New Orleans East Levee

28

Bayou SauvageNational Wildlife

Refuge

29

New Orleans East

Surge Barrier Tie-In Old

Floodwall

New Floodwall

New Orleans EastTie-In Floodwall

30

31

Conceptual

Seabrook Surge Barrier

Seabrook Surge Barrier

32

BUILDING STRONG®

Outfall Canal Pumps and Gates

33

• Pumping Capacity: 2,200 cfs

• 10 pumps fully installed and tested

• Pumping Capacity: 9,000 cfs

• 18 hydraulic pumps fully installed and tested

• 11 direct drive pumps fully installed and tested

• 14 portable pumps

17th St. Canal Orleans Ave. Canal London Ave. Canal

• Pumping Capacity: 5,000 cfs

• 12 hydraulic pumps fully installed and tested

• 8 direct drive pumps fully installed and tested

West Closure Complex

West Closure Complex

The WCC removed 26 miles of levees and floodwalls from the first line of defense

35

36

WCC Sector Gate Delivery

West Closure ComplexSector Gate Installation

37

West Closure ComplexSector Gate Installation

38

BUILDING STRONG®

West Closure ComplexPump Station

11 vertical pumps► 1,740 cfs per pump

11 diesel engines► 5,400 HP each

4 backup generators►Climber screens►Sector gates►Controls

39

Repair $102.7 M Program

Repairs for all 61 pump stations are complete.

Motor at Orleans Drive Pump Station Vertical Drive Pump – Elaine Pump Station

Pump Station Repairs

40

Pump Station Storm Proofing

41

Contract Status

Orleans Parish

JeffersonParish

TOTAL 18 16

In Design 1 2

Awarded 7 8

Complete 2 3

Pending 8 2

42

Bayou Segnette Pump StationCompleted Safe House

SELA Interior Drainage

43

Contract Status

Orleans Parish

JeffersonParish

TOTAL 11 24

In Design 9 14

Awarded 2 10

Complete 0 9

BUILDING STRONG®

SELA Interior Drainage

44

BUILDING STRONG®45

In 2007, you had a 1% chance every year of flooding this deep from Hurricanes

Notes:• The depth map tool is a relative indicator of progress, over time, demonstrating risk

reduction as a function of construction progress • The water surface elevations are mean values• The scale sensitivity of the legend is +/- 2 feet• The info does not depict interior drainage modeling results• The storm surge is characterized as the result of a probabilistic analysis of 5 to 6 storm

parameters of a suite of 152 storms and not a particular event

Assumes 50% Pumping Capacity

March 08

BUILDING STRONG®46

With the 100-year level of protection, you have a 1% chance every year of flooding this deep from Hurricanes

Notes:• The depth map tool is a relative indicator of progress, over time, demonstrating risk

reduction as a function of construction progress • The water surface elevations are mean values• The scale sensitivity of the legend is +/- 2 feet• The info does not depict interior drainage modeling results• The storm surge is characterized as the result of a probabilistic analysis of 5 to 6 storm

parameters of a suite of 152 storms and not a particular event

Assumes 50% Pumping Capacity

March 08

BUILDING STRONG®

With the 100-year level of protection, you have a 0.2% chance every year of flooding this deep from Hurricanes

Notes:• The depth map tool is a relative indicator of progress, over time, demonstrating risk

reduction as a function of construction progress • The water surface elevations are mean values• The scale sensitivity of the legend is +/- 2 feet• The info does not depict interior drainage modeling results• The storm surge is characterized as the result of a probabilistic analysis of 5 to 6 storm

parameters of a suite of 152 storms and not a particular event

Assumes 50% Pumping Capacity

March 08

BUILDING STRONG®48

Buying Down Risk

Risk

Initial Risk

Zoning / Building Codes

Coastal Protection and Restoration

Outreach

Evacuation Plan

Insurance

Levees / Floodwalls / Structures

Residual Risk

Doing Business with the Corps

14 Steps for Vendors:http://www.mvn.usace.army.mil/ebs/cont_doingbiz.asp

Federal Business Opportunitieshttps://www.fbo.gov/

49

BUILDING STRONG®

Upcoming Contracts

50

Contract Description $$ Range Award Date

OSP-03 Orleans Storm Proofing – CWT & PP Water Perimeter Protection $5-25 M April 2011

OSP-05 Orleans Storm Proofing – PS #5 – Two Pumps with Generator $5-25 M April 2011

PCCP-01 Outfall Canal Closures and Permanent Pumps $500 M - $1 B April 2011

OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July 2011

SELA-09 Pump to the River Pump Station $25-50 M August 2011

BUILDING STRONG®

Questions / Discussion

51

EGSA Meeting of Members Agenda

1. 1. Opening Comments2. 2. Reports from the Chairmen of the Association’s Standing

Committees on Board Recommendations discussed during the preceding afternoon.

3. 3. Old Business4. 4. New Business5. 5. Adjourn

Field Service Etiquette Panel

Moderated by Leo LeBlanc, Methane Power, Inc.

PanelistsBrad Bingert, Cummins Mid-South

Jim Cress, Ring Power CorporationJoe Hafich, Emergency Systems Service CompanyRick Morrison, Nixon Power Services Company

Jack Petro, ASCO Power TechnologiesBob Piske, Gen-Tech of Arizona

top related