plan and concept © adventure playgrounds pty. ltd. 2015. … · 2018-11-12 · 7000 9000 3500 6500...

Post on 13-Jul-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Plan

and

Con

cept

©

Adv

entu

re P

layg

roun

ds P

ty. L

td. 2

015

. Ill

ustr

atio

ns a

re s

chem

atic

onl

y, a

ctua

l det

ails

may

var

y.

S3050N 3.0m Lunar Net Centre Mast StructureEquipment Illustration

sales@adventureplus.net.au1300 237 587adventureplus.net.au

7000

9000

650035

00

4000

8500

1500

min.

1500

min.

2500 min. 2500 min.

Provide undersurfacing in accordance with AS/NZS 4422:1996.Mulch undersurfacing should be 200mm minimum compacted depth.

Plans and illustrations are schematic only, actual details may vary.Do not scale for dimensions. Allow 5% minimum additionalclearance for site variations.

Falling Space:

SCALE1:100

0 1 2 3 4

Minimum impact areaas per AS4685-2014

Required free spaceas per AS4685-2014

Victorian Dept. ofEducation minimum

Recommendedclearance area

Plan

and

Con

cept

©

Adv

entu

re P

layg

roun

ds P

ty. L

td. 2

015

.

S3050N 3.0m Lunar Net Centre Mast StructureEquipment and Impact Areas Plan

sales@adventureplus.net.au1300 237 587adventureplus.net.au

top related