partners in pisd future january 15, 2012

Post on 02-Jan-2016

24 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

DESCRIPTION

Partners in PISD Future January 15, 2012. Building Eagle Excellence. Culture of our Work. Appreciation (see listing) of participation Self accommodation (take care of your needs) Presentation/large and small group discussion Focus groups Packet contents - PowerPoint PPT Presentation

TRANSCRIPT

Building Eagle Excellence

Partners in PISD FutureJanuary 15, 2012

Culture of our Work

• Appreciation (see listing) of participation• Self accommodation (take care of your needs)• Presentation/large and small group discussion• Focus groups• Packet contents– Copies of powerpoint/data overviews– Additional data as requested

AGENDA

First Meeting• Overview

• Financial Status• Data Sources

• Areas of Focus - DRAFT

Second Meeting (tonight)• Bond Considerations/Impact• Tour Plan• Next Steps

Data Sources*

• Internal facility/technology needs assessment• Safety audit (M. Fletcher/team)• Financial audit • Internal resource review• External technology audit (Renaissance)• Demographer study (due – end of January)• Traffic flow engineering (TBD)

* copies available as needed

Areas of Focus

• Immediate Needs Assessment – Safety– Facility/learning environments

• Completion of QSCB• Training Facility (2 year Project) • Technology (TBD) – Campus Needs Assessments• Bond Considerations/Impact on Citizens

Facilities Review

New Elementary

Primary • Keyless entry• Canopy• Traffic Flow• K-1 PlaygroundNEW ElementaryIntermediate• Safe entry/admin move• Parking• Science/New Wing• Playground• Cosmetics/Rest RoomsJH• Science Rooms• Gym/Lockers• Cosmetics• Relocate bus pick-upFencing for all campuses Prek-8

Future HS EditionCareer Tech Center

High School

Training Center

Parking lot

Band Pad

Green space/ TBD

Pause and Reflect – Qs

What Next?* Review financial impact

2012 ISD Tax Rate ComparisonSimilar Size & Locale to Pleasanton ISD – Data from Texas ISD 2012 Tax Rate Survey

School District M & O Rate I & S Rate Total

Beeville ISD 1.04000 0.22553 1.26553*

Charlotte ISD 1.01000 0.17000 1.18000*

Cuero ISD 1.29000 0.03000 1.32000

Devine ISD 1.17000 0.21200 1.38200

Dilley ISD 1.11578 0.08475 1.20053*

Floresville ISD 1.04000 0.47580 1.51580

Jourdanton ISD 1.1221 0.00000 1.12210 **

La Vernia ISD 1.04000 0.35500 1.39500

Lytle ISD 1.17000 0.25000 1.42000

Medina Valley ISD 1.04000 0.38000 1.42000

Pearsall ISD 1.04000 0.17050 1.21050*

Pleasanton ISD 1.04000 0.09000 1.13000

Poteet ISD 1.04000 0.37900 1.41900

Somerset ISD 1.17000 0.10800 1.27800

Southside ISD 1.17000 0.19890 1.36890

Three Rivers ISD 1.00000 0.11720 1.11720

2012-2013 ISD Tax Rate ComparisonSimilar Size & Locale to Pleasanton ISD – Graph Format

BeevilleCharlotte

CueroDevine

DilleyFloresville

JourdantonLa Vernia

LytleMedina Valley

PearsallPleasanton

PoteetSomerset

SouthsideThree Rivers

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6

M & O RateI & S Rate

PLAN A

New Comprehensive High School• 1600 students/248,000 sq. ft (155 per student)• No Auditorium/includes practice fields/gyms, etc.

$54,500,000 (includes all FFE/Fees/Survey, Geo)• Does not include cost of land and road access

Renovated facilities• Primary• Pick up/Drop Off area; road construction• Playground/parking/Safety doors• Growth (6-8 classrooms)

$ 1,500,000 -$4,000,000 (classrooms)

• PIC/JH (serve elementary and PIC students)• Safety entrance/admin wing• 13,100 sq ft. addition (wing)/additional classrooms• Parking/Playground/Sports Court• Gym remodel/windows/roof• Cosmetics/Parent Drop off

$ 7,000,000.• HS (serve JH and potential PIC students)• Remodel/cosmetics (walls, locker, repurpose rooms)• Remove metal buildings/landscape/parking

$ 4,000,000

• Technology $ 2,500,000• Support Areas $ 4,500,000

• Maintenance relocation, buses, offset of stadium)Total: $ 74,000,000-

$76,500,000

PLAN B

New Elementary School• 1000 students/115,000 sq ft• Playground/sport court• Road development

$ 29,000,000(includes FFE/fees/survey/geo)

Renovated facilities• Primary• Pick up/Drop Off area; road construction• Playground/parking/Safety doors• Growth (6-8 classrooms)

$ 1,500,000 -$4,000,000 (classrooms)

• PIC • Safety entrance/admin wing• 13,100 sq ft. addition (wing)/additional classrooms• Parking/Playground/Sports Court• Cosmetics/Parent Drop off

$ 4,000,000.• JH• Safety entrance/admin wing/Science classrooms/windows• Cosmetics/Parent Drop Off $ 5,000,000.

• HS • Remodel/cosmetics (walls, locker, repurpose rooms)• Relocated Admin/Counseling; Covered pick-up• Career and Tech Center/Parking/Road

$ 23,000,000• Technology $ 2,500,000• Support Areas $ 4,500,000

• Maintenance relocation, buses, offset of stadium)

TOTAL: $ 69,500,000- $72,000,000

15% growth

8% growth

Taxpayer ImpactBond 2013

Property Categories

Property Values

Exemptions Net Value Current Tax Rate

Tax 30₵ Tax Rate Increase (Proposed)

New Tax Additional Tax Per Year

Additional Tax Per Month

1 Homestead 100,000150,000200,000300,000

15,000 15,000 15,000 15,000

85,000135,000185,000285,000

1.13 per 100 Value

960.50 1525.50 2090.50 3220.50

1.43 per 100Value

1215.501930.502645.504075.50

255.00 405.00 555.00 855.00

21.25 33.75 46.25 71.25

2 Homestead Over 65 Exemption

100,000150,000200,000300,000

15,000 15,000 15,000 15,000

85,000135,000185,000285,000

1.13 per 100 Value

960.501525.502090.503220.50

1.43 per 100 Value

960.501525.502090.503220.50

0 0 0 0

0 0 0 0

Business/ Commercial

250,000350,000450,000

0 0 0

250,000350,000450,000

1.13 per 100 Value

2825.003955.005085.00

1.43 per 100 Value

3575.005005.006435.00

750.001050.001350.00

62.50 87.50 112.50

Ag exemption consideration

1– Based on Current Values Remaining the Same From 12-13 to 13-142– Tax Bills are Frozen at the Time of Approval of Over 65 Exemption

2012-2013 ISD Tax Rate ComparisonSimilar Size & Locale to Pleasanton ISD – Graph Format

BeevilleCharlotte

CueroDevine

DilleyFloresville

JourdantonLa Vernia

LytleMedina Valley

PearsallPleasanton

PoteetSomerset

SouthsideThree Rivers

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6

M & O RateI & S Rate

Table Talk

• Plan A and Plan B review– Missing elements– Priority items (what could wait)– Perceived challenges

SummaryPartners Meeting (2)

• Questions for clarification

• Packet Review– Additional Partners?– Additional Data needs?

Next Steps:- Partners share

information and gather feedback

- Partners meet next week at ELEM (or send representative*)

- 3rd meeting focus on recommendations for Board of Trustees

THANK YOU……

this PARTNERship is essential to ensure future Pleasanton Eagles Soar!

top related