Discussion on moving to the AMA Multi-Purpose Complex

Discussion on moving Scabiosastraat students to the West Wing of the AMA Multi-Purpose

Complex

Some thoughts

• If the high school students move to the west wing then the toilet in the courtyard might be used and this is not a wise idea with the ongoing construction.

• If the high school students move then the library, computers, telephones from Scabiosastraat will have to be moved.

• At this point there will not be enough space to accommodate the high school students and administration.

What if

Architectural floor plan for immediate renovations

• The high school students could remain at Scabiosastraat and instead spread out lower and middle schools students into the new classrooms.

• If the decision is made to leave the high school students here at Scabiosastraat to complete the 2011/2012 school year, then the lower middle school and some administrative staff could move into the designated areas.

Alternative plan

Discussion

Kitchen

OfficeOffice

Renovating Classrooms 26 and 27

Notes on the Floor Plan of the West Wing:

• Ms. Simone Griffith and Ms. Seneka Ishwardat classrooms are being renovated as of March 7th to 11th and class ready for March 12th, 2012.

• The floor will be raised

• Extending wall for Ms. Ishwardat classroom

• More space for a new for both Ms. Griffith and Ms. Ishwardat classrooms

• Making additional windows

• Redoing doors

Ms. Ishwardat Classroom before renovation

To be completed on Monday March 12th

Ms. Griffith Classroom before renovation

To be completed by Monday March 12th

Future Library

Classrooms in the short term

Another view of the Library

Outside the West Wing and the Library

Ongoing construction

Thoughts/Questions

Discussion

Firm decision

Thank You