concept Report
All the Non-Repeating Thermal Bridges (i.e. junctions of floor and roof with the external wall, and details around
window and door openings) shall be reduced by designing all insulating building components to work in unison and
by creating barrier to heat flow in building envelope. The insulation shall be reviewed in relation to its location within
wall and roofs, its interface/connectivity with surrounding or penetration materials and connectivity within & between
insulating
components.
Following are the general strategies to be adopted at a minimum in order to achieve minimize thermal bridges:
- All the gaps between ceiling and walls shall be sealed with either plaster, adhesive or flexible sealant.
- All the gaps between walls and floor shall be sealed with either plaster, adhesive or flexible sealant.
- All the penetrations through air barrier shall be sealed by using a flexible sealant.
- All the penetrations around windows & door openings shall be sealed by using a flexible sealant.
- Partially filled insulation shall be secured firmly against inner leaf of wall.
- Provide full depth insulation between and over joists extending to inner edge of wall.
- Cavities shall be kept clean of mortar snots and other debris during construction.
- Provide a continuous air barrier of masonry inner leaf with wet-finish plaster alongside of internal wall, floor and
ceilings. Apply flexible sealant to all interfaces between internal air barriers and window/door frames.
Drawings for acceptable construction details shall be prepared by the contractor and approval has to be taken from
the consultant prior to proceed for the construction in relevance to the above
requirements.
Thermal Bridging Strategy
Envelope Tightness (Prescriptive Based)B3
Letter of Undertaking
Method Statement – From Qualified Thermographer
Extract from Specification
Envelope Tightness (Performance Based)B4
Letter of Undertaking
Method Statement – From Qualified Thermographer
Extract from Specification
THIS IS A VOLUNTARY CREDIT ……
Efficient sizing of HVAC systemB5
Heat Load Calculations
Heat load estimate should provide proof of the ENVELOPE U values being used in the project.
Input sheet of the software can be submitted
Efficient sizing of HVAC systemB5
Efficient sizing of HVAC systemB5
Schedule of Equipment
Central Air-conditioning Units with Energy Recovery Units (ERV)B6
Ventilation / Exhaust Air Calculations
Air Balancing Calculations / Table
Central Air-conditioning Units with Energy Recovery Units (ERV)B6
Energy Recovery Table with Efficiency details
HVAC Drawings indicating the units
Selection of Air-conditioning Units with HIGH Energy Efficiency Ratio (EER)B7
Heat Load Summary with EER of the units for various areas 1 of 2
Selection of Air-conditioning Units with HIGH Energy Efficiency Ratio (EER)B7
Heat Load Summary with EER of the units for various areas 2 of 2
Selection of Air-conditioning Units with HIGH Energy Efficiency Ratio (EER)B7
Energy Efficient Auxiliary Systems of HVAC – Blowers and Pumps B8
NOT APPLICABLE ……
Interior Lighting LevelsB9
Lighting Drawing along with Notes / Legend
LPD Calculation and Reduction Chart
Interior Lighting LevelsB9
LPD Calculation and Reduction Chart
Exterior Lighting LevelsB10
Lighting Drawing along with Notes / Legend
LPD Calculation and Reduction Chart
Exterior Lighting LevelsB10
LPD Calculation and Reduction Chart
LPD Calculation and Reduction Chart
Notes in Electrical Drawing
LPD Calculation and Reduction Chart
Use of Renewable Sources of Energy for domestic heatingB11
Extract from Specification
Use of Renewable Sources of Energy for domestic heatingB11
Hot Water Calculation
Use of Renewable Sources of Energy for domestic heatingB11
Hot Water Calculation / Notes in the drawing
Use of Renewable Sources of Energy for domestic heatingB11
Roof Top Water Supply Layout with Solar System Notes / Legend in the Drawing
Use of Renewable Sources of Energy for domestic heatingB11
Roof Top Water Supply Layout with Solar System Notes / Legend in the Drawing
Use of Renewable Sources of Energy for PowerB12
Solar PV system layout
Notes in the Electrical Drawing
THIS IS A VOLUNTARY CREDIT ……
Energy MeteringB13
Single Line Diagram
Energy MeteringB13
Metering Schedule
Extract of Specification
COMMISSIONINGB14
Commissioning Specifications (Extract)
COMMISSIONINGB14
Commissioning Specifications (Extract)
COMMISSIONINGB14
Commissioning Specifications (Extract)
COMMISSIONINGB14
Details of Training proposed
BUILDING ENERGY SIMULATION REPORT [Conditioned areas > 2000 m2]B15
A copy of the Energy Modeling Report
A copy of the Simulation output from software
General
1. GB consultant to follow same requirements as LEED based regulation.
2. GB should be from Trakhees re qualified list.
INDEPENDENT COMMISSIONING AGENT [Conditioned area >2000 m2]B16
General
1. Commissioning Specialist should follow same requirements as LEED based regulation.
2. Commissioning specialist should be from Trakhees re qualified list.
C. LIGHTING
Use of Solar Day lighting technologiesC1
Sky lightingTHIS IS A VOLUNTARY CREDIT ……
Relevant Extract / Section of Specification
Design Drawings showing Skyllights along with Clear LEGEND
Use of Energy Saving High Performance LampsC2
Villa Lighting Layout Drawings
Relevant Extract / Section of Specification
Use of Energy Saving High Performance Lamps [OFFICE Portion]C2
Notes / Legend in the Electrical Drawing
Use of Electronic BallastC3
Relevant Extract / Section of Specification
Electrical Drawing
Use of Electronic BallastC3
Notes / Legend in the Electrical Drawing
Use of Programmable thermostat for HVAC systemD1
Relevant Extract / Section of Specification
Use of Programmable thermostat for HVAC systemD1
Drawing indicating Thermostat locationProgrammable Thermostat with Timer controls at a basic level
T
Use of Programmable thermostat for HVAC systemD1
Notes / Legend in the Electrical Drawing
Programmable Thermostat with Timer controls at a basic level
T
Control of External LightsD2
Relevant Extract / Section of Specification
Electrical Drawing Notes / Legend in the Electrical Drawing
Control of External LightsD2
Interlock of Toilet / Bathroom FansD3
Relevant Extract / Section of Specification
Interlock of Toilet / Bathroom FansD3
Electrical Drawing / Thermostat location Notes / Legend in the Electrical Drawing
Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4
Relevant Extract / Section of Specification
Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4
Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4
Extract from Specification – Motion Sensor
Use of Occupancy Sensor / Motion Sensor for internal lighting devices D4
Electrical Drawing / Motion Sensor location
Notes / Legend in the Electrical Drawing
PART - 7
E. WATER
Usage of STP for treating Grey Water & Reuse of treated water E1
Relevant Extract / Section of Specification
THIS IS A VOLUNTARY CREDIT ……
Drawings indicating the proposed STP
July 2016Revision 00 Page 73 of 102
Performance Requirements of Sanitary Fittings E2
Relevant Extract / Section of Specification Comprising the flow rates
Performance Requirements of Sanitary Fittings E2
Notes from the Water Supply Layout Drawing
Water Efficient landscaping & Irrigation Systems E3
Relevant Extract / Section of Specification
Water Efficient landscaping & Irrigation Systems E3
Landscape layout / Setting out drawing
Water Efficient landscaping & Irrigation Systems E3
Relevant Notes in the Drawing
Water Efficient landscaping & Irrigation - Eliminate Potable Water E4
Relevant Extract / Section of Specification
Landscape layout / Setting out drawing
THIS IS A VOLUNTARY CREDIT ……
Water Efficient landscaping & Irrigation - Eliminate Potable Water E4
Drawings indicating the proposed STP
Landscape layout / Setting out drawing
THIS IS A VOLUNTARY CREDIT ……
PART - 8
F. ENVIRONMENT & INDOOR AIR QUALITY
Building Ventilation and Minimum Indoor Air Quality (IAQ)F1
Relevant Extract / Section of Specification
Building Ventilation and Minimum Indoor Air Quality (IAQ)F1
Fresh Air Calculations (sample)
Building Ventilation and Minimum Indoor Air Quality (IAQ)F1
Fresh Air Calculations (sample)
Building Ventilation and Minimum Indoor Air Quality (IAQ)F1
Drawing / Layout showing FAHU
Building Ventilation and Minimum Indoor Air Quality (IAQ)F1
Fresh Air Schematic
Control of Environmental Tobacco SmokeF2
NOT APPLICABLE ……
July 2016Revision 00 Page 87 of 102
Low Emitting Paints, Coatings, Adhesives and SealantsF3
Relevant Extract / Section of Specification mentioning the requirements
Drawing indicating the requirements under GENERAL NOTES / GENERL REQUIREMENTS
Use of Ozone Friendly materials in AC Eqpts,Thermal Insulation, Foam & FF EqptsF4
Relevant Extract / Section of Specification mentioning the requirements
Relevant Notes in the Drawing
PART -9
G. SUSTAINABLE SITE AND MANAGEMENT
Construction Activity Pollution Prevention (CAPP) / (ESC)G1
Draft template of Erosion & Sedimentation Control Plan
Construction Activity Pollution Prevention (CAPP) / (ESC)G1
Relevant Extract / Section of Specification mentioning the requirements
Heat Island Effect – Non RoofG2
Relevant Extract / Section of Specification mentioning the SRI requirements
Heat Island Effect – Non RoofG2
Drawings Highlighting the requirement
Relevant Notes in the Drawing
Heat Island Effect –RoofG3
Relevant Extract / Section of Specification mentioning the SRI requirements
Roof PlanRelevant Notes in the Drawing
PART - 10
H. OPERATIONAL SUSTAINABILIY
Recycling Facility – Storage & Collection of RecyclablesH1
Relevant Extract / Section of Specification mentioning the SRI requirements
Drawing indicating the location of Bins
Energy Efficient Equipments (White Goods)H2
Relevant Extract / Section of Specification
Energy Efficient Equipments (White Goods)H2
Letter of Undertaking by the client (where relevant)
Building User GuideH3
Extract of specification mentioning this requirement
Draft structure / format of the proposed building user guide
Building User GuideH3
Draft structure / format of the proposed building user guide
Facility / Building Services TuningH4
NOT APPLICABLE ……
END OF DOCUMENT