JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,Jodhpur/Pali/Barmer/Jalore/Bikaner/Sriganganagar/Hanumangarh/Churu.
Sub.: Regarding detail of pending new & load extention applications for HT category.
On the subject cited above, I am directed to enquire the status of
pending HT new connection & load extention applications.
As such, while enclosing the format for the desired information
you are requested to kindly intimate the same by 5 th (detail as on end of
previous month) & 20th (detail as on 15th of each month) day of each month, so
that same may be apprised to higher authorities.
Kindly treat it as urgent.
Encl.: Format
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new
Urgent by Fax
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(O&M),Jodhpur Discom,Bikaner/Churu.
Sub.: Regarding pending new & load extension applications for HT category.
Ref: Letter No.1229 dtd 09.06.11 of Zonal Chief Engineer(O&M-BKZ), Jodhpur Discom, Bikaner.
While observing the information regarding subject cited above as
send by Zonal Chief Engineer(O&M-BKZ), Jodhpur Discom, Bikaner vide
letter under reference, it has been observed that estimate for some of the
connections are pending beyond the permissible time limit as prescribed by
RERC in TCOS-2004/Standard of Performance and DN has not been issued
even after lapse of more than 3 months.
As such, you are requested to kindly look into the matter personally
and arrange to get released the connections within the specified time period as
specified by Hon’ble Commission.
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-BKZ), Jodhpur Discom, Bikaner for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new
Urgent by Fax
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,Jodhpur/Pali/Barmer/Jalore/Bikaner/Sriganganagar/Hanumangarh/Churu.
Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.
Ref: This office letter No.901 dtd 08.06.11
In continuation to this office letter under reference, vide which you were requested to send the status of pending HT new connection & load extention applications. In this context, the detail of MIP consumers has also been desired by higher authorities.
As such, while enclosing the new format for the desired information you are requested to kindly intimate the same by 5th (detail as on end of previous month) & 20th (detail as on 15th of each month) day of each month, so that same may be apprised to higher authorities. The position as on today be send today itself, by fax(0291-5106366), for appraisal.
Kindly treat it as urgent.
Encl.: Format
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
Urgent by Fax
G:pending new
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,Jodhpur/Pali/Barmer/Jalore/Bikaner/Sriganganagar/Hanumangarh/Churu.
Sub.: Regarding pendency of new & load extension applications for MIP & HT category.
While observing the status of pending new & load extension cases,
a serious view has been taken by higher authorities regarding delay in releasing
of the same.
As such, you are requested to kindly monitor the status personally
and instruct the concerns to get release the connections within the specified time
period, as specified by Hon’ble Commission and circulated vide booklet
“Standard of Performance” and TCOS-2004. The copy of the relevant section is
enclosed herewith for your ready reference.
Encl: As above.
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-BKZ), Jodhpur Discom, Bikaner for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new
JODHPUR VIDHYUT VITRAN NIGAM LIMITED
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,Jodhpur/Pali/Barmer/Jalore/Bikaner/Sriganganagar/Hanumangarh/Churu.
Sub.: Regarding pendency of new & load extention applications for MIP & HT category.
While observing the information regarding subject cited above, it has been observed that many connections are pending due to non-submission of “L” form/any other document by consumer. In this context, it is clarified that as per the provisions mentioned at Clause-4(5) of TCOS-2004 the applicant has to submit “L” form at the time of application. However, in case of HT connection, “L” form may be furnished later but before release of connection. It has also been mentioned at Clause-4(10) of TCOS-2004(amendment issued vide Comml.JDP/420) that, “The Nigam will provide the receipt of the application/“L” form received from the applicant. In case deficiency or incomplete application, the Nigam, within seven days of the receipt of application, shall inform the applicant of the deficiency, including non-attachment of L-Form. If the deficiency is not removed by the applicant within 30 days from the date of receipt of such intimation by the applicant, the application will stand cancelled and the application fee forfeited.”
In this context, you are advised to ensure that such type of deficiency checked at the time of application, as any delay badly reflects the image of Nigam and also there is a great loss of revenue to the Nigam.
(D.C.BHURAT)CHIEF ENGINEER(HQ)
JODHPUR DISCOM, JODHPURCopy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.
CHIEF ENGINEER(HQ)JODHPUR DISCOM, JODHPUR
G:pending new
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC),Jodhpur Discom,Jodhpur.
Sub.: Regarding pending new & load extension applications for HT & MIP category.
Ref: Your office letter No.1158 dtd 16.06.11.
While observing the information regarding subject cited above as received vide letter under reference, it has been observed that DN for some of the connections are pending beyond the permissible time limit as prescribed by RERC vide Standard of Performance.
S.No. Name of Consumer Dt. of Application1 M/s Hindustan Gum & Chemical, Basni 25.04.112 M/s Ganga Arts, Boranada 26.04.113 M/s Indigo Paints, Boranada 04.05.114 M/s Rawat Steel, Boranada 04.05.115 M/s Geeta Handicraft, Boranada 09.05.116 M/s Shree Nath Dye Chem, Basni 03.05.117 M/s Angeera Timber, Basni 11.05.118 M/s Angira Ind., Basni 11.05.119 M/s Balaji Art Craft, Sangaria 12.01.1110 M/s Nakoda Spat Mental, Sangaria 19.01.1111 M/s Christater Ind., Sangaria 23.03.1112 M/s Shree Om Agro Products, Boranada 31.03.1113 M/s Nutritions Agro Food Product, Boranada 21.04.1114 M/s Rajasthan Gum Pvt. Ltd., Boranada 10.02.11
As such, you are requested to kindly look into the matter personally and arrange to get released the connections within the specified time period as specified by Hon’ble Commission.
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-JDZ), Jodhpur Discom, Jodhpur, for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(DC/O&M),Jodhpur Discom,Jodhpur/Pali/Jalore/BarmerBikaner/Sriganganagar/Churu.
Sub.: Regarding pending new & load extension applications for HT & MIP category.
Ref: Your information as on dtd 15.06.11.
While observing the information regarding subject cited above as
received vide letter under reference, it has been observed that DN for some of
the connections are pending beyond the permissible time limit as prescribed by
RERC vide Standard of Performance.
As such, you are requested to kindly look into the matter personally
and arrange to get released the connections within the specified time period as
specified by Hon’ble Commission.
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner, for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,Jodhpur/Pali/Jalore/BarmerBikaner/Sriganganagar/Churu.
Sub.: Regarding pending new & load extension applications for HT & MIP category.
Ref: Your information as on dtd 15.06.11.
While observing the status of pending new & load extension cases,
a serious view has been taken by higher authorities regarding delay in releasing
of the connections. In this context, I am directed to enquire the name of
officers/official, on whom part the delay has occurred.
As such, you are requested to kindly intimate the name of such
officers/officials within a period of seven days, for further needful at this end.
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner, for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new
Details of delay in new/load extension application of MIP & HT category
Information as on 15.06.11
Jodhpur Zone, SE(CC), Jodhpur
S.No. Name of Consumer Applied Load Dt. of Application
Dt of DN
Dt of SCO
1 M/s Hindustan Gum & Chemical, Basni
300 to 450HP, CD 225 to 390KVA
25.04.11 - -
2 M/s Ganga Arts, Boranada 59 to 90HP 26.04.11 - -3 M/s Indigo Paints,
BoranadaCD 80 to 125 KVA 04.05.11 - -
4 M/s Rawat Steel, Boranada 15 to 100 HP 04.05.11 - -5 M/s Geeta Handicraft,
Boranada20 to 59 HP 09.05.11 - -
6 M/s Shree Nath Dye Chem, Basni
24 to 70 HP 03.05.11 -
7 M/s Angeera Timber, Basni
24 to 35 HP 11.05.11 -
8 M/s Angira Ind., Basni 24 to 40 HP 11.05.11 -9 M/s Balaji Art Craft,
Sangaria25 to 59 HP 12.01.11 -
10 M/s Nakoda Spat Mental, Sangaria
5 to 40 HP 19.01.11 -
11 M/s Christater Ind., Sangaria
25 to 150HP CD 125KVA
23.03.11 -
12 M/s Shree Om Agro Products, Boranada
1200HP CD 1000KVA
31.03.11 -
13 M/s Nutritions Agro Food Product, Boranada
400 HP 21.04.11 -
14 M/s Rajasthan Gum Pvt. Ltd., Boranada
4350 HP CD 2400KVA
10.02.11 -
15 M/s G.G.Udhyog, Basni 70 HP 16.12.10 12.01.11 Job16 M/s Vinay Udhyog 35 HP 31.03.11 04.04.11 Job17 M/s Pawan Putra Ind.
Basni25 to 40HP 17.01.11 15.02.11 Job
18 M/s M.Y. Textiles Basni 47 to 57 HP 25.01.11 25.01.11 Job19 M/s Dungar Ram Pal 14.7 to 35 HP 23.12.10 14.02.11 Job20 M/s India Art &
Emporium40 to 50 HP 22.10.10 08.11.10 Job
21 M/s Parag Products 59 to 125 HP 17.01.11 08.03.11 Job22 M/s Hanuman Industries 59 to 125 HP 07.03.11 11.03.11 Job
G:pending new
Details of delay in new/load extension application of MIP & HT category
Information as on 15.06.11
Jodhpur Zone, SE(DC), Jodhpur
S.No.
Name of Consumer Applied Load
Dt. of Application
Dt of DN Dt of SCO
1 M/s Baba Ramdev Chem 550HP 19.11.10 03.05.11 25.05.112 M/s PHED 360KW 22.02.07 28.03.07 Job3 M/s PHED XEN DDI 1394KW 22.02.07 28.03.07 Job4 M/s PHED XEN DDI 484KW 22.02.07 28.03.07 Job5 M/s AEN PHED 310 KW 25.02.10 05.03.10 Job6 M/s AEN PHED 600 KW 31.12.10 Tech.San.7 M/s AEN PHED 160 KW 31.12.10 T.S.8 M/s AEN PHED 160 KW 05.01.11 T.S.9 M/s AEN PHED 160 KW 06.01.11 T.S.10 M/s AEN PHED 160 KW 31.12.10 T.S.
Jodhpur Zone, SE(O&M), Jalore
1 M/s Narpat Singh 59 HP 21.04.112 M/s Shree Ganesh Granite,
Jalore25 to 60HP 26.04.11
3 M/s Ratneshwar Ind. 60 to 120 HP 05.05.11
G:pending new
Details of delay in new/load extension application of MIP & HT category
Information as on 15.06.11
Jodhpur Zone, SE(O&M), Pali
S.No. Name of Consumer Applied Load Dt. of Application
Dt of DN
Dt of SCO
1 M/s Shiv Agrico, Rani 250 HP 03.05.10 03.09.10 L form2 M/s Panchsil Globe, Abu
Road10 MW 14.09.10 PPM to
TCC3 M/s J.B.Licene Steel, Abu
Road25 MW 14.09.10
4 M/s Gulsan Polymers, Abu Road
2000 KVA 29.09.10
5 M/s Puran Prakash, Pali 59 to 85 HP 13.04.116 M/s Sharda Udhyog, Pali 1350 to 1485
HP06.09.10
7 M/s Ma Kripa Ind., Pali 55 to 80 HP 28.12.10 26.04.118 M/s Shree Nath Minerals,
Sojat City59 to 120 HP 23.12.10 14.01.11 Job
9 M/s Shiv Jyoti P Ltd. 22 HP to 400KVA
18.04.11
10 M/s Minerals Orientals, Reodar
125 to 200 HP 15.03.11
11 M/s Shiv Marbles, Reodar 59 to 150 HP 11.03.1112 M/s Shri Nath Stone Crusher,
Reodar59 to 175 HP 17.03.11
Jodhpur Zone, SE(O&M), Barmer
1 M/s Hukma Ram, Guda 45 HP 13.10.10 25.02.11 Job2 M/s Raj Minerals, Barmer 59 HP 04.02.11 17.03.11 Job3 M/s Ganpati Plaster, Baytoo 35 HP 15.03.10 21.05.10 04.01.114 M/s Valkoo Jaisalmer Road, Barmer 50 to 149
HP07.01.11
5 M/s Karni Marbel, Barmer 40 to 59 HP 15.02.116 M/s Rajwest Power 4MVA 16.11.10
G:pending new
Details of delay in new/load extension application of MIP & HT category
Information as on 15.06.11
Bikaner Zone, SE(O&M), Bikaner
S.No. Name of Consumer Applied Load
Dt. of Application
Dt of DN Dt of SCO
1 M/s Welcome Oxizen Ind., Salasar
325 15.03.11
2 M/s Anupurna Ind. Godwala 400 12.07.103 M/s Sipani Woolen Pvt. Ltd.,
Palana200 28.03.11
4 M/s Balaji Woolen Textile, Bikaner
59 05.05.11
5 M/s Quartz India, Bikaner 59 02.05.116 M/s Balaji Mines & Minerals,
Bikaner59 04.05.11
7 M/s Agarwal Packaging, Bikaner
50 to 80 03.05.11
Bikaner Zone, SE(O&M), Sriganganagar
1 M/s Mani Ram, Keshrisinghpur 59 to 70 HP 20.01.112 M/s GE Army, 2440 to 4900KVA 18.09.09 23.03.11 Job3 M/s Gurmel Singh, Raisinghpur 20 to 80HP 27.12.10
Bikaner Zone, SE(O&M), Churu
1 M/sXEN(PHED), Ratangarh 2500 HP 27.02.112 M/s Balaji Stone Ind., Bidasar 55 HP 21.10.10 26.11.10 Job3 M/s Minral Plaster, Sardarsahar 59 HP 02.01.11 02.06.114 M/s Shri Ram Gril Udhyog,
Rajaldesar150HP 30.01.11 31.05.11
5 M/s Kanhaya Lal, Ladnun 24 to 59 HP 30.06.106 M/s Kishan Lal Ladnun 20 to 40 HP 03.03.117 M/s Ganesh Repairing, Ladnun 44 to 132HP 02.03.118 M/s Laxmi Crusher Udhyog,
Sujangarh120 to 250 HP
30.03.11
9 M/s Ganga Crusher, Ladnun 120 to 220 HP
15.12.10
Bikaner Zone, SE(O&M), Hanumangarh
Nil
G:pending new
As per Standard of performance Regulation, 2003 issued by RERC
DN to be issued for load up 60 HP 21 days
Loads 60HP to 300 KW(402 HP)
G:pending new
Urgent by Fax
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,…………………….
Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.
Ref: This office letter No.1014 dtd 15.06.11
On the subject captioned above and this office letter under reference, vide which you were requested to send the status of pending HT & MIP category new connection & load extention applications by 5 th (detail as on end of previous month) & 20th (detail as on 15th of each month) day of each month.
The desired information as on 30.06.11 has not been received till date, as such you are again requested to kindly arrange to send the same today itself, by fax(0291-5106366), for appraisal.
Kindly treat it as urgent.
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new
Details of delay in new/load extension application of MIP & HT category Information as on 15.07.11
Jodhpur Zone, SE(CC), JodhpurS.No. Name of Consumer Applied Load Dt. of
ApplicationDt of DN
Dt of SCO
Remarks
1 M/s Hindustan Gum & Chemical, Basni
300 to 450HP, CD 225 to 390KVA
25.04.11 24.06.11 -
2 M/s Angeera Timber, Basni
24 to 35 HP 11.05.11 12.07.11
3 M/s Angira Ind., Basni
24 to 40 HP 11.05.11 12.07.11
4 M/s Balaji Art Craft, Sangaria
25 to 59 HP 12.01.11 27.06.11
5 M/s Nakoda Spat Mental, Sangaria
5 to 40 HP 19.01.11 13.06.11 12.07.11
Not released
6 M/s Dungar Ram Pal
14.7 to 35 HP 23.12.10 14.02.11 Job
7 M/s Indra Art & Emp
40 to 50 HP 22.10.10 08.11.10 Job
8 M/s Parag Product 59 to 125 HP 17.01.11 08.03.11 Job9 M/s Prakash Stone 59 HP 27.10.10 13.12.10 07.06.1
1Not released
10 M/s Bhawal Export 18 to 59 HP 03.03.11 08.03.11 25.05.11
11 M/s S.K.Stone 59 HP 21.12.10 15.02.11 Job12 M/s Sun Moon
Stone59 HP 28.01.11 15.02.11 Job
13 M/s Radiant Stone 59 HP 09.03.11 13.04.11 Job14 M/s Mahaveer Sand
stone59 HP 11.05.11
15 M/s Mukal Stone 59 HP 17.05.1116 M/s Champa Lal 59 HP 31.05.1117 M/s Shanti
Enterprises150 to 250HP 01.06.11
18 M/s Shree Ram Agro
50 to 85 HP 10.02.11 08.03.11 24.06.11
CTPT req.
19 M/s Quart N Craft 25 to 45 HP 08.04.11 03.05.11 22.06.11
MIP box
20 M/s Richa Textile 70 to 150 HP 17.03.11 02.05.11 15.06.11
CTPT req
21 M/s Tak Udhyog 20 to 45 HP 18.04.11 03.05.11 26.05.11
MIP box
22 M/s Hanuman Ind. 59 to 125 HP 07.03.11 11.03.11 Job23 M/s Veenith Oil Ind
Boranada10 to 630 HP CD 460KVA
14.03.11 28.04.11 26.05.11
Not rele.
G:pending new
Details of delay in new/load extension application of MIP & HT category
Information as on 15.07.11Jodhpur Zone, SE(DC), JodhpurS.No. Name of Consumer Applied
LoadDt. of Application
Dt of DN Dt of SCO
Remarks
1 M/s PHED XEN DDI
1394KW 22.02.07 28.03.07 Job
2 M/s AEN PHED 310 KW 25.02.10 05.03.10 Job3 M/s AEN PHED 600 KW 31.12.10 Tech.San4 M/s AEN PHED 160 KW 31.12.10 T.S.5 M/s AEN PHED 150 KW 05.01.11 T.S.6 M/s AEN PHED 150 KW 06.01.11 T.S.7 M/s AEN PHED 160 KW 31.12.10 T.S.8 M/s Dinesh
Fregrance25 to 300 HP
15.12.10 Under sanction
9 M/s Contemparary Furnitures
15 to 200 HP
12.01.11 30.05.11 Job
10 M/s Manidhari Gums and Chem
10 to 500HP
08.03.11 Under sanction
11 M/s AEN PHED Osian
60KW 29.12.10 Under sanction
12 M/s AEN PHED Osian
80 KW 06.01.11 Under sanction
13 M/s AEN PHED Baori
100KW 31.12.10 Under sanction
14 M/s K.D. Stone 42 HP 09.12.1015 M/s Mahadev Stone 59 HP 21.12.1016 M/s Jakhar Stone 59 HP 24.11.10 08.03.11 Job17 M/s Santosh Stone 59 HP 28.12.1018 M/s Bheru Singh 59 HP 10.03.1119 M/s Inder Singh 30 HP 13.04.11 06.07.11 Job20 M/s Om Stone 59 HP 21.04.11 29.06.11 Job21 M/s Hawa Kanwar 59 HP 04.05.11 Under san22 M/s Sona Textile 30 to 49 HP 29.12.1023 M/s A.B.Block &
Brick48 to 132 HP
28.02.11
24 M/s Laxmi Stone Works
25 to 55 HP 15.11.10
G:pending new
Jodhpur Zone, SE(O&M), Jalore Information as on 15.07.11
S.No. Name of Consumer Applied Load
Dt. of Application
Dt of DN Dt of SCO
Remarks
1 M/s Narpat Singh 59 HP 21.04.11 -2 M/s Mamta Polymers 47.5 HP 07.10.10 09.11.10 18.01.11 (fitting not
complete)In the information of Jalore Circle for many applications it has been mentioned that “factory construction work not completed”. In many case the Job order not completed even than have requested that transformer, meter, meter box required.
Details of delay in new/load extension application of MIP & HT category
Information as on 15.07.11Jodhpur Zone, SE(O&M), PaliS.No.
Name of Consumer Applied Load
Dt. of Appl.
Dt of DN Dt of SCO
Remarks
1 M/s Shiv Agrico, Rani
250 HP 03.05.10 03.09.10 Job
2 M/s Panchsil Globe, Abu Road
10 MW 14.09.10 PPM to TCC
3 M/s J.B.Licene Steel, Abu Road
25 MW 14.09.10 PPM to TCC
4 M/s Varun Ind 16.825 MW 15.02.11 PPM to TCC5 M/s Gulsan
Polymers, Abu Road2000 KVA 29.09.10 20.06.11
6 M/s Puran Prakash, Pali
59 to 85 HP 13.04.11 06.07.11
7 M/s Sharda Udhyog, Pali
1350 to 1485 HP
06.09.10 PPMb
8 M/s Shiv Jyoti P Ltd. 22 HP to 400KVA
18.04.11 Under Sanction
9 M/s Minerals Orientals, Reodar
125 to 200 HP
15.03.11 16.06.11
10 M/s Shiv Marbles, Reodar
59 to 150 HP
11.03.11 16.06.11 Job
11 M/s R.K. International, Falna
95 HP 04.04.11 13.07.11
12 M/s Bhavika Ispat, Rani
124 to 149 HP
04.05.11 Under Estimate
12 M/s Khandelwal Minerals
400 HP 29.03.11 04.04.11 L form pending
13 M/s Parswanath Ent 56 to 95 HP 18.05.11
G:pending new
Details of delay in new/load extension application of MIP & HT category Information as on 15.07.11
Jodhpur Zone, SE(O&M), Barmer
S.No. Name of Consumer Applied Load
Dt. of Application
Dt of DN
Dt of SCO
Remarks
1 M/s Hukma Ram, Guda 45 HP 13.10.10 25.02.11 Job2 M/s Ramasar Stone
Crusher, Barmer(R)59 HP 24.05.10 14.08.10 07.02.1
13 M/s Ganpati Plaster,
Baytoo35 HP 15.03.10 21.05.10 04.01.1
14 M/s Valkoo Jaisalmer
Road, Barmer50 to 149 HP
07.01.11
5 M/s Karni Marbel, Barmer
40 to 59 HP
15.02.11 21.06.11
6 M/s Rajwest Power 4MVA 16.11.107 M/s Vimloxi Products 40 HP 20.05.118 M/s Mahadev Minerals,
Baytoo85 HP 18.04.11 02.02.11 24.02.1
19 M/s Pooniya Minerals,
Baytoo94 HP 27.04.11
10 M/s Khiljee Ice, Barmer 59 to 149 HP
05.07.10 18.11.10
11 M/s Nakoda Minerals 55 HP 11.10.10 30.12.10 06.01.11
12 M/s Mahadev Minerals, Bhadkha, Baytoo
75 HP 05.01.11 02.02.11 09.04.11
13 M/s Laxmi Granite, Jaisalmer
59 to 350 15.11.10 12.05.11
14 M/s R.K.Stone 59 HP 22.02.11 21.03.11 27.06.11
Not rele.
15 M/s Jaishree/Gopal Das 59 HP 08.02.11 27.05.11 Job16 M/s Balaji Granite 59 HP 12.10.10 31.12.10 26.06.1
1Not rele.
17 M/s Neelkanth Granite 59 HP 20.04.11 20.05.11 11.06.11
Not rele.
18 M/s Kohinoor Shilpgram 106 to 166 HP
04.06.10 30.12.10 Job
G:pending new
Details of delay in new/load extension application of MIP & HT categoryInformation as on 15.07.11
Bikaner Zone, SE(O&M), BikanerS.No. Name of Consumer Applied
LoadDt. of Application
Dt of DN Dt of SCO
Remarks
1 M/s Welcome Oxizen Ind., Salasar
325 15.03.11 Under sanction
2 M/s Anupurna Ind. Godwala
400 12.07.10 09.06.11
3 M/s Gajanand Sunder lal
59 03.03.11 24.05.11
4 M/s Balaji Woolen Textile, Bikaner
59 05.05.11 30.06.11 Under sanction
5 M/s Maheswari Ind., Napasar
37 to 59 HP
30.04.11 13.07.11
6 M/s Balaji Mines & Constr., Bikaner
59 04.05.11 Under Estimate
7 M/s Agarwal Packaging, Bikaner
50 to 80 03.05.11 Under sanction
8 M/s National Ind. 20 to 110 16.05.11 Under sanction
9 J.K. Industires KIA 35 to 59 HP
26.05.11
10 M/s Shyam Sweet KIA BKN
25 To 35 HP
24.02.11 Under Sanction
11 M/s Bansal Udhyog 35 HP 06.07.11 Under Estimate
Bikaner Zone, SE(O&M), Sriganganagar
S.No. Name of Consumer Applied Load
Dt. of Application
Dt of DN Dt of SCO
Remarks
1 M/s Mani Ram, Keshrisinghpur
59 to 70 HP
20.01.11 Notice for CD
2 M/s GE Army, 2440 to 4900KVA
18.09.09 23.03.11 Job
3 M/s Gurmet Singh, Raisinghpur
20 to 80HP
27.12.10 Under sanction
4 M/s Rajesh Kumar/ Harbans Lal
22 to 55 HP
01.03.11 14.06.10 L form due
5 M/s Mahipal Food 80 to 250 HP
01.02.11 07.03.11 L form 27.06.11
6 M/s M.D. Industries 301 HP 170 KVA
19.11.10 10.01.11 Job issued on21.06.11
G:pending new
Details of delay in new/load extension application of MIP & HT category
Information as on 15.07.11Bikaner Zone, SE(O&M), Churu
S.No.
Name of Consumer Applied Load
Dt. of Appl.
Dt of DN Dt of SCO
Remarks
1 M/sXEN(PHED), Ratangarh
2500 HP 27.02.11 Under sanction
2 M/s Shri Ram Grit Udhyog, Rajaldesar
150HP 30.01.11 31.05.11 Job
3 M/s Farien Ind. Khanpur 59 HP 20.05.11 Estimate4 M/s Ganpati Marble,
Charwas150 HP 24.06.10 28.10.10 - Revised
estimate5 M/s Kanhaya Lal,
Ladnun24 to 59 HP
30.06.10 Blue print not provide
6 M/s Kishan Lal Ladnun 20 to 40 HP
03.03.11 21.07.11
7 M/s Ganesh Repairing, Ladnun
44 to 132HP
02.03.11 Blue print not provide
8 M/s Laxmi Crusher Udhyog, Sujangarh
120 to 250 HP
30.03.11 Under sanction
9 M/s Ganga Crusher, Ladnun
120 to 220 HP
15.12.10 Under Estimate
10 M/s Pawan Crusher, Sarothia
140 to 200 HP
11.05.11 06.07.11 Under Estimate
Bikaner Zone, SE(O&M), Hanumangarh
Nil
G:pending new
Details of delay in release of new/load extension application of MIP & HT category
Information as on 15.07.11SE(M&P), JodhpurS.No. Name of Consumer Applied
LoadDt. of Application
Dt of DN
Dt of SCO
Remarks
1 M/s Tak Udhyog, Basni 20 to 45 HP
18.04.11 03.05.11 26.05.11
2 M/s Prakash Stone, Basni
59 HP 27.10.10 13.12.10 07.06.11
3 M/s Veenith Oil, Basni 10 to 630 HP
14.03.11 28.04.11 26.05.11
4 M/s Bhawal Export, NPH
18 to 59 HP
03.03.11 08.03.11 25.05.11
5 M/s Shree Ram Agro Product, Boranada
59 to 85 HP
10.02.11 08.03.11 25.05.11
6 M/s Quart N Craft, Boranada
25 to 45 HP
08.04.11 03.05.11 22.06.11
MIP box req
7 M/s Richa Textile, Basni
70 to 150 HP
17.03.11 02.05.11 15.06.11
CTPT req
8 M/s R.K.Stone, Jaisalmer
59 HP 22.02.11 21.03.11 27.06.11
9 M/s Balaji Granite, Jaisalmer(R)
59 HP 12.10.10 31.12.10 26.06.11
10 M/s Neelkanth Granite, Pokran
59 HP 20.04.11 20.05.11 11.06.11
G:pending new
Urgent by Fax
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,…………………….
Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.
Ref: This office letter No.1081 dtd.20-06-11, 1095 dtd.22-06-11, 1096 dtd.22-06-11.
On the subject captioned above and letters under reference, vide which you were requested to ensure for release of connections within specified time period and to send the names of officers/officials on whom part the delay has occurred.
While observing the information of pending MIP and HT categories, new and load extension applications, as on 15th July, 2011, it has been noticed that delay has occurred in release of connections in so many cases. As such, while enclosing the list of some such applications, where delay has occurred, you are, requested to kindly look into the matter personally and arrange to get released the connections at the earliest. Further, it is again, requested to kindly intimate the names of officers/officials on whom part the delay has occurred.
Kindly treat it as urgent.
Encl.:As above
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPURCopy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner, for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
Urgent by Fax
G:pending new
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(M&P),Jodhpur Discom,Jodhpur
Sub.: Regarding detail of release of new & load extention applications for MIP & HT category.
On the subject captioned above, while observing the information of pending MIP and HT categories, new and load extension applications, as on 15 th
July, 2011, it has been noticed that delay has occurred in release of connections in so many cases.
As such, while enclosing the list of some such applications, where delay has occurred, you are, requested to kindly look into the matter personally and arrange to get released the connections at the earliest. Further, it is requested to kindly intimate the names of officers/officials on whom part the delay has occurred.
Kindly treat it as urgent.
Encl.:As above
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
G:pending new
Urgent by Fax
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,…………………….
Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.
Ref: This office letter No.1014 dtd 15.06.11
On the subject captioned above and this office letter under reference, vide which you were requested to send the status of pending HT & MIP category new connection & load extention applications by 5 th (detail as on end of previous month) & 20th (detail as on 15th of each month) day of each month.
The desired information as on 15.07.11 has not been received till date, as such you are again requested to kindly arrange to send the same today itself, by fax(0291-5106366), for appraisal.
Kindly treat it as urgent.
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new
Details of delay in new/load extension application of MIP & HT category Information as on 15.09.11
Jodhpur Zone, SE(CC), JodhpurS.No. Name of Consumer Applied
LoadDt. of Appl.
Dt of DN Dt of SCO
Remarks
1 M/s Mahaveer send Ston
59 HP 11.05.11 25.07.11Under Job work
2 M/s Mukal Stone Art S.S.
59 HP 17.05.11 25.07.11Under Job work
3M/s Champa Lal S.S. 59 HP 31.05.11 25.07.11
Under Job work
4M/s N.K. Stone S.S. 59 HP 06.07.11
Notice for open plot
5M/s R.S. Stone & Art 59 HP 07.07.11
Notice for open plot
6M/s Gashi Ram S.S. 59 HP 12.07.11 13.09.11
Under Garece period
7 M/s Chand Mandi Stone S.s.
59 HP 13.07.11Under Notice open your plot
8M/s Kirshan Stone Art 59 HP 19.07.11 13.09.11
Under Job work
9M/s Marwar Stone Art 59 HP 26.07.11
Under objection
10
M/s Rajasthan Gum Pvt. Ltd. Boranada
4350 HP CD 2400 KVA
10.02.11 29.06.11
L Form & consumer side job work not carried out
11M/s Sunita Hydro Colloides Boranada
8900 HP CD 3500
16.03.11Under Revised estimate
12 M/S Chopara Strcts Ltd. Borananda
1700 HP CD 800
29.06.11 Notice for open plot
13 M/s Radiant Packing Boranada
58 HP 18.05.11 04.08.11Under Job work
14 M/s Sardar Espises Boranada
59 HP 11.07.11Notice for ownership
15 M/s Relience Matal Sangariya
75 HP CD 50 K
28.07.11Under observation
16M/s Gopal Sand Stone
150 HP CD 90
05.07.11 25.07.11Under Job work
G:pending new
Details of delay in new/load extension application of MIP & HT category
Information as on 15.09.11Jodhpur Zone, SE(DC), JodhpurS.No. Name of Consumer Applied
LoadDt. of Application
Dt of DN Dt of SCO
Remarks
1 M/s PHED XEN DDI 1394KW 22.02.07 28.03.07 Job2 M/s AEN PHED 310 KW 25.02.10 05.03.10 Job3 M/s AEN PHED 600 KW 31.12.10 Tech.San4 M/s AEN PHED 160 KW 31.12.10 T.S.5 M/s AEN PHED 150 KW 05.01.11 T.S.6 M/s AEN PHED 150 KW 06.01.11 T.S.7 M/s AEN PHED 160 KW 31.12.10 T.S.8 M/s Dinesh Fregrance 25 to 300 15.12.10 Under sanct9 M/s AEN PHED Osian 60KW 29.12.10 Under sanct10 M/s AEN PHED Osian 80 KW 06.01.11 Under sanct11 M/s AEN PHED Baori 100KW 31.12.10 Under sanct12 M/s Maa Kripa 59 HP 08.04.11 06.07.1113 M/s Jakhar Stone 59 HP 24.11.10 08.03.11 Job14 M/s Om Stone 59 HP 21.04.11 29.06.11 14.09.1115 M/s Sona Textile 30 to 49 H 29.12.1016 M/s A.B.Block & Bric 48 to 132 28.02.1117 M/s Laxmi Stone Work 25 to 55 H 15.11.1018 M/s Shivam Chemical,
Piparcity140 to 275 HP
11.11.10
19 M/s Laxmi Ice, Bilara 35 to 50H 11.04.1120 M/s Barfa Zinning,
Bilara40 to 59 HP
11.04.11
21 M/s Dudi Stone, Bilara 59 HP 15.03.1122 M/s Jai Shankar Stone 59 HP 10.06.1123 M/s Dev Dasrath Stone 150 HP 24.06.1124 M/S New
Jagdamba Send Sto 59 7.7.11
Under Estimate
25 M/S Kusum Send St 59 12.7.11
Estimate
26 M/S Puja Stone 59 12.7.11 Estimate27 M/S Veer Teja
Stone 59 18.7.11Estimate
28 M/S B.S. Stone 125 13.7.11 Estimate29 M/S Ashapurna
Send Stone Keru 55 8.07.11Under
Estimate30 M/S Lotus
Engitech 89 11.7.11Estimate
31 Contact Electricts35 TO 45H
13.7.10Estimate
32 Indian Go Direct35 To55H
15.7.10 Estimate
33 M/S Raj Chemicals Rinya(Re-Open)
59 To 80HP
27.7.11Under Estimate
34 M/S Prince Chemicals Jawasiy
30 To 59HP
13.7.11Under Estimate
G:pending new
G:pending new
Jodhpur Zone, SE(O&M), Jalore Information as on 15.09.11
S.No. Name of Consumer Applied Load
Dt. of Application
Dt of DN Dt of SCO
Remarks
1 M/s Veer Teja Granite 60 HP 25.05.10 09.08.11 Job2 M/s Suraj Stone, Bhagli 60 HP 11.04.11 02.09.11 Job3 M/s Jai Rana Stone 60 HP
25.04.1110.06.11
09.08.11 Job
4 M/s Dhanlaxmi Stone, Madalpura
60 HP 27.04.11 09.08.11 Job
5 M/s Maa Sundha Granite, Madalpura
60 HP 10.06.11 09.08.11 Job
6 M/S Om Granite, Bishnagarh
45 HP 23.06.11 - Job
7 M/S Rajesh Granite, Bishangarh
40 HP 8.07.11 - Job
8 M/s Harsh Bherav Granite Ind. Madalpura
150 HP 20.04.11 16.06.1118.08.11 T/F, Met &
M. Box req.
9 M/s Maruti Grani Marmo, Bhagli
150 HP 24.05.11 27.07.11 Job
10 M/s Natural Granite, Bhagali
150 HP 01.06.11 1.09.11 Job
11 M/s Ratan Deep Granite, Madalpura
135 HP 09.06.11 1.09.11 Job
12 M/s Hanuman Stoneo, Madalpura
60 HP 06.07.11 2.09.11 Job
13 M/s Nagneshi Granite59 HP 25.04.11 23.08.11 Job
14 M/s Vikas Grani Marmo 125 HP 13.06.11 9.09.11 Job15 M/s Shiv Granite 60 HP 17.06.11 2.09.11 Job16 M/s S.R.Granite 60 HP 20.06.11 2.09.11 Job17 M/s Mukul Granite 60 HP 11.07.11 2.09.11 Job18 M/s Vijay Shree Granite 149 HP 12.07.11 2.09.11 Job19 M/s Natraj Industries
25HP - 60HP
18.04.11 23.08.11 Job
20 M/s Om Shiv Granite60HP - 120 HP
31.03.11 30.06.11 Job
21 M/s Choudhary Brothers
60HP - 120 HP
19.04.11 13.07.11 Job
22 M/sJai Guru Dev Industries
60HP - 150 HP
30.05.11 8.09.11 Job
23 M/s Dig Vijay granite60HP - 120 HP
06.06.11 12.08.11 Job
24 M/s Gaja Nand granite60HP - 149 HP
06.07.11 - Job
25 M/s Shree Granite60HP - 125 HP
25.07.11 - Job
G:pending new
Details of delay in new/load extension application of MIP & HT category
Information as on 15.09.11Jodhpur Zone, SE(O&M), Pali
S.No.
Name of Consumer Applied Load
Dt. of Appl.
Dt of DN Dt of SCO
Remarks
1 M/s Shiv Agrico, Rani
250 HP 03.05.10 03.09.10 Job
2 M/s Varun Ind 16.825 MW 15.02.11 PPM to TCC
3 M/s Sidhi Vinayak Cement, Jaitaran
1500 KVA 28.05.11 PPM
4 M/s Puran Prakash, Pali
59 to 85 HP 13.04.11 06.07.11
5 M/s Sharda Udhyog, Pali
1350 to 1485 HP
06.09.10 PPM
6 M/s Parswanath Ent 56 to 95 HP 18.05.117 M/s Vikas Heena 59 to 70 HP 03.01.11 05.03.11 03.08.11 Trf req
M/s. Anamika 22to100 HP 06.07.11
Details of delay in new/load extension application of MIP & HT category Information as on 15.09.11
Jodhpur Zone, SE(O&M), Jaisalmer
S.No. Name of Consumer Applied Load
Dt. of Appl
Dt of DN
Dt of SCO Remarks
1 Mishri khan/Valia khan
149 06.06.11No construct of meter room
2M/s Resopower
40 10.06.11 30.08.11Under Grace period
3 M/s Rajasthan solar urja 100 14.06.11 30.08.11
Under Grace period
4 M/s Rajlaxmi Minrals 59 22.07.11
Under estimate
5Lakh Singh Bhati
59 02.08.11Under estimate
6Shivkumar/Ramanlal,
59 07.06.11Under estimate
7 Kohinoor 106 to 166 04.06.10 30.12.10
Work in Progress
8 Madhvi Stone59 to 150 15.07.11
Under Estimate
9 Raj West 4Nos Long pending
G:pending new
Details of delay in new/load extension application of MIP & HT category
Information as on 15.09.11Jodhpur Zone, SE(O&M), Sirohi
S.No.
Name of Consumer Applied Load
Dt. of Appl.
Dt of DN Dt of SCO
Remarks
1 M/s Panchsil Globe, Abu Road
10 MW 14.09.10 PPM to TCC
2 M/s J.B.Licene Steel, Abu Road
25 MW 14.09.10 PPM to TCC
3 M/s Shiv Jyoti P Ltd. 22 HP to 400KVA
18.04.11 Under Sanction
4 M/s Shiv Marbles, Reodar
59 to 150 HP
11.03.11 16.06.11 Job
5 M/s Jayanti lal Umedram
59HP22-03-11
16-06-2011
Work under progress
6 M/s Hema Dhanna Choudhary
59 HP15-12-10
03-03-2011
Pannel box req
G:pending new
Details of delay in new/load extension application of MIP & HT category Information as on 15.09.11
Jodhpur Zone, SE(O&M), Barmer
S.No. Name of Consumer Applied Load
Dt. of Appl.
Dt of DN
Dt of SCO
Remarks
1 Sh. Satiyay Mata Mills, 4th Phase Balotra 260 01.06.11
constrction work not completed
2 M/s Malleshawar Industries LTD BLT 230 30.06.11 Under Estimate
3 M/s. Alka Stone , Village- Deora 150 HP 01.02.11 29.04.11
Job
4 M/s. Rishabbh Granite, Village - Deora 150 HP 01.02.11 29.04.11
Job
5 M/s. Fateh Granit, Village - Deora 150 HP 01.02.11 29.04.11
Job
6 Sh. Jagdish Prashad / Sultana Ram 150 HP 01.02.11 29.04.11
Job
7 Sh. Vickaram ji / Daya ram / Village- Deora 150 HP 01.02.11 29.04.11
Job
8 Sh. Kailash / Bhanwar Singh Village Deora 150 HP 01.02.11 29.04.11
Job
9 M/s. Fateh Granit, Village - Deora 150 HP 01.02.11 29.04.11
Job
10 Sh. Devendra / Bhagirath Village 150 HP 01.02.11 29.04.11
Job
11 Mahadev minerals 40 to 85 18.04.10 02.02.11 Transf. not provid12 Tapriya Khanij Udhyog 80 23.02.11 29.04.11 JIR Pending13 Tapriya Plaster Kawas 80 01.02.11 29.04.11 JIR Pending14 Mahadev Stone Cuttin 59 21.06.11 09.08.11 DN Awaited15 Valkoo Jaisalmer Road 59 to
14907.01.11 Under objection
16 Raj west Pwt ltd Shivkar Road
4 MVA16.11.10 08.08.11
G:pending new
Details of delay in new/load extension application of MIP & HT categoryInformation as on 15.09.11
Bikaner Zone, SE(O&M), BikanerS.No.
Name of Consumer Applied Load
Dt. of App Dt of DN Dt of SCO Remarks
1 Oaisis Indi. Beechwal 86-22025.1.11 1.8.11
Own Trs. Not installed
2 Agarwal Packaging, KIA 50-80 3.5.11 16.8.11D.N. Amount not deposited
3 National Ind.KIA 20-110 16.5.11 16.8.11Work under Progress
4 J.K. Industires KIA 35-59 26.5.11 16.8.11Work under Progress
5 Maheswari ind. Napasar 37-55 30.4.11 13.7.11 Completed
6Prem Bhujiya Bhandar 25-50 7.1.11 12.7.11
L form not received
7S.K. Ind. KIA 10-35 10.1.11 12.7.11
L form under Checking
8 Karani Food Product KIA BKN 25-55 15.2.11 3.8.11
L Form under Checking
9Syam Sweet KIA BKN 25-35 24.2.11 3.8.11
D.N. Amount not deposited
10 Sarad Repakers KIA BKN 15-40 30.6.11
Under sanction
11Keshav Ind KIA BKN 3-59 23.6.11
Under sanction
12 Mahavir Chemical & Mineral, Sobhasar 59-80 26.10.10
Under sanction
13 Godara Plaster Ind. Sobhasar 59-85 21.10.10
Under sanction
14 Anant Plaster, Sobhasar 60-80 11.2.11 Under sanction
15 Dewal Ind. Sobhasar 59-85 24.5.11 Under sanction
16 Balaji Agro Cold Ind. Sobhasar 75-95 20.8.10 15.12.10
Notice issued for Transformer
17 Prince Packegers Nal Badi 25-40 31.5.11
Under Sanction
18 Super Plaster, Sobhasar 25-75 6.6.11 Under Sanction
19 Gaytri Plaster, Sobhasar 25.85 15.7.11 Under Sanction
20Pawan Polytex 125-250 27.7.11 12.8.11
Own Trs. Not installed
21 Vishwakarma Ind. Nokha 59-150 22.7.11
Under Objection
22 Welcome Oxizen Ind. Salasar
325 15.3.11 21.7.11Work under progress
23 Anpurna Ind. Gadwala 400 12.7.10 9.6.11DN Amount not deposited
24 Balaji Mines & Const. Roda
59 4.5.11 Under Objection
25 Bhagirath/Moda Ram, Napasar
37.5 19.5.11 Land conversion notice
26 M/s Jai Jawala Plaster, Jaimalsar
7531.5.11 30.8.11
Work under progress
27 M/s Siyag Plaster, Sobhasar
85 14.6.11 Construction is not ready
G:pending new
Details of delay in new/load extension application of MIP & HT category Information as on 15.09.11
Bikaner Zone, SE(O&M), SriganganagarS.No. Name of
ConsumerApplied Load
Dt. of Application
Dt of DN Dt of SCO
Remarks
1Dhingra Flour & Oil Mill
40 HP to 150 HP 125KVA
24.06.11 19.09.11
2Rajesh Kr / Harbans lal
22 HP to 55 HP
01.03.11 14.06.1109.08.11
Sent to M&P for Releasing
3 Gurmel Singh/Jagir singh
20 HP to 80 HP
27.12.10 25.07.11
4 Prem Kr / Prabhu Dayal
59 HP 08.07.11
5Pawan Industries
25 HP to 50 HP
16.06.11 15.09.11
6 Shivam Plaster Udyog
59 HP 05.07.11
Details of delay in new/load extension application of MIP & HT category
Information as on 15.09.11Bikaner Zone, SE(O&M), Churu
S.No.
Name of Consumer Applied Load
Dt. of Appl.
Dt of DN Dt of SCO
Remarks
1 M/sXEN(PHED), Ratangarh
2500 HP 27.02.11 Under sanction
2 M/s Ganesh Repairing, Ladnun
44 to 132HP
02.03.11 22.07.11 Job
3 M/s Laxmi Crusher Udhyog, Sujangarh
120 to 250 HP
30.03.11 31.07.11 Under sanction
4 M/s Ganga Crusher, Ladnun
120 to 220 HP
15.12.10 22.07.11 Under Estimate
5 M/s Pawan Crusher, Sarothia
140 to 200 HP
11.05.11 06.07.11 Under Estimate
6 M/s XEN(PHED), Sardarsahar
1900 to 4000KVA
29.02.11
Bikaner Zone, SE(O&M), Hanumangarh
Nil
G:pending new
Urgent by Fax
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,…………………….
Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.
Ref: This office letter No.1014 dtd 15.06.11
On the subject captioned above and this office letter under reference, vide which you were requested to send the status of pending HT & MIP category new connection & load extention applications by 5 th (detail as on end of previous month) & 20th (detail as on 15th of each month) day of each month.
The desired information as on 15.08.11 has not been received till date, as such you are again requested to kindly arrange to send the same today itself, by fax(0291-5106366), for appraisal.
Kindly treat it as urgent.
(A.D.VYAS)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new
Urgent by FaxJODHPUR VIDHYUT VITRAN NIGAM LIMITED
OFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M/M&P),Jodhpur Discom,…………………….
Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.
Ref: This office letter No.1081 dtd.20-06-11, 1095 dtd.22-06-11, 1096 dtd.22-06-11, 1253 dtd 08.07.11.
On the subject captioned above and letters under reference, vide which you were requested to ensure for release of connections within specified time period and to send the names of officers/officials on whom part the delay has occurred.
While observing the information of pending MIP and HT categories, new and load extension applications, as on 15 th August, 2011, it has been noticed that in some cases demand note has not been issued even after lapse of more than 3-4months of deposition of files. Delay has also occurred in release of connections in so many cases. It has been gathered that sufficient number of LT CT & LT TVM’s are available with M&P wing. As such, you are requested to kindly look into the matter personally and arrange to get released the connections at the earliest. Further, it is again, requested to kindly intimate the names of officers/officials on whom part the delay has occurred. Any requirement related to metering equipment be send to the Superintending Engineer(M&P), Jodhpur under intimation to Superintending Engineer(MM&C), Jodhpur.
Kindly treat it as urgent.
(A.D.VYAS)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPURCopy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner, for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new
Urgent by Fax
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(M&P),Jodhpur Discom,Jodhpur
Sub.: Regarding detail of release of new & load extention applications for MIP & HT category.
On the subject captioned above, while observing the information of pending MIP and HT categories, new and load extension applications, as on 15 th
July, 2011, it has been noticed that delay has occurred in release of connections in so many cases.
As such, while enclosing the list of some such applications, where delay has occurred, you are, requested to kindly look into the matter personally and arrange to get released the connections at the earliest. Further, it is requested to kindly intimate the names of officers/officials on whom part the delay has occurred.
Kindly treat it as urgent.
Encl.:As above
(MOHAMMED IQBAL)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
G:pending new
Urgent by Fax
JODHPUR VIDHYUT VITRAN NIGAM LIMITEDOFFICE OF SUPERINTENDING ENGINEER (RA&C)
No. JdVVNL/MD/CE(HQ)/SE(RA&C)/Ju/S.AAE(C) /2k11-12/D. Dt.
The Superintending Engineer(CC/DC/O&M),Jodhpur Discom,…………………….
Sub.: Regarding detail of pending new & load extention applications for MIP & HT category.
Ref: This office letter No.1014 dtd 15.06.11
On the subject captioned above and this office letter under reference, vide which you were requested to send the status of pending HT & MIP category new connection & load extention applications by 5 th (detail as on end of previous month) & 20th (detail as on 15th of each month) day of each month.
The desired information as on 31.08.11 has not been received till date, as such you are again requested to kindly arrange to send the same today itself, by fax(0291-5106366), for appraisal.
Kindly treat it as urgent.
(A.D.VYAS)SUPERINTENDING ENGINEER(RA&C)
JODHPUR DISCOM, JODHPUR
Copy submitted to the Zonal Chief Engineer(O&M-JDZ/BKZ), Jodhpur Discom, Jodhpur/Bikaner for information and needful action.
SUPERINTENDING ENGINEER(RA&C)JODHPUR DISCOM, JODHPUR
G:pending new