Mar 2021
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
2
76 Petron Corp.
Limay, Bataan, Philippines
(Phase 3)
RSFFB-3 2 x 200 TPH circulating fluidized bed coal fired boiler island, 2 x 22.2 MW Back Pressure type turbine/ generator island, w/ relative auxiliaries, DCS, bag filter, material crushing/conveying system and cooling tower.
200,000 / 131 / 541 EPC Turnkey 2019~(2022)
75 Mariveles Power Generation Corp.
Mariveles, Bataan, Philippines
MPGC 4 x 460 TPH reheat type circulating fluidized bed coal-fired boiler island, 4 x 150 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, material storage/crushing/ conveying system, seawater intake & cooling, de-min. and waste water treatment.
460,000 / 129 / 541 EPC Turnkey 2016~(2023)
74 PT. Asahimas Chemical
Desa Gunung Sugih, Banten Indonesia
ASC 2 x 500 TPH circulating fluidized bed coal fired boiler island, 2 x 151.5 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, crushing/ conveying system, de-min. and waste water treatment.
500,000 / 129 / 541 EPC Turnkey 2015~2018
73 SMC Consolidated Power Corporation
(Originally Limay Premiere Power Corp.)
Limay, Bataan, Philippines
LMYP-2 2 x 460 TPH reheat type circulating fluidized bed coal-fired boiler island, 2 x 150 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, material storage/crushing/ conveying system, seawater intake & cooling, de-min. and waste water treatment.
460,000 / 129 / 541 EPC Turnkey 2015~2018
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
3
72 Panay Energy Development Corp.
Iloilo, Iloilo, Philippines
PEDC-3 1 x 520 TPH circulating fluidized bed coal fired boiler island, 1 x 150 MW turbine/ generator island, w/ relative auxiliaries, substation, DCS, ESP, stack, jetty, material storage/crushing/ conveying system, seawater intake & cooling, desalination, de-min. and waste water treatment.
520,000 / 129 / 541 EPC Turnkey 2013~2016
71 Anda Power Corporation
Bo. Bundagul, Mabalacat, Pampanga, Philippines
ANDA 1 x 300 TPH circulating fluidized bed coal fired boiler island, 1 x 82 MW turbine/ generator island, w/ relative auxiliaries, substation, DCS, ESP, stack, material storage/crushing/ conveying system, cooling tower, de-min. and waste water treatment.
300,000 / 129 / 541 EPC Turnkey 2013~2016
70 San Miguel Consolidated Power Corporation
Malita, Davao Del Sur, Philippines
DVOP-1 2 x 460 TPH reheat type circulating fluidized bed coal-fired boiler island, 2 x 150 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, material storage/crushing/ conveying system, seawater intake & cooling, de-min. and waste water treatment.
460,000 / 129 / 541 EPC Turnkey 2013~2017
69 SMC Consolidated Power Corporation
Limay, Bataan, Philippines
LMYP-1 2 x 460 TPH reheat type circulating fluidized bed coal-fired boiler island, 2 x 150 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, material storage/crushing/ conveying system, seawater intake & cooling, de-min. and waste water treatment.
460,000 / 129 / 541 EPC Turnkey 2013~2017
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
4
68 Formosa Industries Corp.
Nhon Trach, Dong Nai, Vietnam
VN-3 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries.
540,000 / 129 / 541 Engineering & Supply 2013~2016
67 Therma South Inc.
Davao Del Sur, Philippines
TSE-1 2 x 520 TPH circulating fluidized bed coal fired boiler island, 2 x 150 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP & stack.
520,000 / 129 / 541 EPC Turnkey 2012~2016
66 Toledo Power Company
Toledo, Cebu, Philippines
TPC-1A 1 x 300 TPH circulating fluidized bed coal fired boiler island, 1 x 82 MW turbine/ generator island, w/ relative auxiliaries, substation, DCS, ESP, stack, jetty, material storage/crushing/ conveying system, seawater intake & cooling, desalination, de-min. and waste water treatment.
300,000 / 129 / 541 EPC Turnkey 2012~2015
65 Petron Corp.
Limay, Bataan, Philippines
(Phase 2)
RSFFB 2 x 200 TPH circulating fluidized bed coal fired boiler island, 2 x 35 MW turbine/ generator island, w/ relative auxiliaries, DCS, dry de-SOx system, bag filter, material crushing/conveying system, cooling tower, de-min. and waste water treatment.
200,000 / 131 / 541 EPC Turnkey 2011~2014
64 Shihlien Chemical Ind. Jiangsu Co.
Jiangsu, China
SCJ 4 x 300 TPH circulating fluidized bed coal fired boiler island.
300,000 / 100 / 541 Engineering & Supply 2010~2013
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
5
63 Taganito HPAL Nickel Corp.
Taganito, Surigao Del Norte, Philippines
THP-1 1 x 300 TPH circulating fluidized bed coal fired boiler island, 1 x 48 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, material crushing/ conveying system, cooling tower and de-min system.
300,000 / 129 / 541 EPC Turnkey 2010~2013
62 Petron Corp.
Limay, Bataan, Philippines
(Phase 1)
RSFFPP 2 x 200 TPH circulating fluidized bed coal fired boiler island, 2 x 35 MW turbine/ generator island, w/ relative auxiliaries, DCS, dry de-SOx system, bag filter, material crushing/conveying system, cooling tower, de-min. and waste water treatment.
200,000 / 131 / 541 EPC Turnkey 2009~2013
61 Formosa Industries Corp.
Nhon Trach, Dong Nai, Vietnam
VN-2 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries.
540,000 / 129 / 541 Engineering & Supply 2008~2011
60 Panay Energy Development Corp.
Iloilo, Iloilo, Philippines
PEDC 2 x 300 TPH circulating fluidized bed coal fired boiler island, 2 x 83.7 MW turbine/ generator island, w/ relative auxiliaries, substation, DCS, ESP, stack, jetty, material storage/crushing/ conveying system, seawater intake & cooling, desalination, de-min. and waste water treatment.
300,000 / 129 / 541 EPC Turnkey 2008~2011
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
6
59 Nan Ya Power (Kuanshan) Corp.
Jiangsu, China
KS-3 1 x 250 TPH pulverized coal fired boiler w/ auxiliaries & DCS.
200,000 / 129 / 541 Engineering & Supply 2008~2010
58 Cebu Energy Development Corp.
Toledo, Cebu, Philippines CEDC 3 x 300 TPH circulating fluidized bed coal
fired boiler island, 3 x 83.7 MW turbine/ generator island, w/ relative auxiliaries, substation, DCS, ESP, stack, jetty, material storage/crushing/ conveying system, seawater intake & cooling, desalination, de-min. and waste water treatment.
300,000 / 129 / 541 EPC Turnkey 2008~2010
57 Nine Dragon Paper Industries (ChongQing) Co., Ltd.
Chongqing, China
NDCQ 2 x 380,000 Nm3/hr flue gas emission control system incl. ESP, GSA & Bag filter, and 1 x 760,000 Nm3/hr flue gas of FGD for 2 x 320 TPH circulating fluidized bed coal fired boiler.
320,000 / -- / -- EPC Turnkey
(Excl. Civil work)
2007~2008
56 Shine Dragons Paper Industries (TianJin) Co., Ltd.
Tianjin, China
SDTJ-2 1 x 300 TPH circulating fluidized bed coal fired boiler island, 1 x 43.56 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP & FGD.
300,000 / 129 / 541 Engineering & Supply
(EPC Turnkey for FGD & ESP Excl. Civil work)
2007~2009
55 Nine Dragons Paper Industries (TianJin) Co., Ltd.
Tianjin, China
NDTJ-1 1 x 300 TPH circulating fluidized bed coal fired boiler island, 1 x 43.56 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP & FGD.
300,000 / 129 / 541 Engineering & Supply
(EPC Turnkey for FGD & ESP Excl. Civil work)
2007~2009
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
7
54 Dongguan Nine Dragons Paper Industries Co., Ltd.
Dongguan, Guangdong, China
NDDG 2 x 380,000 Nm3/hr flue gas of ESP and 1 x 760,000 Nm3/hr flue gas of FGD for 2 x 320 TPH circulating fluidized bed coal fired boiler.
320,000 / -- / -- EPC Turnkey
(Excl. Civil work)
2007~2008
53 Nine Dragons Paper Industries (TaiChan) Co., Ltd.
Taichan, Jiangsu, China
NDTC 1 x 520,000 Nm3/hr flue gas of ESP & FGD for 1 x 410 TPH pulverized coal fired boiler.
410,000 / -- / -- EPC Turnkey
(Excl. Civil work)
2007
52 Formosa Plastics Corp., Texas
Point Comfort, Texas, USA
CB-1/2 2 x 500 TPH circulating fluidized bed pet-coke fired boiler island w/ relative auxiliaries, DCS & substation.
500,000 / 129 / 541 Engineering & Supply 2007~2012
51 Yee-Fong Chemical & Ind. Co., Ltd.
Tao-Yuan, Taiwan
YFG-1 1 x 200 TPH pulverized coal fired boiler island, 1 x 48 MW turbine/generator island, w/ relative auxiliaries, DCS, SCR, ESP, FGD, stack & cooling tower.
200,000 / 129 / 541 EPC Turnkey
(Excl. Civil work)
2006~2008
50 Chang Chun Chemical (Jiangsu)
Jiangsu, China
#1 CSG 1 x 225 TPH pulverized coal fired boiler island, 1 x 50 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP, FGD, stack, de-min plant & coal conveying system.
225,000 / 129 / 541 EPC Turnkey
(Excl. Civil work)
2005~2007
49 Formosa Chemicals & Fibre Corp.
Longder, Ilan, Taiwan
LT-3 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, SCR & cooling tower.
540,000 / 129 / 541 Engineering & Supply 2004~2006
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
8
48 Formosa Power (Ningbo) Ltd.
Ningbo, China
NB-3 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries & cooling tower.
540,000 / 129 / 541 Engineering & Supply 2004~2006
47 Formosa Petrochemical Corp.
Mailiao, Yunlin, Taiwan
HP-5 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, SCR & cooling tower.
540,000 / 129 / 541 Engineering & Supply 2004~2006
46 Nan Ya Polyester (Kuanshan) Corp.
Jiangsu, China
KP-1 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.
200,000 / 129 / 541 Engineering & Supply 2004~2006
45 Hainan Jinhai Pulp & Paper Co., Ltd
Yangpu, Hainan, China
TG-5 Balance of plant of 1 x 90 MW turbine island.
400,000 / 128 / 540 Engineering & Supply 2004~2006
44 Gold East Paper (Jiangsu) Co., Ltd
Zhenjiang, Jiangsu, China
TG-4 1 x 80 MW turbine/generator set w/ auxiliaries & steam distribution piping system.
400,000 / 128 / 540 Engineering & Supply 2004~2005
43 Formosa Plastic Co.,
Kaohsiung, Taiwan
JP-6 1 x 540 TPH pulverized coal fired boiler island, 1 x 49.9 MW turbine/generator island, w/ relative auxiliaries, DCS, SCR, ESP, FGD, stack & coal conveying system.
540,000 / 129 / 541
(Split live steam to others)
EPC Turnkey
(Excl. Civil work)
2003~2005
42 Nan Ya Power (Kuanshan) Corp.
Jiangsu, China
KS-2 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.
200,000 / 129 / 541 Engineering & Supply 2003~2005
41 Hainan Jinhai Pulp & Paper Co., Ltd
Yangpu, Hainan, China
TG-3 Balance of plant of 1 x 90 MW turbine island.
400,000 / 128 / 540 Engineering & Supply 2003~2005
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
9
40 Hua Yang Electric Power Corp
Fujian, China
CP-7 1 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.
1,950,000 / 264 / 538/566(RH)
Engineering & Supply
(Work with Alstom CE)
2003~2007
39 Hainan Jinhai Pulp & Paper Co., Ltd
Yangpu, Hainan, China
TG-1/2 Balance of plants of 2 x 120 MW turbine island & steam distribution system.
700,000 / 84 / 478 Engineering & Supply 2003~2005
38 Asia Pacific Energy Corp
Pampanga, Philippines
AP-1 1 x 200 TPH circulating fluidized bed coal fired boiler island, 1 x 48 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, cooling tower, de-min plant, waste treatment plant, substation & coal storage/ crushing/conveying system.
200,000 / 129 / 541 EPC Turnkey
(BOO Project)
2003~2005
37 Formosa Power (Ningbo) Ltd.
Ningbo, China
NB-2 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries & cooling tower.
540,000 / 129 / 541 Engineering & Supply 2003~2005
36 Ningbo Asia Pulp & Paper Co.,
Ningbo, China
XGPG-1/2 2 x 300 TPH circulating fluidized bed coal fired boiler island, 2 x 62 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP & material storage/crushing/conveying system.
300,000 / 129 / 541 Engineering & Supply 2003~2005
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
10
35 Chang Chun Petrochemical Co.,
Kaohsiung, Taiwan
#2 TCG 1 x 330 TPH pulverized coal fired boiler island, 1 x 49.9 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP, SCR, FGD & cooling tower.
330,000 / 129 / 541 EPC Turnkey
(Excl. Civil work)
2002~2004
34 Nan Ya Power (Kuanshan) Corp.
Jiangsu, China
KS-1 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.
200,000 / 129 / 541 Engineering & Supply 2002~2004
33 Formosa Power (Ningbo) Ltd.
Ningbo, China
NB-1 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.
540,000 / 129 / 541 Engineering & Supply 2002~2004
32 Formosa Industries Corp.
Nhon Trach, Dong Nai, Vietnam
VN-1 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.
540,000 / 129 / 541 Engineering & Supply 2002~2004
31 Hwa Ya Power Corp.
Taoyuan, Taiwan
HY-1/2 2 x 540 TPH pulverized coal fired boiler island, 2 x 160 MW turbine/generator island, w/ relative auxiliaries, DCS, SCR, ESP, FGD, cooling tower, de-min plant, substation & coal storing/conveying system.
540,000 / 129 / 541 EPC Turkey
(BOO Project)
2002~2004
30 Formosa Petrochemical Corp.
Mailiao, Yunlin, Taiwan
HP-4 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, DCS & SCR.
540,000 / 129 / 541 Engineering & Supply 2001~2003
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
11
29 Formosa Petrochemical Corp.
Mailiao, Yunlin, Taiwan
MP-6 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, DCS & SCR.
540,000 / 129 / 541 Engineering & Supply 2001~2002
28 Nan Ya Plastics Corp.
Jinshin, Taoyuan, Taiwan
JH-2 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, SCR & cooling tower.
200,000 / 129 / 541 Engineering & Supply 2001~2003
27 Factory Sales Eng. Inc., USA --- 1 x 120 TPH bagasse fired boiler. 120,000 / 42 / 410 Boiler supply 2001
26 Formosa Plastics Corp., USA
Texas, USA
#6 1 x 154 TPH double pressure heat recovery steam generator set.
154,000 / -- / -- EPC Turnkey 2000~2001
25 Formosa Plastic Co.,
Kaohsiung, Taiwan
JP-1 1 x 246 TPH oil fired boiler low NOX burner retrofit.
246,000 / 129 / 541 EPC Turnkey 2000
24 Formosa Plastic Co.,
Kaohsiung, Taiwan
JP-2 1 x 180 TPH oil fired boiler low NOX burner retrofit.
180,000 / 129 / 541 EPC Turnkey 2000
23 Formosa Chemical & Fibre Corp.
Changhua, Taiwan
G8 1 x 380 TPH pulverized coal fired boiler w/ auxiliaries, DCS, SCR & cooling tower.
380,000 / 129 / 541 Engineering & Supply 2000~2001
22 Hua Yang Electric Power Corp
Fujian, China
CP-5/6 2 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.
1,950,000 / 264 / 538/566(RH)
Engineering & Supply
(Work with Alstom CE)
2000~2004
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
12
21 Formosa Chemicals & Fibre Corp.
Longder, Ilan, Taiwan
LT-2 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, DCS, SCR & cooling tower.
540,000 / 129 / 541 Engineering & Supply 1999~2001
20 Formosa Petrochemical Corp.
Mailiao, Yunlin, Taiwan
RF-CFB #1/2
2 x 500 TPH circulating fluidized bed pet-coke fired boiler island, 2 x 148 MW turbine/generator island, w/ relative auxiliaries, DCS, NID, stack, cooling tower & material storage/crushing/ conveying system.
500,000 / 129 / 541 EPC Turnkey 1999~2002
19 Taiwan Co-generation Company
Tainan, Taiwan
TCC-KT 1 x 200 TPH circulating fluidized bed coal fired boiler island, 1 x 48 MW turbine/ generator island w/ relative auxiliaries, DCS, ESP, cooling tower, de-min plant, substation & coal crushing/ conveying system.
200,000 / 129 / 541 EPC Turnkey
(Excl. Boiler parts supply & Civil work)
1998~2000
18 Formosa Chemicals & Fibre Corp.
Longder, Ilan, Taiwan
LT-1 1 x 120 T/H pulverized coal fired boiler low NOX burner retrofit.
120,000 / 64 / 480 EPC Turnkey 1998
17 Formosa Plastic Co.,
Kaohsiung, Taiwan
LP-1 1 x 120 T/H pulverized coal fired boiler low NOX burner retrofit.
120,000 / 129 / 541 EPC Turnkey 1998
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
13
16 Formosa Petrochemical Corp.
Mailiao, Yunlin, Taiwan
UP-A/B/C 3 x 1,907,000 Nm3/hr of sea water method flue gas desulphurization system for 3 x 1,950 TPH pulverized coal fired supercritical boiler.
1,950,000 / 264 / 538/566(RH)
Supply & Installation 1998~2000
15 Mai-Liao Power Corporation
Mailiao, Yunlin, Taiwan
FP-1/2/3/5 4 x 1,907,000 Nm3/hr of sea water method flue gas desulphurization system for 4 x 1,950 TPH pulverized coal fired supercritical boiler.
1,950,000 / 264 / 538/566(RH)
Supply & Installation 1998~2000
14 Formosa Petrochemical Corp.
Mailiao, Yunlin, Taiwan
UP-A/B 2 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.
1,950,000 / 264 / 538/566(RH)
Construction 1998~2000
13 Mai-Liao Power Corporation
Mailiao, Yunlin, Taiwan
FP-1/2/5 3 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.
1,950,000 / 264 / 538/566(RH)
Construction 1998~2000
12 Formosa Petrochemical Corp.
Mailiao, Yunlin, Taiwan
UP-C 1 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.
1,950,000 / 264 / 538/566(RH)
EPC Turnkey
(Work with Alstom CE)
1997~2000
11 Mai-Liao Power Corporation
Mailiao, Yunlin, Taiwan
FP-3 1 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.
1,950,000 / 264 / 538/566(RH)
EPC Turnkey
(Work with Alstom CE)
1997~2000
10 Formosa Chemicals & Fibre Corp.
Hsinkang, Chiayi, Taiwan
SK-4 1 x 530 TPH pulverized coal fired boiler w/ auxiliaries, DCS, SCR & cooling tower.
530,000 / 129 / 541 Engineering & Supply 1997~2000
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
14
9 China Petroleum Corporation
Kaohsiung, Taiwan
#13, #17 2 x 130 TPH oil/gas fired boiler low NOX burner retrofit.
130,000 / -- / -- EPC Turnkey 1997
8 Formosa Petrochemical Corp.
Mailiao, Yunlin, Taiwan
HP-1~3
3 x 500 TPH pulverized coal fired boiler w/ auxiliaries, DCS, SCR & cooling tower.
500,000 / 129 / 541 Engineering & Supply 1997~2000
7 Formosa Petrochemical Corp.
Mailiao, Yunlin, Taiwan
MP-1~5
5 x 350 TPH pulverized coal fired boiler w/ auxiliaries, DCS, SCR & cooling tower.
350,000 / 109 / 510 Engineering & Supply 1995~1998
6 Nan Ya Plastics Corp.
Jinshin, Taoyuan, Taiwan
JH-1 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.
200,000 / 129 / 541 Engineering & Supply 1995~1997
5 P.T. Pabrik Kertas Tjiwi Kimia
Mojokerto, Jatim, Indonesia
TK-3 1 x 300 TPH pulverized coal fired boiler island, 1 x 70 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP, stack, coal conveying & cooling tower.
300,000 / 99 / 538 EPC Turnkey 1995~1996
4 P.T. Indah Kiat Pulp & Paper Corp.
Serang, Jawa Barat, Indonesia
SC-6 1 x 300 TPH pulverized coal fired boiler island, 1 x 70 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP, stack, coal conveying & cooling tower.
300,000 / 99 / 538 EPC Turnkey 1994~1996
3 Formosa Chemical & Fibre Corp.
Changhua, Taiwan
G7 1 x 350 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.
350,000 / 129 / 541 Engineering & Supply 1994~1996
Reference List (Power plant)
item Customer /
Location Project Abbrev.
Project Description Live steam parameter kg/hr / kg/cm2G / OC
Work Scope Duration
Year
15
2 Nan Ya Plastics Corp.
Shulin, Taipei, Taiwan
SL-2 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.
200,000 / 129 / 541 Engineering & Supply 1992~1994
1 Formosa Chemicals & Fibre Corp.
Hsinkang, Chiayi, Taiwan
SK-3 1 x 350 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.
350,000 / 129 / 541 Engineering & Supply 1992~1994
Contact Us:
高雄總公司 / 仁武廠
Head Office / Jen-Wu Plant
814538 高雄市仁武區水管路 100 號
No.100, SWEI-KUAN RD., JEN-WU DIST., KAOHSIUNG CITY 814538, TAIWAN, R.O.C.
TEL:+886-7-3711411 ext. 6406,6407
FAX:+886-7-3721833
e-mail:terencechao@fpc.com.tw
台北辦公室
Taipei Office
105017 台北市松山區敦化北路
201-20 號後棟四樓
4th FL, No.201-20, TUNG-HUA N. RD., SONGSHAN DIST., TAIPEI CITY 105017, TAIWAN, R.O.C.
TEL:+886-2-27178148~50
FAX:+886-2-27135519
e-mail:sales-fhi@fpc.com.tw
麥寮鍋爐課
Boiler Shop in Mai-Liao
638501 雲林縣麥寮鄉台塑工
業園區 3 號
NO.3, FORMOSA INDUSTRIAL PARK, MAI-LIAO TOWNSHIP, YUN-LIN COUNTY 638501, TAIWAN, R.O.C.
TEL:+886-5-6816021~2
FAX:+886-5-6812043
top related