PANELISED AND MODULAR OFFSITE CONSTRUCTION

February 5th 2019

James Young BEng (Hons) CEng MIEIDirector of Engineering Services

Professional History

• Graduated from CIT June 2006

• 2006 – 2009 – Fusion Building Systems, Cork

• 2010 – 2011 – Momentum Builders, Melbourne

• 2011 – 2013 – Fine Design Engineers, Melbourne

• 2013 – Present – Evolusion Innovation

• 2014 – Registered Title of Chartered Engineer with Engineers Ireland

• 2015 – NHBC Stage 2 Light Steel Frame Third Party Certifier (UK)

05/02/2019Engineers Ireland Cork 2

Objective of Presentation

• Provide brief history of Offsite Construction in Ireland

• Outline technical aspects associated with panelsied offsite systems

• Outline technical aspects associated with modular construction

• Case Studies

• What is the potential for Modular Construction

05/02/2019Engineers Ireland Cork 3

Why Evolusion Innovation

• We are Irish and UK leaders as Independent Turn Key Offsite Consultancy

• Evolusion to date have worked on Offsite projects to a value in excess of €2bn

• The Evolusion team has a proven track record in delivering Rapid Build projects and can provide the expertise with regard structural design consultancy for any Offsite system

• Evolusion have been advising some of the best known construction industry leaders in Offsite Construction in recent times

• Key staff nationally and internationally recognised as leading experts

05/02/2019Engineers Ireland Cork 4

OUR MISSION“To promote Offsite to the industry and the general public, and to

ensure that Offsite is of the highest quality and complies with, and/or surpasses, all Building Regulation requirements and standards.”

5

Offsite QS experts

BIM estimating

Project feasibility assessments

Value Engineering

Control costs

U and y-value calcs

Condensation risk calcs

BREEAM

Thermal/Dynamic

modelling

SAP/SBEM

DEAP/BER

Auditing and Inspection

FPC plans

CE Marking

DoPs

Third-party certification

Innovative product

development

Fire, acousric testing

Offsite Specialists

LGS Design

Modular & Panellised

Chartered Engineers

Our services

Structural Engineering

Building Physics

Quantity Surveying

Quality Engineering

Product Development

605/02/2019Engineers Ireland Cork

Structural Engineering

Building Physics

Quantity Surveying

Quality Engineering

Product Development

Auditing and Inspection

FPC plans

CE Marking

DoPs

Offsite QS experts

BIM estimating

Project feasibility assessments

Value Engineering

Control costs

Third-party

certification

Innovative product

development

Fire, acoustic testing

Offsite Specialists

LGS Design

Modular & Panellised

Chartered Engineers

U and y-value calcs

Condensation risk calcs

BREEAM

Thermal/Dynamic

modelling

SAP/SBEM

DEAP/BER

Our services

705/02/2019Engineers Ireland Cork

Structural Engineering

Building Physics

Quantity Surveying

Quality Engineering

Product Development

Auditing and Inspection

FPC plans

CE Marking

DoPs

Offsite QS experts

BIM estimating

Project feasibility assessments

Value Engineering

Control costs

Third-party

certification

Innovative product

development

Fire, acoustic testing

Offsite Specialists

LGS Design

Modular & Panellised

Chartered Engineers

U and y-value calcs

Condensation risk calcs

BREEAM

Thermal/Dynamic

modelling

SAP/SBEM

DEAP/BER

Our services

805/02/2019Engineers Ireland Cork

05/02/2019Engineers Ireland Cork 9

When I say Offsite…..

05/02/2019Engineers Ireland Cork 10

05/02/2019Engineers Ireland Cork 11

History of Offsite Construction in Ireland

Engineers Ireland Cork 2/5/2019 12

05/02/2019Engineers Ireland Cork 13

Panelised Construction – Cork (2007)

Modular Construction – Dublin (2008)

05/02/2019Engineers Ireland Cork 14

Offsite Systems in Ireland

05/02/2019Engineers Ireland Cork 15

Timber Frame

Light Gauge Steel Frame

Precast Concrete

Lightweight Modular Systems

HRS Modular Systems with Concrete Slab

Innovative Foundation Systems

Offsite Systems in Ireland

05/02/2019Engineers Ireland Cork 16

Timber Frame

Light Gauge Steel Frame

Precast Concrete

Lightweight Modular Systems

HRS Modular Systems with Concrete Slab

Innovative Foundation Systems

Light Gauge Steel

05/02/2019Engineers Ireland Cork 17

Also known as:

• Cold Formed Steel

• Light Steel Framing

• Light Gauge Steel Framing

• Loadbearing SFS

Advantages of LGS

05/02/2019Engineers Ireland Cork 18

• LGS has high strength to weight ratio

• Does not shrink or creep.

• Flexibility – can be used with steel joist floor or concrete composite deck floor

options.

• Can be designed to accommodate HRS beams and columns to deal with the

transfer of heavy loads.

• Lightweight system –can reduce the dead weight loading when built from a

transfer slab by up to 40%, up to 25% with Concrete Slabs

• Can accommodate multi level concrete slabs

• Currently systems certified up to 10 stories or 30m available in Ireland

05/02/2019Engineers Ireland Cork 19

05/02/2019Engineers Ireland Cork 20

Panelised System Providers in Ireland

05/02/2019Engineers Ireland Cork 21

NSAI Certified• Vision Built

NSAI Certification in Process

• Horizon Offsite• Carlow Concrete• Metal Frame Construction

Manufacture

05/02/2019Engineers Ireland Cork 22

Section Sizes

05/02/2019Engineers Ireland Cork 23

Typical Stud SizesH = 70mm – 150mmB1/B2 = 25mm – 75mmC = 0mm – 25mmT = 0.55mm – 5mm

Typical Joist SizesH = 100mm – 450mmB1/B2 = 25mm – 150mmC = 0mm – 25mmT = 1mm – 5mm

05/02/2019Engineers Ireland Cork 24

Beams (HRS or LGS Truss)

Internal Wall

External Wall

Party Wall

05/02/2019Engineers Ireland Cork 26

05/02/2019Engineers Ireland Cork 27

05/02/2019Engineers Ireland Cork 28

05/02/2019Engineers Ireland Cork 29

05/02/2019Engineers Ireland Cork 30

Panelised Case Studies

Engineers Ireland Cork 2/5/2019 31

Student Accommodation

05/02/2019Engineers Ireland Cork 32

Architects Model

05/02/2019Engineers Ireland Cork 33

05/02/2019Engineers Ireland Cork 34

Offsite BIM Model

05/02/2019Engineers Ireland Cork 35

Manufacturing Model

05/02/2019Engineers Ireland Cork 36

Finished Product

05/02/2019Engineers Ireland Cork 37

Residential

05/02/2019Engineers Ireland Cork 38

Architectural Revit Model

05/02/2019Engineers Ireland Cork 39

05/02/2019Engineers Ireland Cork 40

Panelised Revit Model

05/02/2019Engineers Ireland Cork 41

Manufacturing Model

05/02/2019Engineers Ireland Cork 42

05/02/2019Engineers Ireland Cork 43

Site Construction

Typical Completed Hotel

High Rise Residential

05/02/2019Engineers Ireland Cork 46

05/02/2019Engineers Ireland Cork 47

05/02/2019Engineers Ireland Cork 48

8 Storey Hotel

05/02/2019Engineers Ireland Cork 49

05/02/2019Engineers Ireland Cork 50

05/02/2019Engineers Ireland Cork 51

05/02/2019Engineers Ireland Cork 52

Modular Systems

05/02/2019Engineers Ireland Cork 53

Also known as:

• Volumetric

• Pods

Certified Modular System Providers in Ireland

05/02/2019Engineers Ireland Cork 54

NSAI Certified

• Modern Homes Ireland• 3 Storey System• (10 storey System Published Soon)

• Extraspace Solutions• Up to four stories

Uniformly Loaded Modular Structure

Engineers Ireland Cork 2/5/2019 55

LGS Uniformly Loaded Modules

05/02/2019Engineers Ireland Cork 56

05/02/2019Engineers Ireland Cork 57

05/02/2019Engineers Ireland Cork 58

05/02/2019Engineers Ireland Cork 59

05/02/2019Engineers Ireland Cork 60

Corner Supported Modular Structure

Engineers Ireland Cork 2/5/2019 61

4 Storey Primary School

05/02/2019Engineers Ireland Cork 62

TYPICAL FLOOR

PLAN

05/02/2019Engineers Ireland Cork 64

Disproportionate Collapse

05/02/2019Engineers Ireland Cork 65

05/02/2019Engineers Ireland Cork 66

05/02/2019Engineers Ireland Cork 67

05/02/2019Engineers Ireland Cork 68

05/02/2019Engineers Ireland Cork 69

05/02/2019Engineers Ireland Cork 70

05/02/2019Engineers Ireland Cork 71

Health Care

05/02/2019Engineers Ireland Cork 72

05/02/2019Engineers Ireland Cork 73

05/02/2019Engineers Ireland Cork 74

Other Design Considerations

05/02/2019Engineers Ireland Cork 75

NZEB will apply to All New Buildings

05/02/2019Engineers Ireland Cork 76

• 31st December 2020 – All new buildings Nearly Zero Energy

Building.

• 31st December 2018 – All buildings acquired by public bodies

Nearly Zero Energy Building.

• All buildings completed after these dates must have this

requirement.

• A certificate of compliance with Building regulations could

not be signed on 1st January 2021, unless it meets the NZEB

standard, and the building could not be occupied.

05/02/2019Engineers Ireland Cork 77

05/02/2019Engineers Ireland Cork 78

Energy efficiency:Fabric first approach

• Important to highlight the Fabric-First approach

• Particularly from a Thermal Bridging perspective

• Dynamic Simulation Modelling

79

Fire Testing:Loaded Walls

• Loaded walls tested to EN 1365-1/BS 476-21:1987

• Internal load bearing walls and external load bearing walls

• NB

• Adequate detailing of services in walls

• The importance of load

80

Fire testing:Loaded Floors EN 1365-2

81

STRUCTURAL FLOORS/COMPARTMENT

FLOORS

VERTICAL PENETRATIONS ALLOWED FROM CEILING TO FLOOR PROVIDED IT IS ADEQUATLEY FIRE STOPPED WITH APPROPRIATE TESTED PRODUCT

BS 8414 Testing on Building over 18 meters

• If your system is not minimum class A2 then you must have a system specific test

82

• Critically important to carry out lab testing at product development stage.

• Walls and Floors

• Airborne Sound:

• Impact sound

• Our policy is to design Offsite products for residential use that can achieve a minimum of 5dB better than building regulations on site during post completion testing.

83

Acoustic performance of systems and elements

Weather Testing of External Cladding

• CWCT Standard for systemised building Envelopes

• Air permeability

• Wind resistance

• Water penetration

• Water resistance

• Static test method

• Dynamic test method

84

Evolusion project manage

all types of tests

8505/02/2019Engineers Ireland Cork

The Future

2/5/2019 Engineers Ireland Cork 86

05/02/2019Engineers Ireland Cork 87

Chapter Living, Lewisham

Core & Podium concrete works

Module install – 2 floors per week

Parallel External & Internal Workstreams

H&S – incident/accident free

Planning Consent Nov 15 Module Start Jan 16 Practical Completion Aug16

Fully Occupied Sep16Module Finish April 16Start RC Works Dec 15

88

05/02/2019 89Engineers Ireland Cork

YouTube video link: https://www.youtube.com/watch?v=XZ-yUedPDZc