New Orleans East Levee
28
Bayou SauvageNational Wildlife
Refuge
29
New Orleans East
Surge Barrier Tie-In Old
Floodwall
New Floodwall
New Orleans EastTie-In Floodwall
30
31
Conceptual
Seabrook Surge Barrier
Seabrook Surge Barrier
32
BUILDING STRONG®
Outfall Canal Pumps and Gates
33
• Pumping Capacity: 2,200 cfs
• 10 pumps fully installed and tested
• Pumping Capacity: 9,000 cfs
• 18 hydraulic pumps fully installed and tested
• 11 direct drive pumps fully installed and tested
• 14 portable pumps
17th St. Canal Orleans Ave. Canal London Ave. Canal
• Pumping Capacity: 5,000 cfs
• 12 hydraulic pumps fully installed and tested
• 8 direct drive pumps fully installed and tested
West Closure Complex
West Closure Complex
The WCC removed 26 miles of levees and floodwalls from the first line of defense
35
36
WCC Sector Gate Delivery
West Closure ComplexSector Gate Installation
37
West Closure ComplexSector Gate Installation
38
BUILDING STRONG®
West Closure ComplexPump Station
11 vertical pumps► 1,740 cfs per pump
11 diesel engines► 5,400 HP each
4 backup generators►Climber screens►Sector gates►Controls
39
Repair $102.7 M Program
Repairs for all 61 pump stations are complete.
Motor at Orleans Drive Pump Station Vertical Drive Pump – Elaine Pump Station
Pump Station Repairs
40
Pump Station Storm Proofing
41
Contract Status
Orleans Parish
JeffersonParish
TOTAL 18 16
In Design 1 2
Awarded 7 8
Complete 2 3
Pending 8 2
42
Bayou Segnette Pump StationCompleted Safe House
SELA Interior Drainage
43
Contract Status
Orleans Parish
JeffersonParish
TOTAL 11 24
In Design 9 14
Awarded 2 10
Complete 0 9
BUILDING STRONG®
SELA Interior Drainage
44
BUILDING STRONG®45
In 2007, you had a 1% chance every year of flooding this deep from Hurricanes
Notes:• The depth map tool is a relative indicator of progress, over time, demonstrating risk
reduction as a function of construction progress • The water surface elevations are mean values• The scale sensitivity of the legend is +/- 2 feet• The info does not depict interior drainage modeling results• The storm surge is characterized as the result of a probabilistic analysis of 5 to 6 storm
parameters of a suite of 152 storms and not a particular event
Assumes 50% Pumping Capacity
March 08
BUILDING STRONG®46
With the 100-year level of protection, you have a 1% chance every year of flooding this deep from Hurricanes
Notes:• The depth map tool is a relative indicator of progress, over time, demonstrating risk
reduction as a function of construction progress • The water surface elevations are mean values• The scale sensitivity of the legend is +/- 2 feet• The info does not depict interior drainage modeling results• The storm surge is characterized as the result of a probabilistic analysis of 5 to 6 storm
parameters of a suite of 152 storms and not a particular event
Assumes 50% Pumping Capacity
March 08
BUILDING STRONG®
With the 100-year level of protection, you have a 0.2% chance every year of flooding this deep from Hurricanes
Notes:• The depth map tool is a relative indicator of progress, over time, demonstrating risk
reduction as a function of construction progress • The water surface elevations are mean values• The scale sensitivity of the legend is +/- 2 feet• The info does not depict interior drainage modeling results• The storm surge is characterized as the result of a probabilistic analysis of 5 to 6 storm
parameters of a suite of 152 storms and not a particular event
Assumes 50% Pumping Capacity
March 08
BUILDING STRONG®48
Buying Down Risk
Risk
Initial Risk
Zoning / Building Codes
Coastal Protection and Restoration
Outreach
Evacuation Plan
Insurance
Levees / Floodwalls / Structures
Residual Risk
Doing Business with the Corps
14 Steps for Vendors:http://www.mvn.usace.army.mil/ebs/cont_doingbiz.asp
Federal Business Opportunitieshttps://www.fbo.gov/
49
BUILDING STRONG®
Upcoming Contracts
50
Contract Description $$ Range Award Date
OSP-03 Orleans Storm Proofing – CWT & PP Water Perimeter Protection $5-25 M April 2011
OSP-05 Orleans Storm Proofing – PS #5 – Two Pumps with Generator $5-25 M April 2011
PCCP-01 Outfall Canal Closures and Permanent Pumps $500 M - $1 B April 2011
OSP-02 Orleans Storm Proofing – 60 Hz Underground Feeder $1-5 M July 2011
SELA-09 Pump to the River Pump Station $25-50 M August 2011
BUILDING STRONG®
Questions / Discussion
51
EGSA Meeting of Members Agenda
1. 1. Opening Comments2. 2. Reports from the Chairmen of the Association’s Standing
Committees on Board Recommendations discussed during the preceding afternoon.
3. 3. Old Business4. 4. New Business5. 5. Adjourn
Field Service Etiquette Panel
Moderated by Leo LeBlanc, Methane Power, Inc.
PanelistsBrad Bingert, Cummins Mid-South
Jim Cress, Ring Power CorporationJoe Hafich, Emergency Systems Service CompanyRick Morrison, Nixon Power Services Company
Jack Petro, ASCO Power TechnologiesBob Piske, Gen-Tech of Arizona