phase module cart power point

Post on 16-Apr-2017

48 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Reduction of waste and increasing productivity through 5S and Lean Manufacturing activities

5s, Lean Manufacturing, Productivity

2 GE Title or job number

05/02/2023

• Problem Areas• Mishandling of Product• Safety Hazards • Lifting heavy material above head

• Flow of Material• Damaged components

Phase Module Flow Tube Cart

3 GE Title or job number

05/02/2023

• Improvement Areas• Process Improvement• Flow of Material• Handling• Safety

Phase Module Flow Tube Cart

4 GE Title or job number

05/02/2023

Before Phase Module Rack Finished Phase Module Cart

Phase Module Flow Tube Cart

top related