OpenStack in action 2! Production ready - 31/05/2012 "Behind the scenes of the 1st European OpenStack Cloud" by Raphaël Ferreira, CEO, eNovance

TRANSCRIPT

1

Behind the scenes of the first OpenStack Public Cloud...

POWERED BY

Raphaël Ferreira, CEO

jeudi 31 mai 12

2

175 INVOLVED3000companies

people

jeudi 31 mai 12

3

• Top 10 largest contributor in the code

• UpStream Debian OpenStack

• Integration Puppet / OpenStack

• Project leader Metering/Accounting/Billing

175 INVOLVED3000companies

people

jeudi 31 mai 12

4

175 INVOLVED3000companies

people

official OpenStack deployment partner for :

jeudi 31 mai 12

5

Objectives

jeudi 31 mai 12

6

Objectives

2

1

3

Use a 100% Open Source technology

5

4

7

6

Have full control over infrastructures and hardware

Ensure Compatibility with other Public Clouds

Based in France

Deliver a High-performance Cloudwith high-speed I/O

Enable Hybrid platforms on the same network

1 Cloud = 2 service levels: fully independant or fully managed

jeudi 31 mai 12

7

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

jeudi 31 mai 12

7

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

jeudi 31 mai 12

8

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

jeudi 31 mai 12

8

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

eNoCloud Beta 1Diablo Release

jeudi 31 mai 12

9

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

jeudi 31 mai 12

9

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

60 companies

involved

jeudi 31 mai 12

10

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

jeudi 31 mai 12

10

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

eNoCloud Beta 2Essex Release

jeudi 31 mai 12

11

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

jeudi 31 mai 12

11

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

120 companies

involved

jeudi 31 mai 12

12

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

jeudi 31 mai 12

12

Sept Déc

Opening Beta 1Diablo Release

60 companies involved

Fév

Opening Beta 2Essex Release

Mars

120 companies involved

2011 2012

Mai

From project to reality...

Production ready !

June

Start BuildeNocloud

jeudi 31 mai 12

13

Features

jeudi 31 mai 12

14

Essex Release

Compute

deploy Scalable Virtual Servers on Demand

Object Storage

scalable, reliable online storage on demand

Image Service

OS & applications catalog - ready to deploy

jeudi 31 mai 12

15

Compute

On-Demand Instances

Elastic Scalability

No lock-in

Open Standards

High performance Cloud

Accessible anywhere

Secure

Deploy scalable services on-demand

Hybrid Ready

jeudi 31 mai 12

16

Deploy scalable services on-demandCompute

jeudi 31 mai 12

17

Object Storage

Scalable, reliable online storage on demandMassive storage capacity

Scalability on-demand

Fast and simple

Open Standards

No lock-in

Accessible anywhere

Reliable and Secure

jeudi 31 mai 12

18

Services Levels

100% Independant 100% Managed

Support through tickets only

Provision of Management tools

SLA on infrastructures

Managed services 24x7x365(maintenance on apps & hardware,backups,

monitoring...)

SLA on end-user experience

Infrastructure design, integration

jeudi 31 mai 12

19

• 2 Datacenters Tiers III and Tiers IV• 4Gb Black Fiber channel• Multi-provider Network (BGP)• Global Loadbalancing• Multi-datacenter platform• SLA : 99,99%

Infrastructures-2

-1

(under construction)

jeudi 31 mai 12

20

Pricing

Instance type RAM(GB)Virtual cores

Local Disk (GB)

Price €/hrLinux

Tiny

Small

Medium

Large

XLarge

XXLarge

1

2

4

8

16

32

1

1

2

4

4

8

20

40

80

160

320

320

0,07

0,12

0,22

0,40

0,75

1,40

0,10

0,15

0,28

0,52

0,87

1,66

Price €/hrWindows

jeudi 31 mai 12

21

Pricing

Bandwidth

IN Free

Price €/GB/month

OUT 0,15

Storage Tier

non-active eNocloud instances 0,30

Price €/GB/month

jeudi 31 mai 12

22

• eNocloud-II Paris• eNocloud-III Montreal• eNoCloud Block Storage• Live Metering• Auto-Scalling• PaaS services

Next Steps

jeudi 31 mai 12

23

First multi-cloud Market Place for OpenStack & AWS

eNocloud Market Place

jeudi 31 mai 12

23

jeudi 31 mai 12

23

Exclusive Beta Program

http://marketplace.enovance.com

jeudi 31 mai 12

24

Try It !

www. .com

jeudi 31 mai 12

25

Testimonials

jeudi 31 mai 12

26

Cloud testing for: •Major international event•Simulation of 1 M virtual users

1 million users

+

The eNocloud platform was the perfect complement to our Global Cloud...the flexibility in configurations, the fast access to the servers and eNovance’s expertise made this project a real success»Fred BeringerVP Business Development Europe, SOASTA

jeudi 31 mai 12

27

Map Reduce for :•Big Data•Satellite images analysis

+

The Centre National d’Etudes Spatiales (CNES) is the government agency responsible for shaping and implementing France’s space policy in Europe.

jeudi 31 mai 12

28

+Stéphane Rios

CEO of FasterizeEx-CTO of Rue du Commerce

Real time optimization of Web site loading time

jeudi 31 mai 12

28

+Stéphane Rios

CEO of FasterizeEx-CTO of Rue du Commerce

Real time optimization of Web site loading time

Before

jeudi 31 mai 12

28

+Stéphane Rios

CEO of FasterizeEx-CTO of Rue du Commerce

Real time optimization of Web site loading time

After

jeudi 31 mai 12

29

+Stéphane Rios

CEO of FasterizeEx-CTO of Rue du Commerce

• Requirements

• Automated deployement of code *AND* infrastructure

• cloud agnostic

• multiple environments (dev, integration, staging, etc ...)

• scalability (in & out)

• highly fault-tolerant and distributed platform

• First build on Rackspace public cloud (integration, staging, production)

• support Openstack

• London based (latency)

• Second build on bare-metal servers (production)

Implementation

jeudi 31 mai 12

30

+Stéphane Rios

CEO of FasterizeEx-CTO of Rue du Commerce

• Our target : our own private cloud

• The only Openstack-based IAAS provider available on the french market

• Highly skilled people

• Openstack contributor

• 24/7 support & managed hosts

• Ability to use beta releases of Openstack (Essex) for tests

Why eNovance ?

jeudi 31 mai 12

31

+Stéphane Rios

CEO of FasterizeEx-CTO of Rue du Commerce

Tests

• Built on 2 private servers

• ~ 15 VMs , 48 cores, 192 GB RAM, some TB of disks

• easy deploy with Chef, Fog (ruby) and EC2 compliant API of openstack

• stack : NodeJS, 0mq, HAProxy, Nginx, Memcached, MongoDB, Splunk, ...

• Perf tests results

• no noticeable difference between bare-metal and Openstack from the engine point of view

• Next step : open a second production datacenter with eNovance

jeudi 31 mai 12

32

+ Graphs

jeudi 31 mai 12

33

Thank you!