liverpool health & academic precinct
TRANSCRIPT
N
REV. DATE DESCRIPTION CHK08
07
06
05
04
03
02
01
1/12/2020
1/10/2020
18/09/2020
22/05/2020
20/05/2020
12/05/2020
16/04/2020
30/03/2020
FOR CONSTRUCTION
FOR COORDINATION
FOR COORDINATION
FOR TENDER
FOR TENDER
FOR TENDER
FOR TENDER
DESIGN DEVELOPMENT
RP
RP
RP
BC
BC
BC
BC
BC
FOR CONSTRUCTION
AMENDMENTS
CLIENT
PROJECT
STAGING - DEMOLITION PLAN
50mm ON ORIGINAL
LIVERPOOL HEALTH & ACADEMICPRECINCT
PROJECT NORTH
DRAWING
SCALE PROJECT NO.
14/77 PACIFIC HWY, NORTH SYDNEY NSW 2060
© Copyright 2018p. +61 (0)2 8274 8200 w. www.fitzpatrickpartners.coma. LEVEL 6, 9 CASTLEREAGH STREET, SYDNEY 2000, AUSTRALIA
fitzpatrick partners+
ELIZABETH STREET LIVERPOOL NSW
NOTES
ABBREVIATIONSCOLCOSDPELECEXFCLFFLFHFHRFRLFSFWHYDENGDWG
COLUMNCHECK ON SITE
DOWNPIPEELECTRICAL
EXISTINGFINISHED CEILING LEVELFINISHED FLOOR LEVEL
FIRE HYDRANTFIRE HOSE REEL
FIRE RESISTANCE LEVELFIRE STAIR
FLOOR WASTEHYDRAULICENGINEERS
DRAWINGS + SPECS
MECHMINMAXNOMRLRWOSIMSPECSSLTBCTOWTYPU/SSTRUC
MECHANICALMINIMUM
MAXIMUMNOMINAL
RELATIVE LEVELRAIN WATER OUTLET
SIMILARSPECIFICATION
STRUCTURAL SLAB LEVELTO BE CONFIRMED
TOP OF WALLTYPICAL
UNDERSIDESTRUCTURAL
1. THIS DRAWING IS ISSUED UPON THE CONDITION IT IS NOT COPIED,REPRODUCED, RETAINED OR DISCLOSED TO ANY UNAUTHORISED PERSONEITHER WHOLLY OR IN PART WITHOUT PRIOR CONSENT IN WRITING OFfitzpatrick+partners.
2. DRAWINGS SHOW DESIGN INTENT ONLY. SHOP DRAWINGS ARE TO BEPROVIDED FOR APPROVAL PRIOR TO CONSTRUCTION OR MANUFACTURE.
3. DO NOT SCALE DRAWINGS. CHECK DIMENSIONS BEFORE COMMENCINGWORK.
4. INCONSISTENCIES ARE TO BE REPORTED TO fitzpatrick+partners.
5. NUMBERS FOLLOWING AN ABBREVIATION DENOTE A PARTICULAR TYPE OFITEM. FOR EXPLANATION OF ITEM TYPES REFER TO SPECIFICATION ANDFINISHES SCHEDULE.
6. CONSULTANT DETAILS ARE INCLUDED FOR EASE OF REFERENCE ONLY.
7. ALL DRAWINGS TO BE PRINTED IN COLOUR.
MSCP CONTRACTOR
LEVEL 5/9 -13 CASTLEREAGH ST, SYDNEY NSW 2000
STRUCTURAL / CIVIL
LEVEL 3/48 CHANDOS ST, ST LEONARDS NSW 2065
MECHANICAL / ELECTRICAL / SECURITY
HYDRAULIC / FIRE
LEVEL 9/233 CASTLEREAGH ST, SYDNEY NSW 2000
LEVEL 4/99 WALKER ST, NORTH SYDNEY NSW 2060
LANDSCAPE ARCHITECT
65-69 KENT ST, SYDNEY NSW 2000
2180
7 LH
AP M
SCP
DD
-05
KEY PLAN
218071:500@A1STATUS
CONSTRUCTIONDOCUMENTATION
APPROVEDRP
DRAWNAB
PRINT DATE1/12/2020
ISSUEDRAWING NO.08LHAP-AR-FPA-DRG-CP-030001
PROJECT MANAGER
LEVEL 2, 7-9 WEST STREET, NORTH SYDNEY, NSW 2060
EDU -CONFERENCE
CENTRE
NUCLEARMED
RETAIL
DIALYSIS -ISOLATION
DISCHARGELOUNGE
WC
ADMISSION / PREADMISSIONS
RETAIL
RETAIL
80.08 m2
MED IM- ED
CID
EMERGENCY DEPARTMENT
MED IM- ED
MENTAL HEALTH IPU
PHARMACY
NUC MEDICINE
NUC MED / MEDIMAGING ADMIN
M.FAITH
SWITCH/ CALLCENTRE
DON EVERETT -MENTAL HEALTH
UNIT
BRAIN INJURY
MEDICAL IMAGING
SECURITY
INGHAM INSTITUTE
EDU
DON EVERETT -MENTAL HEALTH
UNIT
DON EVERETT -CLINICAL TRIALS
CAR PARK
EDU
WH&S
HUMANRESOURCESMEDICAL
RECORDS
CANCER ADMIN
6.61 %
20,000
(SETBACK FROM RAILWAY LINE)
10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 11,400 5,050
8,30
08,
700
8,30
028
,700
10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 10,800 11,400 5,050
EXTE
NSIO
N O
F THE
MSC
P SCO
PE O
F WO
RK
INC
LIN
E
CY
CW
CX
CZ
CA
CB
CC
CD
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13
LOT BOUNDARY
SYD
NEY
TRA
IN L
INE
STAGING/DEMOLITION NOTES1. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL DOCUMENTATION PROVIDED.2. DRAWINGS TO BE READ IN CONJUNCTION WITH ALL SPECIALIST ENGINEERING CONSULTANT DOCUMENTATION. ALL ENGINEERING INFORMATION SHOWN IN THE ARCHITECTURAL DOCUMENTS ARE INDICATIVE ONLY.3. MSCP PROJECT TO BE FULLY COORDINATED WITH ALL THE OTHER STAGES AND SCOPE OF WORKS BELONGING TO THE LHAP'S PRECINT [i.e. INFRASTRUCTURE WORKS, EARLY WORKS, MAIN WORKS, etc...].4. STAGING & DEMOLITION PLANS TO BE READ IN CONJUNCTION WITH ALL SPECIALIST ENGINEERING SiD REPORTS.5. SCOPE OF DEMOLITION WORKS SHALL ACCOMODATE THAT NEEDED TO COMPLETE THE PROPOSED AND STAGED WORKS.
EXISTING P2 CARPARK BUILDING TO BEDEMOLISHED AFTER MSCP COMPLETION
MSCP GROUND FLOOR PLAN SHOWNIN BACKGROUND FOR CLARITY
ALL ON-GRADE SERVICES TO BE DEMOLISHEDBEFORE MSCP COMMENCE CONSTRUCTION.DEMOLITION TO BE CORDINATED WITHEXISTING/NEW UNDERGROUND SERVICES.
RELOCATION OF THE EXISTINGOXYGEN TANK NOT PART OFTHE MSCP SCOPE OF WORK
DEMOLITION OF EXISTING RETAINING WALLS,GARDEN BEDS, COVERED WALKWAYTO BE COORDINATED WITH LANDSCAPEDOCUMENTATION