moving forward

Post on 01-Jan-2016

16 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

C802.20-03/113. Moving Forward. Robert D.Love rdlove@ieee.org LAN Connect Consultants. Preparation for Jan Interim Mtg. Establish a vision for the 802.20 WG Establish project goals & schedule Begin work on the 802.20 draft Effective conflict resolution. 802.20 WG Vision. - PowerPoint PPT Presentation

TRANSCRIPT

November 13, 2003 IEEE802.20 Albuquerque Plenary Session

1

Moving Forward

Robert D.Love

rdlove@ieee.org

LAN Connect Consultants

C802.20-03/113

IEEE802.20 Albuquerque Plenary Session 2

Preparation for Jan Interim Mtg

Establish a vision for the 802.20 WG Establish project goals & schedule Begin work on the 802.20 draft Effective conflict resolution

IEEE802.20 Albuquerque Plenary Session 3

802.20 WG Vision

Individual Homework Assignment Define our market objectives Look out 5 to 7 years Project market requirements over time Establish requirements and time frame for

our first 802.20 standard Narrow scope of present project to first

release of our standard consistent with overall visions

802.20 WG Assignment Be prepared to limit capability of 1st

release

IEEE802.20 Albuquerque Plenary Session 4

Establish project goals & schedule

Complete Requirements document focused on project goals and schedule

Develop and vote on Project Schedule Establish goals for the January Mtg

• No other presentations or other business until goals are met

cutoff date for completing Rqmnts doc cutoff date for proposals cutoff date for choosing proposal

IEEE802.20 Albuquerque Plenary Session 5

Begin work on the 802.20 draft

Preapprove decisions made at Jan Interim meeting on progressing the project

Complete work on Evaluation Criteria Invite technical proposals and

supplement with slide presentations Detailed text defines the substance

of the proposal

IEEE802.20 Albuquerque Plenary Session 6

Effective conflict resolution

Most conflicts are a result of valid concerns that were not addressed

During Meetings After limited discussion take the concerns

offline and work together• When needed develop a joint resolution offline

and bring to WG or to reflector as resolved or as a clearly defined disagreement

On the reflector After a round of email responses get on the

phone or send a private email to interest group and work together to develop a joint resolution. Post that joint resolution to get additional input.

top related