massachusetts port authority...saam architecture massachusetts port authority east boston,...
Post on 28-Jul-2020
3 Views
Preview:
TRANSCRIPT
HANSCOM FIELD ARFF AND CBP BUILDING
MASSACHUSETTS PORT AUTHORITY
MASSACHUSETTS PORT AUTHORITY
HANSCOM AIR
FORCE BASE
HANSCOM AIR
FIELD
CIVIL AIR
TERMINAL
PROJECT
SITE
AIRFIELD
MAIN
ENTRY
95
AERIAL VIEW OF AIRFIELD
MASSACHUSETTS PORT AUTHORITY
SITE PLANAERIAL VIEW OF AIRFIELD
XX
X
XX
XX
saamarchitecture
MASSACHUSETTS PORT AUTHORITYEAST BOSTON, MASSACHUSETTS 02128
H260-1/HH-13718
655 Summer Street, Boston, MA 02210(216) 496-3647diana@saam-arch.comsaam-arch.com
SUBMISSION PACKAGE NUMBER
Civil
1" = 30'
PROJECT LOCATION:
MPA CONTRACT NO.: LOCATION CODE:
PROJECT SUBMISSION PHASE:
REGISTRATION STAMP:
KEY PLAN:
PRIMARY:
CONSULTANT:
PROJECT NUMBER AND TITLE:
SHEET TITLE:
DISCIPLINE:
DRAWN BY:
SCALE:
CHECKED BY: APPROVED BY:
DATE:
SHEET NUMBER:
N
Hanscom ARFF Facility/ US Customs& Border Protection FacilityBedford, Massachusetts
H260-D1Hanscom ARFF Facility/ US Customs& Border Protection Facility
Preliminary Sewer,Water, and Drainage Plan
JT
C300
REVISIONS
REV NO.: DATE: DESCRIPTION:
Sept. 22, 2017
DHS DHS
N
GREEN INTERNATIONAL
AFFILIATES, INC.
Civil and Structural Engineers
239 Littleton Rd, Suite 3
Westford, Massachusetts
GreenIntl.com
(978) 923-0400
Green Job No. 15055
PROGRESS SET 9/22/2017
������
����
����
���
������
���
���
����
�
��������
����
��
������
������ ��
������
���
���
����
���
�����
����
������
���������
���������
����
��������
�����
����
��
�� ���
���
��
�����
����
���
�����
���
����� �
���
�����
����
�
����
�
���� �
� ���
������
��
�����
������
���
�����
�
�
�
����
�
�
������
�
��
��
���� ��
��
���� �
��
�
��
����
��
��
������
��
��
��
����
�
�
��
����
��
��
����� �
����
�
�� �
��
���� �
��
��
����
�
�
����
����
��������
����
����
����
����
��
����
����
���
����
����
���
����
����
��������������
��������������
��������
���
����
����
����
���
����
����
��
��
��
��
����
�
�����
�����
�
�
�
���
���
���
������
����
��������
���
�����
����
������
���
���
����
���
����
�����
���
���
����
�
���
���� ���
���
���������� �����
����
����
����
�������������������������
���������������
����
���
���
����
����
���
���
�����
���������
�������
���������
�������
������������ ������������
������ ���
������ �������������
������
�����
��
������
�����
���
� ����
���
����
��
�����
�������
���
������
������
�����
����
��
�����
����
���
��������
����
���
������
�������
���
� !"#!$#%��&&'
���
��
�����
�����
���
������
�����
��
���
�����
���
�����
����
���
�����
����
���
����
�����
���
������
������
������
������
��
�(������
�������
����
������
��
�(�����
����
����
������
��
������
����
�������
��
�����
�����
��
� ��
��
�
�
�
�
�
�
���
���
���
�
������
����
��
�����
������
���
� ���
�������
��
�����
������
���
� !"#!$#%��&&'
��
�����
�
����
�����
��
���
����
�����
���
���
��)���*�+
�
�
��
FLOOR PLAN
MATERIALS: METAL PANEL
MATERIALS: CONCRETE BLOCK
���������
��� ���
���������
��� ���
�������������
����
���� ���
�������
��� �����
���������������
� �����������
������������������������
�� ������������� �������������
��� � �����
� �����������
� �����
�� ������
�� ���
������������������������
�� ������������� �������������
��� � �����
� �����������
� �����
�� ������ �
��!������������ ���� ��
������
����������
��� ���
�����
��� ���
��������
��� ���
��� ���
�� ���
��� � ���
�� ���
� �����������
� �����
�� ������ �
��!����������
������!��������
� ��
���� ���
�� ��
�� ���
��� ��
���������
��� ���
���������
��� ���
���
���
���
���
�������������
����
���� ���
���� ���
���
���
���
���
���
���
������������������� ������
����������������������������������
�������������
�������
������
������������������� ������
����������������������������������
������������
�������������
�������
�������������
�������������
�������
��������������
�����������
�������������
�������
�����
�����������
����������
��� ��� ��
���
��
���
����
���
��
���
���
��
��
���
���
���
��
���
���������
��� ���
���������
��� ���
�������������
����
���� ���
�
�� ��
�
������������������� ����������������������������������������������������
������������������������������������������
������������������������������������������
������������������������������������������
������������������������ �� ����������������
�� �!"�����������
����������
��� ���
�
�� ��
�
���������������������������������������
��
��� ���������
�������
������ ������
����
��������
������������������� ��������������������
��������������������������������
�����
��
����
�
�����
��
����������
��������
����������������������������������������������������
��������������
����
��
���������
����
�
NORTH ELEVATION
SOUTH ELEVATION
WEST ELEVATIONEAST ELEVATION
ELEVATION DEVELOPMENT
EXTERIOR DEVELOPMENT: NORTH EAST CBP VIEW
HARD SECONDARY;
NO WINDOWS
CLEARSTORY ABOVE
PROCESSING AND
WAITING
GLAZING AT OFFICES; HIGH
TO ALLOW FOR FURNITURE
ALONG EXTERIOR WALL
METAL PANEL ON CMU
AT APPARATUS BAY
ENTRY FROM PLANE
VIEW TO
AIRFIELD
EXTERIOR DEVELOPMENT: SOUTH EAST VIEW
CANOPY OVER ENTRY
AND PATIO
HARD SECONDARY;
NO WINDOWS
ARFF ENTRY
APPARATUS BAY;
HIGH WINDOWS, POLISHED
FACE CMU
CBP OFFICES DAY ROOM AND
TRAINING
APPARATUS
BAY
LOCKER ROOMS;
HIGH WINDOWS
EXTERIOR DEVELOPMENT: NORTH WEST VIEW
VIEW TO AIRFIELD
EYE WASHWITH SHOWER
EXISTING WASHERAND DRYER
LOW MAINTENANCEPLANTING BEDS
LOW WALL
5' -
0"
20' -
0"
5' -
0"
65' -
0"
71' -
0"
19' -
0"
CLR
5' -
0"
98 S
F
FIL
E R
OO
M
206
107 SF
MEN
210
324 SF
CBP PROCESSING AREA
203
495 SF
PASSENGER WAITING
202
32 SF
EXIT
201
57 SF
PUBLIC TOILET
217
114 SF
INTERVIEW / DRY HOLD
ROOM
216100 SF
SEARCH ROOM
214
119 SF
LAN
212
71 SF
MECH.
211
56 SF
SEC. STORAGE
220
283 SF
OFFICES
204
11 SF
RECYCLING
205
219A
213A
216A214A
211A
210A
207A
206A
207B
212A
301B
109A
100A
107A
100B
111A
106A
113AA111AA113A
112AA110AA 112A
301A300A
300B
304A
110A
209A
217A
205A
1
A700
201B
200A
108A
184 SF
HARD SECONDARY
264
59 SF
PUBLIC TOILET
219
84 SF
ELEC.
213
FIRST AID CABINET
139 SF
WOMEN
209
208A30 SF
JC
266
EMERGENCYEYE WASH
EMERGENCYEYE WASH
ARFF CBP
117A
(5) CONCRETE BASE FLAG POLES
PANTRY STORAGE
STORAGE CABINETS
114A
201A
200B
33 SF
ENTRY
200
EXISTINGCONCRETE (125.5')
EXISTINGASPHALT
264A
264B
212B
220A
118A
PAVEMENT SLOPED TO MEET FLOOR ELEVATION
BOLLARD, TYP
HOSE BIB
BOLLARD, TYP
FEC
FEC
HOSE BIB
FEC
BOLLARD, TYP
BOLLARD, TYP
(6) OF (12) TURNOUT
GEARLOCKERS
HOSE RACK
HYDRANT
HOSEBIB
APRON
PAVEMENT MARKING
ISOLATION VALVES ON ALL SERVICE AIR, WATER, FOAM
PAVEMENT MARKING
TRENCH DRAIN TRENCH DRAIN
MOBILE HOSE CART
EMERGENCY SHOWER
FOAM RESUPPLY FILLING STATION & PUMP
FIRE EXTINGUISHER & HOOK
AIR COMPRESSOR
WATER HEATER
AIR STORAGE SYSTEM
SELF CONTAINED BREATHING APPARATUS COMPRESSOR
SELF CONTAINED BREATHING APPARATUS FILL STATION
COMPRESSED AIR VEHICLE MAINTENANCE
SPEED BAG RACK
PALLET STORAGE AREA
(6) OF (12) TURNOUT
GEARLOCKERS
HEAVY BAG WEIGHT RACK
FORMS
MOP SINK
CLEANING SUPPLY
SHELVES
PAINTED WALKWAY
FFE 128.5'
FFE 128.5'
FFE 126.5'
HIGH POINT OF EXISTING ASPHALT127.5'
1
A701
2
A701
1
A701
2
A701
COMPRESSOR
SPRINKLER VALVE ZONEREF. MEP DWGS
HALATRON TANK
DUMBELL RACK
COMPRESSED ARGON TANKS
RADIO CHARGING
SHELVES
CONCRETE PAD
224 SF
DINING
103
192 SF
PATIO
106
173 SF
DAY ROOM
107
222 SF
TRAINING
104
159 SF
WATCH / ALARM ROOM
10995 SF
COMM. BUNK
110
134 SF
DORM
112
489 SF
CORRIDOR
101
115 SF
IT
117
129 SF
MEN
114
97 SF
LOCKER
115
149 SF
WOMEN
118
84 SF
LOCKER
119134 SF
DORM
113
135 SF
DORM
111
36 SF
ENTRY
100
600 SF
COMMAND VEHICLE
PARKING
301
1,676 SF
APPARATUS BAY
305
1,542 SF
BACKUP ARFF TRUCK
300
550 SF
FOAM TRAILER
306
31 SF
BOILER
309
84 SF
MECH
307
LOCKABLE FENCE
GENERATORLOCATION
TRANSFORMERLOCATION
1/8" = 1'-0"
A200
OVERALLFLOOR PLAN
HANSCOM FIELD ARFFAND CBP FACILITY
100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 S100 SF
SEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCSEARCH ROOM
214214214214214214214214214214214BOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARDBOLLARD, TYP, TYP, TYP, TYP, TYP, TYP, TYP, TYP, TYP, TYP, TYP, TYP, TYP, TYP
PAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTEDPAINTED WALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAYWALKWAY
1,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,6761,676 SF
APPARAPPARATUS ATUS ATUS BAYBAYBAYBAY
305
11
FOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM REFOAM RESUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY SUPPLY FILLINGFILLINGFILLINGFILLINGFILLINGFILLINGSTATIONSTATIONSTATIONSTATIONSTATIONSTATIONSTATIONSTATIONSTATIONSTATIONSTATIONSTATIONSTATION & PUMP & PUMP & PUMP & PUMP & PUMP & PUMP & PUMP & PUMP & PUMP
FIRE EXFIRE EXTINGUISTINGUISHER & HHER & HOOKOOKOOK
WATER HWATER HEATEREATEREATEREATEREATER
GENERATGENERATGENERATGENERATGENERATGENERATGENERATGENERATORLOCATIOLOCATIOLOCATIOLOCATIOLOCATIONN
TRANSFOTRANSFOTRANSFOTRANSFOTRANSFORMERLOCATIOLOCATIOLOCATIONN
AERIAL VIEW OF AIRFIELD
PROJECT SCHEDULE
top related