OpenInfra

Data model and IFC

for

Infrastructure

Christophe Castaing (EGIS)

OSLO

Process room March 20th 2012

OpenInfra

• Egis is an engineering and consulting group active in infrastructure and systems for transport, development, industry, water, environment and energy.

• Egis also works in project management and road and airport operation.

• 11 000 people

• Subsidiary of the Caisse des Dépôts

OpenInfra Keys figures 2010

OpenInfra

Decisions:

OpenInfra as the right name

a steering committee

To work under Workshops on :

1. definition and dictionary

2. Scope

3. levels of definition

To investigate deeper on several topics: IFC Bridge, INSPIRE, etc..

•First IFC Infra meeting in Paris -8 july 2011

OpenInfra

Christophe Castaing EGIS International

Pierre Benning Bouygues TP

Henk Schaap GOBAR

André Borrmann TUM University

Leif Granholm

Kim Inhan

Yang Ji

Mark Palmer NIST

Nick Nisbet AEC3

Steen Sunesen

Väino Tarandi University

Jean-Baptiste valette VINCI

Eric Lebegue CSTB

Nobuyoshi Yabuki Osaka University

•Steering committee

OpenInfra

• Ontology TO dictionary

• Process map

• experimentation

– Levels of definition and domains

– Inspire compliance

OpenInfra

• Ontology to dictionary

OpenInfra

Infra

chainage Faune/

flores works

Safety

equipements

Start end

Road Ownership

Level of services Kind

coordinates protected

Migration

Way point kind dimension fences

basement

dimension

exemple for fencing or works

OpenInfra

Not only where

But why

Animals Types

Protection

Way point

Works Animals works

kind

chainage

dimensions

Safety equipements fences

Type

Height

Basement

colors

coordonates

Route Name

Type

Owner

Chainage

OpenInfra

• The scope:

Objects are

there

Why is

there

Dimensioning is there

OpenInfra

• Process map:

– One view developed by Andre/ Chuck:

• infrastructure_process_map(only design)_V2_Draft.pdf

– Compared to Communic one:

• ..\WS2011_1114\Communic_documentationl.pdf

– On a project :

• NRL_ process map simplified

• NRL_ process map

OpenInfra

• The project

OpenInfra

• Process map:

– Out put and deliverables :

• Exchange Requirements and business Rules

• Exchange requirements model

• As a first step for a generic BIM guide for Infra

• Catalogue

– The goal:

• To be able to focalise on the object to be built

OpenInfra

• The experimentation:

– Levels of definition

– INSPIRE connection

OpenInfra

INFRA – Level 1

Functions

Building Building Motorway CH0-CH99

Building Building

Concerned Networks

Road

River

High Voltage

Connections with existing

Services (Rest area, Toll plaza…)

Operation syst. (Equipments)

Restoring

Project

FUN

CTI

ON

S

Including

Syst

ems

Building Building

DTM

Building Building

Underground

Analysis Simulations Schedule QTO …

Including

OpenInfra

INFRA – Level 1

Functions

Motorway CH0-CH99

Underground

Project

FUN

CTI

ON

S Sy

stem

s

DTM

Concerned

Networks

Analysis Simulations Schedule QTO …

Road

River

High Voltage

Syst

ems

TOLL PLAZA

INTERCHANGE

SERVICES AREA

OpenInfra Level 2

Disciplines/Domains

Buildin

g Buildin

g Function

Buildin

g Buildin

g Geometric

Model

Bridge

Tunnel

Earthworks

Hydraulic works

Project

DIS

CIP

LIN

ES

Syst

ems

Analysis Simulations Schedule QTO …

OpenInfra

INFRA – Level 2

Disciplines/Domains

Building Building

motorway

Buildin

g Buildin

g Geometric

Model

Project

DIS

CIP

LIN

ES

Syst

ems

Analysis Simulations Schedule QTO …

pavement

Toll system

Earthworks

Hydraulic works/drainage

OpenInfra Several way to display (1)

OpenInfra

1/100000

1/25000 to 1/5000 IN

SP

IR

E

1/1000 to 1/50

OpenInfra

INSPIRE

Hyd

ro

lo

gie

se

au

x d

e T

ra

nsp

ort

Ca

da

stre

Op

en

Infra

OpenInfra

• IFC Bridge/ tunnels /keys issues:

– Create group to review the ifc-bridge and ifc-tunnel models and create a synthesis.

– Invite buildingsmart MSG to review this synthesis and indicate a cost of integration.

– Seek sponsorship for the work.

OpenInfra

• INSPIRE and IFC key issues:

– A catalogue

– Objects, data and metadata

– Compliant with level1 and level2 COmmunic levels of definition

– A technical opportunity

– To investigate on IFC/INSPIRE compliance and quick experimentation

OpenInfra

• The key words:

•The full lifecycle management (PLM & PDM)

•The Information Modeling (BIM to Infra IM)

•Communication and sharing

•nD mock-up ( rather than 3D )

OpenInfra Open Information Environment

Coordination Management

Disciplines

Information Model

Exchange bridge

CO

MM

UN

IC

Op

en I

nfo

rmat

ion

En

viro

nm

ent

Collaborative Exchange Platform

OpenInfra OpenInfra

• Within:

•to develop the BIM concepts for infrastructures

•to gather the works already done on this topic

•to create an international professional community and network to

support the project on the long term.

OpenInfra A geometry as a result

OpenInfra

OpenInfra