N

REV. DATE DESCRIPTION CHK08

07

06

05

04

03

02

01

1/12/2020

1/10/2020

18/09/2020

22/05/2020

20/05/2020

12/05/2020

16/04/2020

30/03/2020

FOR CONSTRUCTION

FOR COORDINATION

FOR COORDINATION

FOR TENDER

FOR TENDER

FOR TENDER

FOR TENDER

DESIGN DEVELOPMENT

RP

RP

RP

BC

BC

BC

BC

BC

FOR CONSTRUCTION

AMENDMENTS

CLIENT

PROJECT

STAGING - DEMOLITION PLAN

50mm ON ORIGINAL

LIVERPOOL HEALTH & ACADEMICPRECINCT

PROJECT NORTH

DRAWING

SCALE PROJECT NO.

14/77 PACIFIC HWY, NORTH SYDNEY NSW 2060

© Copyright 2018p. +61 (0)2 8274 8200 w. www.fitzpatrickpartners.coma. LEVEL 6, 9 CASTLEREAGH STREET, SYDNEY 2000, AUSTRALIA

fitzpatrick partners+

ELIZABETH STREET LIVERPOOL NSW

NOTES

ABBREVIATIONSCOLCOSDPELECEXFCLFFLFHFHRFRLFSFWHYDENGDWG

COLUMNCHECK ON SITE

DOWNPIPEELECTRICAL

EXISTINGFINISHED CEILING LEVELFINISHED FLOOR LEVEL

FIRE HYDRANTFIRE HOSE REEL

FIRE RESISTANCE LEVELFIRE STAIR

FLOOR WASTEHYDRAULICENGINEERS

DRAWINGS + SPECS

MECHMINMAXNOMRLRWOSIMSPECSSLTBCTOWTYPU/SSTRUC

MECHANICALMINIMUM

MAXIMUMNOMINAL

RELATIVE LEVELRAIN WATER OUTLET

SIMILARSPECIFICATION

STRUCTURAL SLAB LEVELTO BE CONFIRMED

TOP OF WALLTYPICAL

UNDERSIDESTRUCTURAL

1. THIS DRAWING IS ISSUED UPON THE CONDITION IT IS NOT COPIED,REPRODUCED, RETAINED OR DISCLOSED TO ANY UNAUTHORISED PERSONEITHER WHOLLY OR IN PART WITHOUT PRIOR CONSENT IN WRITING OFfitzpatrick+partners.

2. DRAWINGS SHOW DESIGN INTENT ONLY. SHOP DRAWINGS ARE TO BEPROVIDED FOR APPROVAL PRIOR TO CONSTRUCTION OR MANUFACTURE.

3. DO NOT SCALE DRAWINGS. CHECK DIMENSIONS BEFORE COMMENCINGWORK.

4. INCONSISTENCIES ARE TO BE REPORTED TO fitzpatrick+partners.

5. NUMBERS FOLLOWING AN ABBREVIATION DENOTE A PARTICULAR TYPE OFITEM. FOR EXPLANATION OF ITEM TYPES REFER TO SPECIFICATION ANDFINISHES SCHEDULE.

6. CONSULTANT DETAILS ARE INCLUDED FOR EASE OF REFERENCE ONLY.

7. ALL DRAWINGS TO BE PRINTED IN COLOUR.

MSCP CONTRACTOR

LEVEL 5/9 -13 CASTLEREAGH ST, SYDNEY NSW 2000

STRUCTURAL / CIVIL

LEVEL 3/48 CHANDOS ST, ST LEONARDS NSW 2065

MECHANICAL / ELECTRICAL / SECURITY

HYDRAULIC / FIRE

LEVEL 9/233 CASTLEREAGH ST, SYDNEY NSW 2000

LEVEL 4/99 WALKER ST, NORTH SYDNEY NSW 2060

LANDSCAPE ARCHITECT

65-69 KENT ST, SYDNEY NSW 2000

2180

7 LH

AP M

SCP

DD

-05

KEY PLAN

218071:500@A1STATUS

CONSTRUCTIONDOCUMENTATION

APPROVEDRP

DRAWNAB

PRINT DATE1/12/2020

ISSUEDRAWING NO.08LHAP-AR-FPA-DRG-CP-030001

PROJECT MANAGER

LEVEL 2, 7-9 WEST STREET, NORTH SYDNEY, NSW 2060

EDU -CONFERENCE

CENTRE

NUCLEARMED

RETAIL

DIALYSIS -ISOLATION

DISCHARGELOUNGE

WC

ADMISSION / PREADMISSIONS

RETAIL

RETAIL

80.08 m2

MED IM- ED

CID

EMERGENCY DEPARTMENT

MED IM- ED

MENTAL HEALTH IPU

PHARMACY

NUC MEDICINE

NUC MED / MEDIMAGING ADMIN

M.FAITH

SWITCH/ CALLCENTRE

DON EVERETT -MENTAL HEALTH

UNIT

BRAIN INJURY

MEDICAL IMAGING

SECURITY

INGHAM INSTITUTE

EDU

DON EVERETT -MENTAL HEALTH

UNIT

DON EVERETT -CLINICAL TRIALS

CAR PARK

EDU

WH&S

HUMANRESOURCESMEDICAL

RECORDS

CANCER ADMIN

6.61 %

20,000

(SETBACK FROM RAILWAY LINE)

10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 11,400 5,050

8,30

08,

700

8,30

028

,700

10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 11,400 5,050

EXTE

NSIO

N O

F THE

MSC

P SCO

PE O

F WO

RK

INC

LIN

E

CY

CW

CX

CZ

CA

CB

CC

CD

C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13

LOT BOUNDARY

SYD

NEY

TRA

IN L

INE

STAGING/DEMOLITION NOTES1. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL DOCUMENTATION PROVIDED.2. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL SPECIALIST ENGINEERING CONSULTANT DOCUMENTATION. ALL ENGINEERING INFORMATION SHOWN IN THE ARCHITECTURAL DOCUMENTS ARE INDICATIVE ONLY.3. MSCP PROJECT TO BE FULLY COORDINATED WITH ALL THE OTHER STAGES AND SCOPE OF WORKS BELONGING TO THE LHAP'S PRECINT [i.e. INFRASTRUCTURE WORKS, EARLY WORKS, MAIN WORKS, etc...].4. STAGING & DEMOLITION PLANS TO BE READ IN CONJUNCTION WITH ALL SPECIALIST ENGINEERING SiD REPORTS.5. SCOPE OF DEMOLITION WORKS SHALL ACCOMODATE THAT NEEDED TO COMPLETE THE PROPOSED AND STAGED WORKS.

EXISTING P2 CARPARK BUILDING TO BEDEMOLISHED AFTER MSCP COMPLETION

MSCP GROUND FLOOR PLAN SHOWNIN BACKGROUND FOR CLARITY

ALL ON-GRADE SERVICES TO BE DEMOLISHEDBEFORE MSCP COMMENCE CONSTRUCTION.DEMOLITION TO BE CORDINATED WITHEXISTING/NEW UNDERGROUND SERVICES.

RELOCATION OF THE EXISTINGOXYGEN TANK NOT PART OFTHE MSCP SCOPE OF WORK

DEMOLITION OF EXISTING RETAINING WALLS,GARDEN BEDS, COVERED WALKWAYTO BE COORDINATED WITH LANDSCAPEDOCUMENTATION