Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

2

76 Petron Corp.

Limay, Bataan, Philippines

(Phase 3)

RSFFB-3 2 x 200 TPH circulating fluidized bed coal fired boiler island, 2 x 22.2 MW Back Pressure type turbine/ generator island, w/ relative auxiliaries, DCS, bag filter, material crushing/conveying system and cooling tower.

200,000 / 131 / 541 EPC Turnkey 2019~(2022)

75 Mariveles Power Generation Corp.

Mariveles, Bataan, Philippines

MPGC 4 x 460 TPH reheat type circulating fluidized bed coal-fired boiler island, 4 x 150 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, material storage/crushing/ conveying system, seawater intake & cooling, de-min. and waste water treatment.

460,000 / 129 / 541 EPC Turnkey 2016~(2023)

74 PT. Asahimas Chemical

Desa Gunung Sugih, Banten Indonesia

ASC 2 x 500 TPH circulating fluidized bed coal fired boiler island, 2 x 151.5 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, crushing/ conveying system, de-min. and waste water treatment.

500,000 / 129 / 541 EPC Turnkey 2015~2018

73 SMC Consolidated Power Corporation

(Originally Limay Premiere Power Corp.)

Limay, Bataan, Philippines

LMYP-2 2 x 460 TPH reheat type circulating fluidized bed coal-fired boiler island, 2 x 150 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, material storage/crushing/ conveying system, seawater intake & cooling, de-min. and waste water treatment.

460,000 / 129 / 541 EPC Turnkey 2015~2018

Page 3: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

3

72 Panay Energy Development Corp.

Iloilo, Iloilo, Philippines

PEDC-3 1 x 520 TPH circulating fluidized bed coal fired boiler island, 1 x 150 MW turbine/ generator island, w/ relative auxiliaries, substation, DCS, ESP, stack, jetty, material storage/crushing/ conveying system, seawater intake & cooling, desalination, de-min. and waste water treatment.

520,000 / 129 / 541 EPC Turnkey 2013~2016

71 Anda Power Corporation

Bo. Bundagul, Mabalacat, Pampanga, Philippines

ANDA 1 x 300 TPH circulating fluidized bed coal fired boiler island, 1 x 82 MW turbine/ generator island, w/ relative auxiliaries, substation, DCS, ESP, stack, material storage/crushing/ conveying system, cooling tower, de-min. and waste water treatment.

300,000 / 129 / 541 EPC Turnkey 2013~2016

70 San Miguel Consolidated Power Corporation

Malita, Davao Del Sur, Philippines

DVOP-1 2 x 460 TPH reheat type circulating fluidized bed coal-fired boiler island, 2 x 150 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, material storage/crushing/ conveying system, seawater intake & cooling, de-min. and waste water treatment.

460,000 / 129 / 541 EPC Turnkey 2013~2017

69 SMC Consolidated Power Corporation

Limay, Bataan, Philippines

LMYP-1 2 x 460 TPH reheat type circulating fluidized bed coal-fired boiler island, 2 x 150 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, material storage/crushing/ conveying system, seawater intake & cooling, de-min. and waste water treatment.

460,000 / 129 / 541 EPC Turnkey 2013~2017

Page 4: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

4

68 Formosa Industries Corp.

Nhon Trach, Dong Nai, Vietnam

VN-3 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries.

540,000 / 129 / 541 Engineering & Supply 2013~2016

67 Therma South Inc.

Davao Del Sur, Philippines

TSE-1 2 x 520 TPH circulating fluidized bed coal fired boiler island, 2 x 150 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP & stack.

520,000 / 129 / 541 EPC Turnkey 2012~2016

66 Toledo Power Company

Toledo, Cebu, Philippines

TPC-1A 1 x 300 TPH circulating fluidized bed coal fired boiler island, 1 x 82 MW turbine/ generator island, w/ relative auxiliaries, substation, DCS, ESP, stack, jetty, material storage/crushing/ conveying system, seawater intake & cooling, desalination, de-min. and waste water treatment.

300,000 / 129 / 541 EPC Turnkey 2012~2015

65 Petron Corp.

Limay, Bataan, Philippines

(Phase 2)

RSFFB 2 x 200 TPH circulating fluidized bed coal fired boiler island, 2 x 35 MW turbine/ generator island, w/ relative auxiliaries, DCS, dry de-SOx system, bag filter, material crushing/conveying system, cooling tower, de-min. and waste water treatment.

200,000 / 131 / 541 EPC Turnkey 2011~2014

64 Shihlien Chemical Ind. Jiangsu Co.

Jiangsu, China

SCJ 4 x 300 TPH circulating fluidized bed coal fired boiler island.

300,000 / 100 / 541 Engineering & Supply 2010~2013

Page 5: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

5

63 Taganito HPAL Nickel Corp.

Taganito, Surigao Del Norte, Philippines

THP-1 1 x 300 TPH circulating fluidized bed coal fired boiler island, 1 x 48 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, material crushing/ conveying system, cooling tower and de-min system.

300,000 / 129 / 541 EPC Turnkey 2010~2013

62 Petron Corp.

Limay, Bataan, Philippines

(Phase 1)

RSFFPP 2 x 200 TPH circulating fluidized bed coal fired boiler island, 2 x 35 MW turbine/ generator island, w/ relative auxiliaries, DCS, dry de-SOx system, bag filter, material crushing/conveying system, cooling tower, de-min. and waste water treatment.

200,000 / 131 / 541 EPC Turnkey 2009~2013

61 Formosa Industries Corp.

Nhon Trach, Dong Nai, Vietnam

VN-2 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries.

540,000 / 129 / 541 Engineering & Supply 2008~2011

60 Panay Energy Development Corp.

Iloilo, Iloilo, Philippines

PEDC 2 x 300 TPH circulating fluidized bed coal fired boiler island, 2 x 83.7 MW turbine/ generator island, w/ relative auxiliaries, substation, DCS, ESP, stack, jetty, material storage/crushing/ conveying system, seawater intake & cooling, desalination, de-min. and waste water treatment.

300,000 / 129 / 541 EPC Turnkey 2008~2011

Page 6: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

6

59 Nan Ya Power (Kuanshan) Corp.

Jiangsu, China

KS-3 1 x 250 TPH pulverized coal fired boiler w/ auxiliaries & DCS.

200,000 / 129 / 541 Engineering & Supply 2008~2010

58 Cebu Energy Development Corp.

Toledo, Cebu, Philippines CEDC 3 x 300 TPH circulating fluidized bed coal

fired boiler island, 3 x 83.7 MW turbine/ generator island, w/ relative auxiliaries, substation, DCS, ESP, stack, jetty, material storage/crushing/ conveying system, seawater intake & cooling, desalination, de-min. and waste water treatment.

300,000 / 129 / 541 EPC Turnkey 2008~2010

57 Nine Dragon Paper Industries (ChongQing) Co., Ltd.

Chongqing, China

NDCQ 2 x 380,000 Nm3/hr flue gas emission control system incl. ESP, GSA & Bag filter, and 1 x 760,000 Nm3/hr flue gas of FGD for 2 x 320 TPH circulating fluidized bed coal fired boiler.

320,000 / -- / -- EPC Turnkey

(Excl. Civil work)

2007~2008

56 Shine Dragons Paper Industries (TianJin) Co., Ltd.

Tianjin, China

SDTJ-2 1 x 300 TPH circulating fluidized bed coal fired boiler island, 1 x 43.56 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP & FGD.

300,000 / 129 / 541 Engineering & Supply

(EPC Turnkey for FGD & ESP Excl. Civil work)

2007~2009

55 Nine Dragons Paper Industries (TianJin) Co., Ltd.

Tianjin, China

NDTJ-1 1 x 300 TPH circulating fluidized bed coal fired boiler island, 1 x 43.56 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP & FGD.

300,000 / 129 / 541 Engineering & Supply

(EPC Turnkey for FGD & ESP Excl. Civil work)

2007~2009

Page 7: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

7

54 Dongguan Nine Dragons Paper Industries Co., Ltd.

Dongguan, Guangdong, China

NDDG 2 x 380,000 Nm3/hr flue gas of ESP and 1 x 760,000 Nm3/hr flue gas of FGD for 2 x 320 TPH circulating fluidized bed coal fired boiler.

320,000 / -- / -- EPC Turnkey

(Excl. Civil work)

2007~2008

53 Nine Dragons Paper Industries (TaiChan) Co., Ltd.

Taichan, Jiangsu, China

NDTC 1 x 520,000 Nm3/hr flue gas of ESP & FGD for 1 x 410 TPH pulverized coal fired boiler.

410,000 / -- / -- EPC Turnkey

(Excl. Civil work)

2007

52 Formosa Plastics Corp., Texas

Point Comfort, Texas, USA

CB-1/2 2 x 500 TPH circulating fluidized bed pet-coke fired boiler island w/ relative auxiliaries, DCS & substation.

500,000 / 129 / 541 Engineering & Supply 2007~2012

51 Yee-Fong Chemical & Ind. Co., Ltd.

Tao-Yuan, Taiwan

YFG-1 1 x 200 TPH pulverized coal fired boiler island, 1 x 48 MW turbine/generator island, w/ relative auxiliaries, DCS, SCR, ESP, FGD, stack & cooling tower.

200,000 / 129 / 541 EPC Turnkey

(Excl. Civil work)

2006~2008

50 Chang Chun Chemical (Jiangsu)

Jiangsu, China

#1 CSG 1 x 225 TPH pulverized coal fired boiler island, 1 x 50 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP, FGD, stack, de-min plant & coal conveying system.

225,000 / 129 / 541 EPC Turnkey

(Excl. Civil work)

2005~2007

49 Formosa Chemicals & Fibre Corp.

Longder, Ilan, Taiwan

LT-3 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, SCR & cooling tower.

540,000 / 129 / 541 Engineering & Supply 2004~2006

Page 8: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

8

48 Formosa Power (Ningbo) Ltd.

Ningbo, China

NB-3 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries & cooling tower.

540,000 / 129 / 541 Engineering & Supply 2004~2006

47 Formosa Petrochemical Corp.

Mailiao, Yunlin, Taiwan

HP-5 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, SCR & cooling tower.

540,000 / 129 / 541 Engineering & Supply 2004~2006

46 Nan Ya Polyester (Kuanshan) Corp.

Jiangsu, China

KP-1 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.

200,000 / 129 / 541 Engineering & Supply 2004~2006

45 Hainan Jinhai Pulp & Paper Co., Ltd

Yangpu, Hainan, China

TG-5 Balance of plant of 1 x 90 MW turbine island.

400,000 / 128 / 540 Engineering & Supply 2004~2006

44 Gold East Paper (Jiangsu) Co., Ltd

Zhenjiang, Jiangsu, China

TG-4 1 x 80 MW turbine/generator set w/ auxiliaries & steam distribution piping system.

400,000 / 128 / 540 Engineering & Supply 2004~2005

43 Formosa Plastic Co.,

Kaohsiung, Taiwan

JP-6 1 x 540 TPH pulverized coal fired boiler island, 1 x 49.9 MW turbine/generator island, w/ relative auxiliaries, DCS, SCR, ESP, FGD, stack & coal conveying system.

540,000 / 129 / 541

(Split live steam to others)

EPC Turnkey

(Excl. Civil work)

2003~2005

42 Nan Ya Power (Kuanshan) Corp.

Jiangsu, China

KS-2 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.

200,000 / 129 / 541 Engineering & Supply 2003~2005

41 Hainan Jinhai Pulp & Paper Co., Ltd

Yangpu, Hainan, China

TG-3 Balance of plant of 1 x 90 MW turbine island.

400,000 / 128 / 540 Engineering & Supply 2003~2005

Page 9: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

9

40 Hua Yang Electric Power Corp

Fujian, China

CP-7 1 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.

1,950,000 / 264 / 538/566(RH)

Engineering & Supply

(Work with Alstom CE)

2003~2007

39 Hainan Jinhai Pulp & Paper Co., Ltd

Yangpu, Hainan, China

TG-1/2 Balance of plants of 2 x 120 MW turbine island & steam distribution system.

700,000 / 84 / 478 Engineering & Supply 2003~2005

38 Asia Pacific Energy Corp

Pampanga, Philippines

AP-1 1 x 200 TPH circulating fluidized bed coal fired boiler island, 1 x 48 MW turbine/ generator island, w/ relative auxiliaries, DCS, ESP, stack, cooling tower, de-min plant, waste treatment plant, substation & coal storage/ crushing/conveying system.

200,000 / 129 / 541 EPC Turnkey

(BOO Project)

2003~2005

37 Formosa Power (Ningbo) Ltd.

Ningbo, China

NB-2 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries & cooling tower.

540,000 / 129 / 541 Engineering & Supply 2003~2005

36 Ningbo Asia Pulp & Paper Co.,

Ningbo, China

XGPG-1/2 2 x 300 TPH circulating fluidized bed coal fired boiler island, 2 x 62 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP & material storage/crushing/conveying system.

300,000 / 129 / 541 Engineering & Supply 2003~2005

Page 10: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

10

35 Chang Chun Petrochemical Co.,

Kaohsiung, Taiwan

#2 TCG 1 x 330 TPH pulverized coal fired boiler island, 1 x 49.9 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP, SCR, FGD & cooling tower.

330,000 / 129 / 541 EPC Turnkey

(Excl. Civil work)

2002~2004

34 Nan Ya Power (Kuanshan) Corp.

Jiangsu, China

KS-1 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.

200,000 / 129 / 541 Engineering & Supply 2002~2004

33 Formosa Power (Ningbo) Ltd.

Ningbo, China

NB-1 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.

540,000 / 129 / 541 Engineering & Supply 2002~2004

32 Formosa Industries Corp.

Nhon Trach, Dong Nai, Vietnam

VN-1 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.

540,000 / 129 / 541 Engineering & Supply 2002~2004

31 Hwa Ya Power Corp.

Taoyuan, Taiwan

HY-1/2 2 x 540 TPH pulverized coal fired boiler island, 2 x 160 MW turbine/generator island, w/ relative auxiliaries, DCS, SCR, ESP, FGD, cooling tower, de-min plant, substation & coal storing/conveying system.

540,000 / 129 / 541 EPC Turkey

(BOO Project)

2002~2004

30 Formosa Petrochemical Corp.

Mailiao, Yunlin, Taiwan

HP-4 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, DCS & SCR.

540,000 / 129 / 541 Engineering & Supply 2001~2003

Page 11: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

11

29 Formosa Petrochemical Corp.

Mailiao, Yunlin, Taiwan

MP-6 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, DCS & SCR.

540,000 / 129 / 541 Engineering & Supply 2001~2002

28 Nan Ya Plastics Corp.

Jinshin, Taoyuan, Taiwan

JH-2 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, SCR & cooling tower.

200,000 / 129 / 541 Engineering & Supply 2001~2003

27 Factory Sales Eng. Inc., USA --- 1 x 120 TPH bagasse fired boiler. 120,000 / 42 / 410 Boiler supply 2001

26 Formosa Plastics Corp., USA

Texas, USA

#6 1 x 154 TPH double pressure heat recovery steam generator set.

154,000 / -- / -- EPC Turnkey 2000~2001

25 Formosa Plastic Co.,

Kaohsiung, Taiwan

JP-1 1 x 246 TPH oil fired boiler low NOX burner retrofit.

246,000 / 129 / 541 EPC Turnkey 2000

24 Formosa Plastic Co.,

Kaohsiung, Taiwan

JP-2 1 x 180 TPH oil fired boiler low NOX burner retrofit.

180,000 / 129 / 541 EPC Turnkey 2000

23 Formosa Chemical & Fibre Corp.

Changhua, Taiwan

G8 1 x 380 TPH pulverized coal fired boiler w/ auxiliaries, DCS, SCR & cooling tower.

380,000 / 129 / 541 Engineering & Supply 2000~2001

22 Hua Yang Electric Power Corp

Fujian, China

CP-5/6 2 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.

1,950,000 / 264 / 538/566(RH)

Engineering & Supply

(Work with Alstom CE)

2000~2004

Page 12: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

12

21 Formosa Chemicals & Fibre Corp.

Longder, Ilan, Taiwan

LT-2 1 x 540 TPH pulverized coal fired boiler w/ auxiliaries, DCS, SCR & cooling tower.

540,000 / 129 / 541 Engineering & Supply 1999~2001

20 Formosa Petrochemical Corp.

Mailiao, Yunlin, Taiwan

RF-CFB #1/2

2 x 500 TPH circulating fluidized bed pet-coke fired boiler island, 2 x 148 MW turbine/generator island, w/ relative auxiliaries, DCS, NID, stack, cooling tower & material storage/crushing/ conveying system.

500,000 / 129 / 541 EPC Turnkey 1999~2002

19 Taiwan Co-generation Company

Tainan, Taiwan

TCC-KT 1 x 200 TPH circulating fluidized bed coal fired boiler island, 1 x 48 MW turbine/ generator island w/ relative auxiliaries, DCS, ESP, cooling tower, de-min plant, substation & coal crushing/ conveying system.

200,000 / 129 / 541 EPC Turnkey

(Excl. Boiler parts supply & Civil work)

1998~2000

18 Formosa Chemicals & Fibre Corp.

Longder, Ilan, Taiwan

LT-1 1 x 120 T/H pulverized coal fired boiler low NOX burner retrofit.

120,000 / 64 / 480 EPC Turnkey 1998

17 Formosa Plastic Co.,

Kaohsiung, Taiwan

LP-1 1 x 120 T/H pulverized coal fired boiler low NOX burner retrofit.

120,000 / 129 / 541 EPC Turnkey 1998

Page 13: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

13

16 Formosa Petrochemical Corp.

Mailiao, Yunlin, Taiwan

UP-A/B/C 3 x 1,907,000 Nm3/hr of sea water method flue gas desulphurization system for 3 x 1,950 TPH pulverized coal fired supercritical boiler.

1,950,000 / 264 / 538/566(RH)

Supply & Installation 1998~2000

15 Mai-Liao Power Corporation

Mailiao, Yunlin, Taiwan

FP-1/2/3/5 4 x 1,907,000 Nm3/hr of sea water method flue gas desulphurization system for 4 x 1,950 TPH pulverized coal fired supercritical boiler.

1,950,000 / 264 / 538/566(RH)

Supply & Installation 1998~2000

14 Formosa Petrochemical Corp.

Mailiao, Yunlin, Taiwan

UP-A/B 2 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.

1,950,000 / 264 / 538/566(RH)

Construction 1998~2000

13 Mai-Liao Power Corporation

Mailiao, Yunlin, Taiwan

FP-1/2/5 3 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.

1,950,000 / 264 / 538/566(RH)

Construction 1998~2000

12 Formosa Petrochemical Corp.

Mailiao, Yunlin, Taiwan

UP-C 1 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.

1,950,000 / 264 / 538/566(RH)

EPC Turnkey

(Work with Alstom CE)

1997~2000

11 Mai-Liao Power Corporation

Mailiao, Yunlin, Taiwan

FP-3 1 x 1,950 TPH pulverized coal fired supercritical boiler w/ auxiliaries.

1,950,000 / 264 / 538/566(RH)

EPC Turnkey

(Work with Alstom CE)

1997~2000

10 Formosa Chemicals & Fibre Corp.

Hsinkang, Chiayi, Taiwan

SK-4 1 x 530 TPH pulverized coal fired boiler w/ auxiliaries, DCS, SCR & cooling tower.

530,000 / 129 / 541 Engineering & Supply 1997~2000

Page 14: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

14

9 China Petroleum Corporation

Kaohsiung, Taiwan

#13, #17 2 x 130 TPH oil/gas fired boiler low NOX burner retrofit.

130,000 / -- / -- EPC Turnkey 1997

8 Formosa Petrochemical Corp.

Mailiao, Yunlin, Taiwan

HP-1~3

3 x 500 TPH pulverized coal fired boiler w/ auxiliaries, DCS, SCR & cooling tower.

500,000 / 129 / 541 Engineering & Supply 1997~2000

7 Formosa Petrochemical Corp.

Mailiao, Yunlin, Taiwan

MP-1~5

5 x 350 TPH pulverized coal fired boiler w/ auxiliaries, DCS, SCR & cooling tower.

350,000 / 109 / 510 Engineering & Supply 1995~1998

6 Nan Ya Plastics Corp.

Jinshin, Taoyuan, Taiwan

JH-1 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.

200,000 / 129 / 541 Engineering & Supply 1995~1997

5 P.T. Pabrik Kertas Tjiwi Kimia

Mojokerto, Jatim, Indonesia

TK-3 1 x 300 TPH pulverized coal fired boiler island, 1 x 70 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP, stack, coal conveying & cooling tower.

300,000 / 99 / 538 EPC Turnkey 1995~1996

4 P.T. Indah Kiat Pulp & Paper Corp.

Serang, Jawa Barat, Indonesia

SC-6 1 x 300 TPH pulverized coal fired boiler island, 1 x 70 MW turbine/generator island, w/ relative auxiliaries, DCS, ESP, stack, coal conveying & cooling tower.

300,000 / 99 / 538 EPC Turnkey 1994~1996

3 Formosa Chemical & Fibre Corp.

Changhua, Taiwan

G7 1 x 350 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.

350,000 / 129 / 541 Engineering & Supply 1994~1996

Page 15: Mar 2021 - cht.uhome.tw

Reference List (Power plant)

item Customer /

Location Project Abbrev.

Project Description Live steam parameter kg/hr / kg/cm2G / OC

Work Scope Duration

Year

15

2 Nan Ya Plastics Corp.

Shulin, Taipei, Taiwan

SL-2 1 x 200 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.

200,000 / 129 / 541 Engineering & Supply 1992~1994

1 Formosa Chemicals & Fibre Corp.

Hsinkang, Chiayi, Taiwan

SK-3 1 x 350 TPH pulverized coal fired boiler w/ auxiliaries, DCS & cooling tower.

350,000 / 129 / 541 Engineering & Supply 1992~1994

Contact Us:

高雄總公司 / 仁武廠

Head Office / Jen-Wu Plant

814538 高雄市仁武區水管路 100 號

No.100, SWEI-KUAN RD., JEN-WU DIST., KAOHSIUNG CITY 814538, TAIWAN, R.O.C.

TEL:+886-7-3711411 ext. 6406,6407

FAX:+886-7-3721833

e-mail:[email protected]

台北辦公室

Taipei Office

105017 台北市松山區敦化北路

201-20 號後棟四樓

4th FL, No.201-20, TUNG-HUA N. RD., SONGSHAN DIST., TAIPEI CITY 105017, TAIWAN, R.O.C.

TEL:+886-2-27178148~50

FAX:+886-2-27135519

e-mail:[email protected]