Municipality of Patra

Planning for the City of Patra The evolution of the City Plan

SARDELIANOS Dimitris

Transport Engineer

Technical consultant of Mayor of Patra’ s

dsardel@gmail.gr

The first City Plan

City Plan by Voulgaris (1829)

End of 19 century - Major Projects

Developing of new Port (1881)

The main export port for the agricultural products

End of 19 century - Major Projects

The city plan by engineer

Tzetzos (1885)

Main North Train Station (1895)

Beginning of 20 century

Main immigration port

The Evolution of City Plan

1829 - 1882

The Evolution of City Plan

1885

The Evolution of City Plan

1903

The Evolution of City Plan

1929

The Evolution of City Plan

1971

The Evolution of City Plan

1972

The Evolution of City Plan

1975

The Evolution of City Plan

1979

The Evolution of City Plan

The First General Master Plan (1985)

The Evolution of City Plan

1987

The Evolution of City Plan

1988

The Evolution of City Plan

1989

The Evolution of City Plan

1992

The Evolution of City Plan

1993

The Evolution of City Plan

1995

The Evolution of City Plan

1999

The Evolution of City Plan

2th General Master Plan (2007)

The Railway

1985

The Yugoslavia War (1991)

1991

Proposals: New Port Development

1991

The Development of the New Port

2011

Proposals: Lowering the Railway constructing a underground train

1995

The Evolution of City Plan

General Master Plan (2010)

Suburban Railway

2011

Open Issues

Some things must be immediately clarified out

• The project on railroad network to the

south side of Peloponnisos must finalized

• An alternative, short business plan that will

be based upon this reality and that will solve

the problem of the connection between Rio-

Patras-New port, always compiled with the

operation of the suburban railway.

• Keeping in mind the high cost of lowering

the railroad constructing an underground

train, that the municipality of Patras - have

picked out from other technical solutions, is

important the preparation of a long

alternative plan,- in case of weakness in the

ensuring of financing.

• The suburban railway is a quiet successful

effort. Extent its operation

Final results

• The plan of a gradually development and upgrade of the modern

railway infrastructure and operation, for my opinion is realistic,

effective, and achievable.