2015 PETRONAS CHEMICALS MTBE
(PDH) SDN BHD SUPPLY OF MANPOWER, EQUIPMENT & CONSUMABLE FOR HYDRAULIC TORQUE WRENCH WORK AT REACTOR AREA PDH PLANT
2015 PETRONAS CHEMICALS MTBE SDN BHD
RECTIFY LEAK / REPAIR SHELL CRACK AT EB 201 A MTBE PLANT
2015 PETRONAS CHEMICALS MTBE SDN BHD TO RECTIFY LEAK AT EB224 FOR MTBE PLANT
2015 PETRONAS CHEMICALS MTBE SDN BHD TO RECTIFY LEAK D 218 AT MTBE PLANT
2015 DAYA PROFFSCORP SDN BHD REPLACE CONE SECTION & PERFORM TIBE LEAK TEST AT EA 227 A (BUNDLE NO. 9) MTBE PLANT
2015 PETRONAS CHEMICALS MTBE SDN BHD SUPPLY OF MATERIAL FOR MTBE SD JAN 2015
2015 PETRONAS CHEMICALS MTBE SDN BHD HTW FOR CRITICAL JOINT INSPECTION
2015 DAYA PROFFSCORP SDN BHD EXCAVATION WORK FOR FOAM LINE INSPECTION AT MTBE PLANT
2015 PETRONAS CHEMICALS MTBE SDN BHD LIFTING EQUIPMENT REVALIDATION-‐01 (MTBE)
2015 PETRONAS CHEMICALS MTBE SDN BHD GUILLOTINE DOOR REPAIR WORKS AT B1004
2015 PETRONAS CHEMICALS MTBE SDN BHD
TO PERFORM LEAK TEST & REPAIR WORKS AT EB-‐232
2015 PETRONAS CHEMICALS MTBE SDN BHD
TO RECTIFY UNDERGROUND FIREWATER LINE LEAK AT PCMTBE NEAR TANK T1101 B
2015 ZULKIFLI NGAH ENGINEERING SDN BHD
SUPPLY OF PTFE LINED PIPE FOR PC702A&B AND D1107
2015 PCG, OPTIMAL CHEMICALS PLANT TO PROVIDE REPAIR WORKS FOR SECONDARY QUENCH EXCHANGER E1322
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2015
PETRONAS CHEMICALS MTBE SDN BHD
TO SERVICE PSV FOR MTBE
2015 PETRONAS CHEMICALS MTBE SDN BHD
SERVICE PRESSURE SAFETY VALVE ¾ (S/N 91/08205 & S/N 620820093)
2015 PETRONAS CHEMICALS MTBE (PDH) SDN BHD
CRITICAL JOINT INSPECTION AND RETIGHTENING PROJECT
2015 PETRONAS CHEMICALS MTBE (PDH) SDN BHD
SERVICE PRESSURE SAFETY VALVE 1 ½” X 2” (S/N PB16273)
2014 PETRONAS CHEMICALS MTBE SDN BHD
TO PERFORM BOX UP & DEBLINDING WORKS FOR EA-‐117
2014 CENTRALISED UTILITY FACILITIES, KERTEH
REPLACE PIPE SPOOL AT COLD BOX AREA AT CUF KERTEH
2014 PETRONAS CHEMICALS MTBE SDN BHD
TO FABRICATE PIPE SUPPORT FOR 3" PIPE C/W U-‐BOLT
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD F-‐102 ROOF FABRICATE
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD F-‐102 HEARTH BURNER REPAIR
2014 PETRONAS CHEMICALS MTBE SDN BHD 12" X 150# BUTTERFLY VALVE, EXTEND BONNET
2014 PETRONAS CHEMICALS MTBE SDN BHD PLATE SHEET, SS304, 8FT X 4FT X 45MM THK
2014 PETRONAS CHEMICALS MTBE SDN BHD
TO FABRICATE POONTON AND PERFORM LEAK TEST
2014 PETRONAS CHEMICALS MTBE SDN BHD
TO FABRICATE NUT PLUG AS PER SAMPLE BUT IN MATERIAL SS304
2014 CENTRALISED UTILITY FACILITIES, KERTEH
EMERGENT WORK AT HRSG-‐F STEAM BOILER REPAIR
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2014 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR V-‐130 CONDENSATES DRAIN LINE. (MYLR) & WH-‐A13-‐INLET & OUTLET/ WH-‐A17
2014 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR V-‐110 CHEMICAL INJECTION POINT LEAKING, BYPASS HEADER MODIFICATION 14", SDV/XY 253B EQUALIZING. (MYTP) & OD CAISSON WILDEN PUMP. (MYSH)
2014 PETRONAS CHEMICALS MTBE SDN BHD TO FABRICATE TEST RING FOR KC-‐201 TEST RING
2014 PETRONAS CHEMICALS MTBE SDN BHD FABRICATE BLIND FLANGE 2” X 150# A105
2014 CENTRALISED UTILITY FACILITIES, KERTEH
REPLACE UPVC PIPE SPOOL AT DEMIN WATER PLANT
2014 PETRONAS CHEMICALS MTBE SDN BHD TO REPLACE FLANGE FOR TUBE SIDE EB-‐0704.
2014 PETRONAS CHEMICALS MTBE SDN BHD
REPLACE UNDERGROUND FIREWATER LINE AT AREA 400
2014 PETRONAS CHEMICALS MTBE SDN BHD TO FABRICATE 1-‐1/2" PTFE LINED
2014 PETRONAS CHEMICALS MTBE SDN BHD TO REPAIR/ FABRICATE LOADING LINE AT T-‐201
2014 PETRONAS CHEMICALS MTBE SDN BHD STEAM HEADER MODIFICATION
2014 PETRONAS CHEMICALS MTBE SDN BHD HOT WORK FOR IPF PROJECT
2014 PETRONAS CHEMICALS MTBE SDN BHD
BOLT CHECKING AND TIGHTENING USING HTW MACHINE
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD ET TOP ROOF REPLACEMENT PROJECT
2014 CENTRALISED UTILITY FACILITIES, KERTEH
PROJECT PTFE UPVC PIPE FLANGE CRACK COOLING WATER ACID LINE
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2014 PETRONAS CHEMICALS MTBE SDN BHD MTBETA14: C0103 FABRICATE MONEL SLEEVE
2014 PETRONAS CHEMICALS MTBE SDN BHD MTBETA14: TO FABRICATE PTFE LINED CS
2014 NEWWIN ENGINEERING PAKA SDN
BHD/ PETRONAS CHEMICALS MTBE SDN BHD
TO PERFORM MECHANICAL AND RIGGING WORKS AT R-‐301B AREA 300
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD LIFTING EQUIPMENT REVALIDATION -‐ 3
2014 PETRONAS CHEMICALS MTBE SDN BHD
SUPPLY OF MANPOWER, EQUIPMENT & CONSUMABLE FOR HYDRAULIC TORQUE WRENCH WORK AT MTBE PLANT
2014 PETRONAS CHEMICALS MTBE SDN BHD MTBETA14:EB-‐0703.1 FABRICATE NEW FLANGE
2014 PETRONAS CHEMICALS MTBE SDN BHD REPLACEMENT OF 3 NOS OF HEATER TUBE
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD SPRING HANGER REPLACEMENT
2014 CENTRALISED UTILITY FACILITIES, KERTEH
FABRICATE, INSTALL & REMOVE TEMPORARY PIPE SPOOL FOR BLOWING ACTIVITIES AT ASU 2 PLANT CUF, KERTEH
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD FABRICATION OF COOPER TIN BAR
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD LIFTING EQUIPMENT REVALIDATION -‐ 2
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD NOZZLE FLANGE RESURFACING 4" X 300#
2014 CENTRALISED UTILITY FACILITIES, KERTEH TO REPLACE COOLING WATER ACID LINE
2014 PETRONAS CHEMICALS MTBE SDN BHD
CATALYST TRANSFER PIPE REPLACEMENT AT OLEFLEX REACTOR 1,2,3
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD TO SUPPLY FLEXIBLE HOSE 1” AT ETHYLENE
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD
SPRING HANGER REPLACEMENT & INSTALLATION FOR CH07, CH08, CH09 & CH10
2014 PETRONAS CHEMICALS MTBE SDN BHD EA-‐227 & CLEAN FLARING PIPING TIE-‐IN PROJECT
2014 PETRONAS CHEMICALS MTBE SDN BHD
TO INSTALL NEW TIE-‐IN FOR LEMON GRASS PROJECT AT PORT STORAGE
2014 PETRONAS CHEMICALS ETHYLENE SDN BHD LIFTING EQUIPMENT REVALIDATION
2014 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR BYPASS ATM VENT LINE. (MYGA)
2014 PETRONAS CHEMICALS MTBE SDN BHD
PIPING & INSTRUMENTATION UPGRADE WORK FOR MTBE PLANT
2014 PETRONAS CHEMICALS MTBE SDN BHD TO REPLACE T04 FRP TANK
2013 CENTRALISED UTILITY FACILITIES, KERTEH
EMERGENT WORK LP STEAM HEADER (REPAIR PIPE & INSTALL TEMPORARY SUPPORT & TO FABRICATE TEMPORARY DRAIN LINE AT STEAM HEADER)
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR V-‐875 2" PIPING FROM PSV-‐875 TO 18" VENT HEADER CORRODED. (MYJA), TO FABRICATE SPOOL FOR A-‐15L, SLOT-‐7 OP FLOWLINE. (MYUA) & TO FABRICATE SPOOL FOR H-‐04, SLOT-‐10 GAS LIFT FLOWLINE. (MYSH)
2013 CENTRALISED UTILITY FACILITIES, KERTEH AIR FILTER MODIFICATION
2013 PETRONAS CHEMICALS MTBE SDN BHD
TO FABRICATE S-‐107 TO INSTALL THE COOLING COIL
2013 CENTRALISED UTILITY FACILITIES, KERTEH URGENT WORK
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2013 PETRONAS CHEMICALS MTBE SDN BHD
HYDRAULIC BOLT TENSIONING & BOLT TORQUING
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD FIN BURNER 2 PCS REPAIR
2013 PETRONAS CHEMICALS MTBE SDN BHD
VALVE, GA, TH, MSS MATERIAL SP80, 1" NPTF, CL150, BRZ
2013 PETRONAS CHEMICALS MTBE SDN BHD
FLANGE, BL, 14", 300#, MATERIAL A105N, RF, B16.5
2013 PETRONAS CHEMICALS MTBE SDN BHD
ELBOW, BW, 8", 30, WPB MATERIAL, 90 DEG., LR, SMLS
2013 PETRONAS CHEMICALS MTBE SDN BHD PIPE SPOOL MODIFICATION OF FE-‐2784
2013 PETRONAS CHEMICALS MTBE SDN BHD TEE, EQ., BW, 2.1/2", 40, MATERIAL CS, SMLS
2013 PETRONAS CHEMICALS MTBE SDN BHD
GASKET, SW, 32" 150, B, MATERIAL 316L, GRP, 316L, CS
2013 PETRONAS CHEMICALS MTBE SDN BHD EMERGENT WORK
2013 PETRONAS CHEMICALS MTBE SDN BHD EMERGENT WORK INSTRUMENT
2013 PETRONAS CHEMICALS MTBE SDN BHD BLIND, SPADE, 2" 150#, 6MM, CS, FF, B16, 5
2013 PETRONAS CHEMICALS MTBE SDN BHD FABRICATE END CAP FOR PSV-‐6072
2013 PETRONAS CHEMICALS MTBE SDN BHD FABRICATE INTERNAL FLANGE, 2" NB SCH. 105
2013 PETRONAS CHEMICALS MTBE SDN BHD TO FABRICATE PLUG TUBE
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2013 PETRONAS CHEMICALS MTBE SDN BHD
FABRICATE PLUG TUBE OD 8MM X 12MM X 18MM
2013 PETRONAS CHEMICALS MTBE SDN BHD
TO FABRICATE INSPECTION WINDOW CHANGE HEATER
2013 PETRONAS CHEMICALS MTBE SDN BHD FABRICATE PUZZLE PLATE FTISSENER
2013 PETRONAS CHEMICALS MTBE SDN BHD
FABRICATE PLUG TUBE OD 8MM X 12MM X 18MM, B7
2013 PETRONAS CHEMICALS MTBE SDN BHD
36" X 300/600# SOCW FLANGE SCH. 80 RFFE ASTM A105
2013 PETRONAS CHEMICALS MTBE SDN BHD
FABRICATE EXCHANGE PLUG 15MM, B7 10PCS & NIPPLE 1/2", 100MM(L) THREAD, B7 30
2013 PETRONAS CHEMICALS MTBE SDN BHD BLIND, SPADE, 14" 300#, 10MM, CS, FF, B16,5
2013 PETRONAS CHEMICALS MTBE SDN BHD
PDHTA2013-‐SO1Z130006, TO FABRICATE INSULATION CLIP (SAMPLE A -‐ 200 PCS) (SAMPLE B -‐ 200 PCS)
2013 PETRONAS CHEMICALS MTBE SDN BHD FLANGE, BL, 3", 300#, A105N, RF, B16.5
2013 PETRONAS CHEMICALS MTBE SDN BHD PIPE, 22", 30, 5L-‐B, SMLS, BE
2013 PETRONAS CHEMICALS MTBE SDN BHD FLANGE, BL, 3", 300#, A105N, RF, B16.5
2013 PETRONAS CHEMICALS MTBE SDN BHD SHEET, SS304, 2438 X 1219MM, 10MM
2013 PETRONAS CHEMICALS MTBE SDN BHD
PDHTA2013-‐SO1A1300021 TO FABRICATE COLLAR RING FOR R X 1,2,3,4
2013 PETRONAS CHEMICALS MTBE SDN BHD
PDHTA2013-‐SO1A1300022 TO FABRICATE TEST FLANGE C/W NIPPLE 3/4" X 300#, A105
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2013 PETRONAS CHEMICALS MTBE SDN BHD
PDHTA2013-‐SO2B130010 (MRF1614), TO FABRICATION INSULATION CLIP
2013 PETRONAS CHEMICALS MTBE SDN BHD
PDHTA2013-‐SO2A130023 (MRF1632), TO FABRICATION INSULATION CLIP
2013 CENTRALISED UTILITY FACILITIES, KERTEH RE-‐GASKET @ HP/IP B BYPASS LINE
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD DRAIN VALVE ELBOW NEAR SPV-‐105-‐5
2013 CENTRALISED UTILITY FACILITIES, KERTEH BLINDING JOBS FOR HRSGF PRESERVATION
2013 CENTRALISED UTILITY FACILITIES, KERTEH HYDRAULIC TORQUE WRENCH (HTW)
2013 CENTRALISED UTILITY FACILITIES, KERTEH HTW STEAM LINE
2013 CENTRALISED UTILITY FACILITIES, KERTEH REMOVE & INSTALL CONTROL VALVE
2013 CENTRALISED UTILITY FACILITIES, KERTEH BLIND/ DEBLIND USING HTW
2013 CENTRALISED UTILITY FACILITIES, GEBENG MECHANICAL WORK @ COGEN
2013 CENTRALISED UTILITY FACILITIES, GEBENG
RECTIFY LEAK @ PAC INJECTION LINE. REPLACE CPVC PIPE L/S
2013 CENTRALISED UTILITY FACILITIES, KERTEH
VO TO PERFORM RECTIFICATION LEAK & FLANGE SURFACE FOR PRESSURE VESSEL OF REACTIVATION HEATER AT ASU 2 PLANT
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD
ET-‐0-‐P151AX CASING FABRICATION THREAD REPAIR
2013 CENTRALISED UTILITY FACILITIES, KERTEH LEVEL GAUGE COVER RESURFACE 2ND BATCH
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2013 CENTRALISED UTILITY FACILITIES, KERTEH SIGHT GLASS COVER RESURFACE
2013 CENTRALISED UTILITY FACILITIES, KERTEH
IP/LP LETDOWN C 8" X 600# FLANGE RE-‐SURFACE
2013 CENTRALISED UTILITY FACILITIES, KERTEH TO BUILD JUMPER LINE AT HP GAN
2013 CENTRALISED UTILITY FACILITIES, KERTEH 10"X 2500# HRSG C BLINDING DEBLINDING
2013 CENTRALISED UTILITY FACILITIES, KERTEH HP/IP LETDOWN STATION VALVE LEAK
2013 CENTRALISED UTILITY FACILITIES, KERTEH HHP STEAM LETDOWN BLINDING DEBLINDING
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD
E116 3/4" VALVE & E004AB 4" ELBOW REPLACEMENT
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD BURNER STAGE NOZZLE REPAIR THREAD (6 PCS)
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD ET-‐0-‐F-‐103AB PTLE TUBE PLUGGING
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD ET-‐0-‐F-‐101AB PTLE TUBE PLUGGING
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD ET-‐0-‐F-‐101AB PTLE TUBE PLUGGING
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD ET-‐0-‐F-‐101AB PTLE TUBE PLUGGING
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD HYDRAULIC JACK VESSEL AT POLYETHYLENE
2013 CENTRALISED UTILITY FACILITIES, GEBENG
REPLACEMENT SEAL PLATE AFTER COOLER AT CUF, GEBENG PLANT
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2013 CENTRALISED UTILITY FACILITIES, KERTEH
REPLACEMENT OF VALVE 3/4" X 800# CONTINUOUS GAS LEAK
2013 PETRONAS CHEMICALS MTBE SDN BHD HOT BOLTING WORKS AT MTBE REACTOR AREA
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR P-‐858-‐B/P-‐863, 3" CAISSON PUMP COLUMN CORRODED, P-‐803A/B COMAN DRAIN LINE LEAK, TR-‐A, TR-‐B & TR-‐C HPC/LPC DRAIN PIPING CORRODED MANUAL CASE. (MYJA)
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD LIFTING EQUIPMENT REVALIDATION
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR IGF-‐462 DISCHARGE LINE CLOGGED. (MYGA)
2013 CENTRALISED UTILITY FACILITIES, KERTEH
HRSG-‐B REPLACE LEAK 3" ELBOW AT 121Q1CA-‐1B5B-‐CV BLOW DOWN LINE 1" COGEN PLANT CUF, KERTEH
2013 CENTRALISED UTILITY FACILITIES, KERTEH
HRSG-‐F DEBLINDING WORK 10" X 2500# AT ASU 2 PLANT, KERTEH
2013 PETRONAS CHEMICALS MTBE SDN BHD
FABRICATION & INSTALLATION OF ENCLOSURE FOR D-‐1004 ELBOW LEAK AT PCMTBESB PLANT
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD
SPRING HANGER INSTALLATION AT ETHYLENE PLANT, KERTEH
2013 PETRONAS CHEMICALS MTBE SDN BHD
ENGINEERING, FABRICATION, INSPECTION, TESTING AND DELIVERY OF AIR FINNED COOLER HEAT EXCHANGER FOR PC MTBE TA 2014 ("WORKS") -‐ SMSO/PCMTBE/2013/0152
2013 PETRONAS CHEMICALS MTBE SDN BHD
ENGINEERING, FABRICATION, INSPECTION, TESTING AND DELIVERY OF AIR FINNED COOLER HEAT EXCHANGER (EA 227.1) FOR PC MTBE TA 2014 ("WORKS") -‐ SMSO/PCMTBE/2013/0152(2)
2013 CENTRALISED UTILITY FACILITIES, GEBENG
TO PERFORM SERVICE AND CLEANING AFTER COOLER AT NGU2
2013 CENTRALISED UTILITY FACILITIES, KERTEH
LP/LP LETDOWN BLINDING, DEBLINDING & REMOVE AND INSTALL 3 WAY CONTROL VALVE
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR 8" WITH 1" ARMORWRAP AT LAA PROD DECK M-‐4 (MYLA), 1" CORR'D DIESEL LINE TG610 (MYLA), AIR LINE LEAKING 1" MOD#2 (MYTC), OVERHEAD DISCHARGE LINE BADLY VIBRATES (MYTC), DISCHARGE LINE PARTED (MYTE), 1" MAIN LINE INST AIR PIN HOLE LEAK (MYMB), 1" VENT BADLY CORRODED (MYMA), 4" PINHOLE LEAKING FROM FT671 (MYMA), V-‐610A 2" DRAIN LINE BADLY CORRODED (MYMA), GAS LIFT TEST HEADER MANIFOLD CORRODED (MYMA), WELLHEAD B3 FLOWLINE & VALVE CORRODED (MYMB), SEA WATER LIFT PUMP (MYMA), B-‐18U OP FLOWLINE (MYGB), B-‐22U FLOWLINE W/INJECTION (MYGB), A-‐14L OP FLOWLINE (MYUA) & SPADE 16" X 600#RF FOR V-‐303 ANGSI LINE. (MYTP)
2013 CENTRALISED UTILITY FACILITIES, KERTEH
RECTIFY LEAK FLANGE 10 X 2500 & REPLACE STUD BOLT AT COMPRESSOR HOUSE ASU 2 PLANT
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD TO PERFORM REPAIR EGF FIN BURNER
2013 CENTRALISED UTILITY FACILITIES, KERTEH SUPPLY OF FIRE WATCHER AT CUF, KERTEH
2013 CENTRALISED UTILITY FACILITIES, GEBENG
TO PERFORM WORK FOR ADDITIONAL H-‐BEAM AT COGEN AREA & TO PERFORM REPAIRING DRAINING SPOOL AT NGU2
2013 CENTRALISED UTILITY FACILITIES, GEBENG
HEAT EXCHANGER SUPPORT MODIFICATION AT CUF, GEBENG
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD
TO REPLACE CONCENTRIC REDUCER 1" X 1/2" AT ET-‐0-‐F-‐106, ET-‐0-‐PG-‐106-‐16D
2013 SERI DINAMIK ENGINEERING SDN BHD DESIGN & FABRICATE HYDROTEST FLANGE
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
ENCLOSURE PANEL SURVEY AND TO FABRICATE & SUPPLY ENCLOSURE
2013 HYUNDAI ENGINEERING/ PETRONAS GAS BERHAD PRR2 PIPING ERECTION PROJECT
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD ET-‐0-‐F-‐102 FURNACE TOP ROOF FABRICATION
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD ET-‐0-‐F-‐103 TO REPAIR BURNER CASING WORK
2013 CENTRALISED UTILITY FACILITIES, GEBENG
BFWP RECYCLE LINE UNIT C ELBOW REPLACEMENT
2013 CENTRALISED UTILITY FACILITIES, KERTEH
TO PERFORM RECTIFICATION LEAK AND FLANGE RE-‐SURFACE FOR PRESSURE VESSEL OF REACTIVATION HEATER AT ASU 2 PLANT, CUF KERTEH
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC 3" 150# PUMP ADAPTER
2013 PETRONAS CHEMICALS MTBE SDN BHD EB-‐234 REPLACEMENT PROJECT AT MTBE PLANT
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD ET-‐0-‐F-‐101-‐105 BURNER COVER REPAIR WORK
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD ET-‐0-‐F-‐106 FURNACE TOP ROOF FABRICATION
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR PV-‐150C REDUCER. (MYGD), PSV-‐288A/B WALL LOST AT VENT LINE, TR-‐A GG LUBE OIL COOLER. (MYJA) & V-‐230 BRIDLE AUTO DRAIN LINE. (MYLA)
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD FABRICATION OF 2 SET FURNACE TOP ROOF
2013 PETRONAS CHEMICALS MTBE SDN BHD
RECTIFICATION OF FIREWATER LINE LEAK AT PDH, PLANT (GRE PIPE)
2013 CENTRALISED UTILITY FACILITIES, GEBENG
TO PERFORM SERVICING WORK AND CLEANING AFTER COOLER, AIR COOLER AND CONDENSOR
2013 PETRONAS CHEMICALS MTBE SDN BHD C-‐701 REPLACEMENT AT MTBE PLANT, GEBENG
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2013 CENTRALISED UTILITY FACILITIES, KERTEH
TO BUILD JUMPER LINE FROM HP GAN TO EOG LINE AT CUF, KERTEH
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC FABRICATE HANGER PLATE TV-‐507A ACTUATOR
2013 CENTRALISED UTILITY FACILITIES, GEBENG
REPLACEMENT 2" PIPE SPOOL FOR LINE TANK 5% H2SO4 AT DEMIN BUILDING AREA CUF, GEBENG
2013 CENTRALISED UTILITY FACILITIES, KERTEH
1/2" AIR DRYER LINE AT SI-‐242AB01 A/B/C/D & SI-‐242A01 A/B/C/D AT CUF, KERTEH
2013 CENTRALISED UTILITY FACILITIES, KERTEH
TO BUILD REDUNDANT LINE FOR SERVICE GAN AND BACK UP INSTRUMENT AIR AT CUF, KERTEH
2013 CENTRALISED UTILITY FACILITIES, GEBENG
RECTIFICATION OF SIDE STREAM FILTER AT CUF, GEBENG PLANT
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR A50-‐A6-‐62 NEW LINE, LEAKING DRAIN HEADER, 6" VENT AT ME-‐810, AIR RECEIVER 520 & 526. (MYSA)
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR TWIN AGENT AT EAS & V-‐250 4" INLET GA
2013 PETRONAS CHEMICALS MTBE SDN BHD
MECHANICAL AND PLANT DEFECT RECTIFICATION WORKS DURING PCMTBESB PLANT SHUTDOWN IN MAY 2013
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATION SPOOL FOR A-‐25 & A-‐05 GL FLOWLINE REPLACE. (MYIA)
2013 PETRONAS CHEMICALS MTBE SDN BHD
TO PERFORM TAPPING, CUTTING & WELDING WORKS AT E-‐2004/ E-‐2005 PIPING
2013 TRANSWATER API SDN. BHD FABRICATION OF TEMPORARY SPOOL FOR PCV-‐504
2013 CENTRALISED UTILITY FACILITIES, GEBENG REPLACE 3" CS SPOOL BFW LINE
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR A-‐18 OP, A-‐7L OP, A-‐10 GL, A-‐15 GL FLOWLINE REPLACEMENT. (MYIA) & V-‐610 PRESSURE GAUGE WELDMENT. (MYMA)
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2013 CENTRALISED UTILITY FACILITIES, GEBENG
REPLACE 3" API 5LB SPOOL AT DEMIN PAC LINE (GRE) AT CUF, GEBENG PLANT
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
CORRODED HEADER @ PCV-‐200 & CHANGE OUT CLOGGED HP DRAIN HEADER LINE
2013 EPIC MUSHTARI ENGINEERING
SDN. BHD/ PETRONAS CHEMICALS MTBE SDN BHD
REACTOR OVERHAUL WORK AT PDH PLANT, GEBENG
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD ET-‐0-‐PT-‐404 PIN HOLE LEAK
2013 CENTRALISED UTILITY FACILITIES, KERTEH
REPAIR CRACK AT COLD BOX ASU-‐2 AT CUF, KERTEH
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD ET-‐0-‐F-‐105 TOP ROOF REPAIR
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR M-‐1 INSTRUMENT AIR LEAK. (MYIA)
2013 PETRONAS CHEMICALS MTBE SDN BHD LATE WORK REQUEST FOR PDH PLANT TA 2013
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR B-‐13L (MYGB) & A-‐17U (MYGA) FLOWLINE LEAK
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR B-‐17U WI F/LINE PIN HOLE LEAK, B-‐20U W/INJ F/LINE. (MYGB) & A-‐11U W/INJ F/LINE. (MYGA)
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD
PIPING REPLACEMENT WORK AT JETTY KERTEH PORT
2013 EPIC MUSHTARI ENGINEERING
SDN BHD/ PETRONAS CHEMICALS MTBE SDN BHD
WELDING 8 NOS OF HEATER TUBE AND 10 NOS OF SKIN THERMOCOUPLE
2013 PETRONAS CHEMICALS MTBE SDN BHD
SUPPLY OF PIPES & FITTINGS FOR E-‐3005 PIPING MODIFICATION
2013 CENTRALISED UTILITY FACILITIES, GEBENG
DEFECT RECTIFICATION WORK DURING ZERO STEAM APRIL 2013 AT CUF, GEBENG
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2013 EPIC MUSHTARI ENGINEERING
SDN BHD/ PETRONAS CHEMICALS MTBE SDN BHD
DEFECT RECTIFICATION WORK AT CCR & REACTOR AREA PDH, PLANT
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR P-‐625B FLANGE SPOOL, LRA A-‐24 FWS F/LINE EQUAL AND LRA V-‐610 3" LINE LOG. (MYLR)
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR PALAS GASLIFT PIPING. (MYPA) & THERMOCOUPLE TAPPING FLANGE. (MYMA)
2013 PETRONAS CHEMICALS MTBE SDN BHD
HTW WORK FOR CHECKING CRITICAL JOINT & BOLT TENSIONING BOTTOM CONE CCR SCREEN
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD UT-‐0-‐A-‐521 EGF FIN BURNER REPAIR
2013 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE WELLBAY SECONDARY BEAM REPAIR. (MYTD) & TO FABRICATE SPOOL FOR PCV-‐206 D/S LEAKING VALVE. (MYIA)
2013 PETRONAS CHEMICALS ETHYLENE SDN BHD REPLACE PIPING ET-‐0-‐F-‐105 NEAR SPV-‐105-‐5
2013 M3NERGY JDA SDN BHD SUPPLY AND FABRICATE PIPE SPOOL (FLANGE TO FLANGE REPLACEMENT AT RATU SONGKHLA)
2013 PETRONAS CHEMICALS MTBE SDN BHD
TO REPLACE NOZZLE T1 (36"X300#) AT E-‐2001A/B DURING PDH PLANT TA-‐2013
2013 PETRONAS CHEMICALS MTBE SDN BHD
EMERGENT REPAIR WORK AT D-‐1402 AREA 200 AND U-‐1403 AREA 600 MTBE, PLANT
2013 PETRONAS CHEMICALS MTBE SDN BHD
EMERGENT WORK TO PERFORM REMOVAL, CLEANING, REPAIR AND INSTALLATION OF CCR SCREEN R-‐701 AT MTBE, PLANT
2012 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO FABRICATE & INSTALL ANTENNA MOUNT SUPPORT
2012 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
FABRICATION WORKS FOR WATER INJECTION SYSTEM
2012 CENTRALISED UTILITY FACILITIES, KERTEH
TO REMOVE & RE-‐INSTALL CONTROL VALVE AT COGEN PLANT, CUF KERTEH
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2012 PETRONAS CHEMICALS MTBE SDN BHD
EMERGENT WORK -‐ FIREWATER LEAK AT MTBE, PLANT
2012 PETRONAS CHEMICALS MTBE SDN BHD
PCC OF RED BYPASS, RTD V-‐2023 PROJECT & TIE IN OF PROPYLENE UNLOADING FACILITIES
2012 PETRONAS CHEMICALS MTBE SDN BHD R-‐301A IN-‐SITU CLEANING PHASE 4
2012 CENTRALISED UTILITY FACILITIES, KERTEH
TO PERFORM REPLACEMENT WORK FOR IA AND N2 PIPE LINE AT COLD BOX AREA, ASU 2 PLANT, CUF KERTEH, KEMAMAN, TERENGGANU (PHASE 3)
2012 PETRONAS CHEMICALS MTBE SDN BHD REPAIR CRACK E-‐2001B AT PDH, PLANT
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO OPEN AND CLEANING R-‐301B MAIN MTBE REACTOR -‐ PHASE III
2012 PETRONAS CHEMICALS MTBE SDN BHD TO REPAIR VGS NOZZLE AT PDH, PLANT
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE FOR IBC C-‐14, C-‐15 & C-‐12 GL FLOWLINE IWS. (MYIC)
2012 PETRONAS CHEMICALS MTBE SDN BHD
HYDROTEST WORK IC4 LINE FROM MTBE TO CRYOVAC
2012 PETRONAS CHEMICALS MTBE SDN BHD
DED WORKS FOR THE DUAL ZONE BURNING FOR PDH REGENERATION TOWER
2012 CENTRALISED UTILITY FACILITIES, KERTEH
TO PERFORM REPLACEMENT WORK FOR IA AND N2 PIPE LINE UNDER LIN/LOX TANK
2012 PETRONAS CHEMICALS MTBE SDN BHD
C-‐701 MIDDLE SECTION REPLACEMENT AT MTBE, PLANT
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR SRA-‐4 GAS LIFT F/LINE. (MYSR), SRA-‐1 F/LINE PROD. (MYSR), SDV-‐150A FLANGE. (MYSA), V-‐250 WATER OUTLET PIPING. (MYGA)
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2012 CENTRALISED UTILITY FACILITIES, GEBENG REPAIR E2-‐251B42 AIR COOLER
2012 CENTRALISED UTILITY FACILITIES, KERTEH 4A905 & 4A906 NEW BYPASS LINE
2012 PETRONAS CHEMICALS MTBE SDN BHD
FABRICATION & INTERNAL COATING FOR SMALL VESSEL AT PDH, PLANT
2012 PETRONAS CHEMICALS MTBE SDN BHD
R-‐4902 VESSEL CLEANING & REPAIR AT NOZZLE (2C) STAGE 3
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
JEA/ PSR/ 062, 059, 051, 050 & 066 SPOOL REPLACEMENT AT F-‐435 JERNEH-‐A
2012 ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN
BHD TF-‐0-‐E-‐002 BOG PIPING REPLACEMENT
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR G-‐18 FLOWLINE REPLACEMENT. (MYSG)
2012 PETRONAS CHEMICALS MTBE SDN BHD C-‐701 PARTIAL SHELL REPLACEMENT
2012 CENTRALISED UTILITY FACILITIES, KERTEH 4A905 PCV BYPASS LINE AT CUF, KERTEH
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO OPEN AND CLEANING R-‐301B MAIN MTBE REACTOR -‐ PHASE II
2012 ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN
BHD
ET-‐0V-‐104 (SC-‐104-‐4) WELDING VALVE 1/2" & SAMPLE COOLER COIL
2012 PETRONAS CHEMICALS MTBE SDN BHD
STEAM TRAP PIPE SPOOL RECTIFICATION PROJECT
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR V-‐422 CORR'D PIPING. (MYSA), TO FABRICATE SPOOL FOR A-‐20L. (MYGA), B-‐5L. (MYGB), B-‐14L. (MYGB) & A-‐21U. (MYUA) FLOWLINE (IWS)
2012 PETRONAS CHEMICALS MTBE SDN BHD
RECOVERING DRAINING BFW TO D-‐1007 AT MTBE, PLANT
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2012 PETRONAS CHEMICALS MTBE SDN BHD F-‐302B FILTER REPLACEMENT
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO OPEN AND CLEANING R-‐301A MAIN MTBE REACTOR
2012 PETRONAS CHEMICALS MTBE SDN BHD INSITU HYDROJETTING CLEANING FOR R-‐301A
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE GRAYLOC HUB PUP PIECE, 3"S160, A105N. (MYGA), (MYPA) & (MYUA)
2012 PETRONAS CHEMICALS MTBE SDN BHD TO RECTIFY LEAK AT E-‐3005 A & B
2012 PETRONAS CHEMICALS MTBE SDN BHD INTERNAL COATING FOR P-‐2003 COOLER
2012 CENTRALISED UTILITY FACILITIES, GEBENG TO MAKE GOOD MRO-‐D, DEMIN PLANT
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO REPLACE FIRE WATER LEAK PIPING AT PDH, PLANT (PHASE II)
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO OPEN AND CLEANING R-‐301B MAIN MTBE REACTOR
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR A-‐14L FLOWLINE REPLACEMENT. (MYTA), TO FABRICATE SPOOL FOR PSV-‐895 BY PASS LINE. (MYSA)
2012 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
PRODUCED WATER TREATMENT CAPACITY UPGRADED PROJECT
2012 PETRONAS CHEMICALS MTBE SDN BHD TO RECTIFY LEAK AT E-‐4903 PDH, PLANT
2012 ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN
BHD TO SERVICE CHAIN BLOCK (OVERHEAD CRANE)
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC V-‐110 BRIDGE SPOOL REPLACEMENT (MYTA)
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO REPAIR OF FIRE PROOFING AT AREA-‐200 MTBE, PLANT
2012 PETRONAS CHEMICALS MTBE SDN BHD
CCR EMERGENCY SHUTDOWN JUNE 2012 AT MTBE, PLANT
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO REPLACE STRUCTURE AT EA-‐1703 A/B AT PORT STORAGE, PLANT
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE CORRODED GRATING AT PRODUCTION DECK (MYLR)
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO REPLACE PVC PIPE, FITTINGS & STRAINER AT PC1407
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO REPLACE PIPING AT PC-‐1409A AT AREA-‐400 MTBE, PLANT
2012 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD PERINTIS SHUTDOWN JUNE 2012
2012 FPSO VENTURES SDN BHD CHEMICAL INJECTION PIPE SPOOL MODIFICATION AT FPSO BUNGA KERTAS
2012 PETRONAS CHEMICALS MTBE SDN BHD
FABRICATE & INSTALL SPOOL & BALL VALVE AT Z-‐1001 MTBE, PLANT
2012 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO FABRICATE NEW STEEL PIPE FOR DELUGE & FOAM HEADER
2012 PETRONAS CHEMICALS MTBE SDN BHD
FABRICATION & INSTALLATION OF CONDENSATE DRAIN LINE PIPING AT E-‐3005 PDH, PLANT
2012 PETRONAS CHEMICALS MTBE SDN BHD PPM MINI SHUTDOWN APRIL 2012
2012 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD MANPOWER FOR RIGGING DURING UWILD
2012 ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN
BHD LIFTING EQUIPMENT REVALIDATION (002)
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2012 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO FABRICATE NEW 16" SPOOL STEEL FOR HT COOLER PIPE LINE LOWER PLATFORM IN ENGINE ROOM
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE SPOOL FOR PCP A-‐05/A-‐12 & A-‐15 (MYTA), A-‐19U (MYTA), F-‐11 GL (MYSF) AND F-‐24 GL (MYSF) F/LINE REPLACEMENT
2012 CENTRALISED UTILITY FACILITIES, GEBENG
TO PERFORM AIR COOLER TUBE PLUGGING AT CUF, GEBENG
2012 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD 6" CRUDE LINE REPLACEMENT
2012 CENTRALISED UTILITY FACILITIES, KERTEH MOC LP GAN PIPELINE ASU-‐2
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO REPLACE B-‐7L, B-‐7U, B-‐5L & B-‐5U AT MYMB PLATFORM
2012 CENTRALISED UTILITY FACILITIES, GEBENG TO PERFORM BELLOW REPLACEMENT
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO PERFORM BLASTING ON TX-‐1 INNER SCREEN (LCP) AT PDH PLANT
2012 PETRONAS CHEMICALS MTBE SDN BHD
SUPPLY & INSTALL STEAM TRACING AT EB-‐234 AREA 200
2012 PETRONAS CHEMICALS MTBE SDN BHD RECTIFY FIRE WATER LEAK AT PDH PLANT
2012 PETRONAS CHEMICALS MTBE SDN BHD
RECTIFICATION OF DEFECT ITEMS DURING MTBE PLANT SHUTDOWN 2012
2012 PETRONAS CHEMICALS MTBE SDN BHD
TO FABRICATE STEEL BOX AND TEMPORARY HOSE FOR J701
2012 ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN
BHD HOSE TESTING REVALIDATION (002)
2012 PETRONAS CHEMICALS MTBE SDN BHD
FABRICATION & INSTALLATION OF PIPING FOR NEW ALFA LAVAL (HEAT EXCHANGER) UNIT
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE GRATING FOR CELLAR DECK PLATFORM (MYGD)
2012 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE 2” PIPE SPOOL FOR EQUALIZATION NORTH AND SOUTH HEADER (MYGD)
2012 PETRONAS CHEMICALS MTBE SDN BHD
LOADING & UNLOADING RASCHING RING AT C-‐103
2012 CENTRALISED UTILITY FACILITIES, KERTEH
FABRICATION & INSTALLATION OF LOT VAPORIZER PIPING
2012 PETRONAS CHEMICALS MTBE SDN BHD
2” LINE FOR CONDENSATE DRAIN OUTLET AT AREA 300
2012 PETRONAS CHEMICALS MTBE SDN BHD TEMPORARY PVC LINE TO FURTURE 300
2012 PETRONAS CHEMICALS MTBE SDN BHD 2” METHANOL LINE FOR TRUCK LOADING
2011 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
INSTALLATION OF NEW VSAT ANTENNA AT FPSO PERINTIS
2011 CENTRALISED UTILITY FACILITIES, KERTEH
STRUCTURE REPAIR WORKS FOR CLARIFIER B AT CUF, KERTEH
2011 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
1-‐1/2" BYPASS AT V-‐522 (MYJA), GENERATOR FUEL GAS (MYTD) & PUMP P-‐120B CASING DRAIN VALVE (MYTP) -‐ FABRICATION WORKS
2011 MTBE (M) SDN BHD PO 3 TO PO 4 CPVC LINE REPLACEMENT
2011 MTBE (M) SDN BHD PPM REACTOR WORKS -‐ OPEN & CLEANING
2011 MTBE (M) SDN BHD HEAT TRACING FOR HEVIES BUNKER PIPING
2011 MTBE (M) SDN BHD EB-‐215 FLANGE REFURBISHMENT
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2011 MTBE (M) SDN BHD FABRICATION & INSTALLATION OF HEVIES BUNKER PIPING
2011 EXXONMOBIL EXPLORATION AND PRODUCTION MALAYSIA INC
TO FABRICATE PIPE SPOOL FOR DRAIN LINE HEADER LEAK (MYIA) -‐ EXXONMOBIL
2011 MTBE (M) SDN BHD RECTIFICATION WORK FOR FIRE WATER LINE LEAK
2011 POLYPLASTICS ASIA PACIFIC SDN BHD
HEAT SOURCE EXCHANGE FROM LS TO LLS FOR H.2601, H.2701, H.2801 & H.3801
2011 MTBE (M) SDN BHD FLANGE BUILD UP & RE-‐FACING THE REGENERATION HEATER EB-‐0215
2011 MTBE (M) SDN BHD RE-‐TUBING WORKS FOR U1201B AIR COOLER
2011 MTBE (M) SDN BHD STEAM TRAP INSTALLATION AT PDH
2011 MTBE (M) SDN BHD REMOVE HEATER PLUG AT F-‐2002
2011 CENTRALISED UTILITY FACILITIES, GEBENG
TO REPAIR FLANGE LEAK AT UNIT A DEARATOR HEAD AND VESSEL
2011 MTBE (M) SDN BHD PDH STEAM ISOLATION VALVE REPLACEMENT
2011 MTBE (M) SDN BHD INSTRUMENT AIR PIPING MIGRATION AND NEW N2 HEADER AT PORT STORAGE
2011 MTBE (M) SDN BHD
MECHANICAL AND PLANT DEFECT RECTIFICATION WORKS DURING MMSB/PPMSB PLANT AND PORT STORAGE SHUTDOWN APRIL 2011 (PHASE III)
2011 MTBE (M) SDN BHD PIPING WORKS FOR DIB BOTTOM PROJECT
2011 MTBE (M) SDN BHD EB112 & EB114 BUNDLE REPLACEMENT
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2011 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD PERINTIS SHUTDOWN 2011
2011 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
GAS COMPRESSOR COOLING WATER LINE AND CRACKED PIPE SPOOL MCSW PUMP IN ENGINE ROOM
2011 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD SUPPLY OF MANPOWER – M3NERGY
2011 MTBE (M) SDN BHD RX1 INNER AND OUTER SCREEN MODIFICATION
2011 MTBE (M) SDN BHD
MECHANICAL AND PLANT DEFECT RECTIFICATION WORKS DURING MMSB/PPMSB PLANT AND PORT STORAGE SHUTDOWN APRIL 2011 (PHASE II)
2011 MTBE (M) SDN BHD STEAM LINE REPLACEMENT
2011 MTBE (M) SDN BHD TIE-‐IN FOR PC-‐203AB
2011 MTBE (M) SDN BHD BLINDING DEBLINDING FOR E-‐2001B AT PDH PLANT
2011 MTBE (M) SDN BHD SPOOL FOR PPM PSV INSTALLATION
2011 MTBE (M) SDN BHD SUPPLY OF 3”, 80, A53-‐B, SQ, 12M PIPE
2011 MTBE (M) SDN BHD MTBESD0411 : VALVE TESTING
2011 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD CAMLOCK REPAIR RATU SONGKHLA
2011 MPE LINDUNG SDN BHD WELDING WORKS & NDT MOULD REPAIR
2011 MTBE (M) SDN BHD REPAIR OF C-‐0103 NOZZLE CRACK
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2011 MTBE (M) SDN BHD FABRICATION OF PPM DUMPSTER
2011 MTBE (M) SDN BHD TO PERFORM HPWJ CLEANING FOR IRIS EB-‐902
2011 MTBE (M) SDN BHD INSTALLATION OF FILTER PACKAGES AND INTERFACING FACILITY CONSTRUCTION FOR MTBE PLANT AND PORT STORAGE
2011 MTBE (M) SDN BHD
MECHANICAL AND PLANT DEFECT RECTIFICATION WORKS DURING MMSB/PPMSB PLANT AND PORT STORAGE SHUTDOWN APRIL 2011
2011 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD TO FABRICATE SEA CHEST STRAINER
2011 ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN
BHD HOSE TESTING REVALIDATION (001)
2011 ETHYLENE MALAYSIA SDN BHD/ POLYETHYLENE MALAYSIA SDN
BHD LIFTING EQUIPMENT REVALIDATION (001)
2011 MTBE (M) SDN BHD MTBE SD0411 COOLING WATER BYPASS LINE
2011 MTBE (M) SDN BHD FABRICATION & INSTALLATION OF F-‐4006 PIPING SYSTEM
2010 MTBE (M) SDN BHD PIPING FABRICATION (EPCC FOR REPLACEMENT TURBINE METER WITH CORIOLIS AT MTBE METERING STATION)
2010 NAN ACECON SDN BHD/ PETRONAS GAS BERHAD
FABRICATION & INSTALLATION OF CUF HANDRAIL MONKEY LADDER & TRASH TRAP
2010 MTBE (M) SDN BHD PPM PIPING REPLACEMENT (3/4”-‐HPN-‐40N01-‐D12A)
2010 MTBE (M) SDN BHD FABRICATION & INSTALLATION OF MANUAL DAMPING SPOOL
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD TO FABRICATE SEA CHEST STRAINER
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
SUPPLY MANPOWER & EQUIPMENT FOR THE PARTIAL SHUTDOWN 2010
2010 MTBE (M) SDN BHD PPM TEAL LINE REPLACEMENT
2010 MTBE (M) SDN BHD TO REPLACE PR-‐2”-‐11172-‐17 790 LINE AT PORT STORAGE C/W GLASSFLAKE COATING
2010 SIME ENGINEERING SDN BHD MECHANICAL WORKS FOR SEGAMAT COMPRESSOR STATION EXPANSION PROJECT (SHUTDOWN WORK ON 29 AUGUST 2010)
2010 SIME ENGINEERING SDN BHD
PROVISION OF SUPPLY AND DELIVER MANPOWER, TOOLS, EQUIPMENTS, CONSUMABLES AND MACHINERIES FOR POST SHUTDOWN WORK ACTIVITIES FOR PIPING AND MECHANICAL WORKS AT SEGAMAT COMPRESSOR STATION EXPANSION PROJECT.
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
PRE-‐FABRICATION OF AIR SUPPLY LINE AT MALONG
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD PRE-‐FABRICATION OF SOTONG AIR SUPPLY LINE
2010 SIME ENGINEERING SDN BHD MECHANICAL WORKS FOR SEGAMAT COMPRESSOR STATION EXPANSION PROJECT
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
LOW SEA CHEST 26” ANGLE VALVE REPLACEMENT
2010 MTBE (M) SDN BHD RENTAL OF HPWJ FOR HEX. CLEANING AT MTBE
2010 MTBE (M) SDN BHD D-‐1107, PD-‐1116A/B & T-‐1107 PTFE LINED PIPING REPLACEMENT
2010 MTBE (M) SDN BHD EB-‐115 PIPING MODIFICATION
2010 MTBE (M) SDN BHD FABRICATION & INSTALLATION OF PC-‐206-‐B COVER
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2010 MTBE (M) SDN BHD FABRICATION & INSTALLATION OF SPOOLS FOR PARTICLE SCREENING AT PPM
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
FABRICATION & INSTALLATION OF MALONG WATER INJECTION PIPING (80-‐WI-‐1458)
2010 PETRONAS CARIGALI SDN BHD PROVISION OF CORRODED PIPING REPLACEMENT (MCI REPORT) – ONSHORE FABRICATION AT BEKOK B FOR PCSB-‐PMO
2010 MTBE (M) SDN BHD FABRICATION & INSTALLATION FOR SAMPLING POINT
2010 MTBE (M) SDN BHD HEAT EXCHANGERS, CONDENSERS & COOLER (RENTAL OF HPWJ HEX. CLEANING)
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD PERINTIS IN-‐SITU REFURBISHMENT PHASE 2
2010 MSET ENGINEERING CORPORATION SDN BHD
INSTALLATION OF SEAWATER FINE FILTERS F-‐610A, F-‐610B & F-‐610C AT FPSO PERINTIS
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
INSTALLATION OF Y-‐STRAINER & BASKET STRAINER AT SOTONG PLATFORM
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD MALONG WATER INJECTION PROJECT
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
INSTALLATION OF Y-‐STRAINER & BASKET STRAINER AT MALONG PLATFORM
2010 MTBE (M) SDN BHD 10” PIPING MODIFICATION EB-‐230
2010 MTBE (M) SDN BHD PPM PORTABLE WATER PIPING REPLACEMENT PHASE 2
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
PERINTIS IN-‐SITU REFURBISHMENT PROJECT PHASE 1
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
INSTALLATION OF DECK PLATE ENGINE ROOM PHASE 2
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2010 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD MALONG FUEL GAS LINE PROJECT
2010 MTBE (M) SDN BHD HEAT EXCHANGER, BUNDLES & VESSELS INSTALLATION DURING MTBE MINI SHUTDOWN FEBRUARY 2010
2010 MTBE (M) SDN BHD D-‐105 PIPING REPLACEMENT
2010 MTBE (M) SDN BHD FABRICATION & INSTALLATION OF S-‐107 COOLING COIL
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD INSTALLATION OF COW MACHINE
2009 MTBE (M) SDN BHD PROJECT 1638 EB-‐0902 PIPING INSTALLATION WORKS
2009 MTBE (M) SDN BHD FABRICATION OF NEW PPM STEAM INJECTION PIPE AT MTBE PLANT
2009 MTBE (M) SDN BHD REPLACE 6” DEFECT SPOOL AT PORT STORAGE MTBE PLANT
2009 MTBE (M) SDN BHD T-‐1708 PROPYLENE LINE REPLACEMENT PROJECT
2009 MTBE (M) SDN BHD REPLACE 1” DEFECT PIPE AT PDH SHUTDOWN 2009
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
FABRICATION & INSTALLATION OF 12” COW LINE REPLACEMENT
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
REPLACE BADLY CORRODED DECK PLATFORM ENGINE ROOM MAIN FLOOR
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
FABRICATION & INSTALLATION OF 2 UNITS OF TG-‐AIR GUIDE
2009 ALLIED CALIBRATION ENGINEERING SERVICES SDN BHD
INSTALLATION OF DRY GAS SEAL AND ITS ANCILLARIES PROJECT
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2009 MTBE (M) SDN BHD HEAT EXCHANGER (4NOS) CLEANING AT PORT STORAGE MTBE
2009 MTBE (M) SDN BHD INSTALLATION OF NEW HEAT EXCHANGER AT PORT STORAGE MTBE
2009 MTBE (M) SDN BHD TIE-‐INS POINT FOR CCR O2 ANALYZER PROJECT
2009 MTBE (M) SDN BHD PPM PORTABLE WATER PIPING REPLACEMENT
2009 MTBE (M) SDN BHD D1107 & T1107 PTFE LINE REPLACEMENT
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
ADDITIONAL JOB DURING SHUTDOWN AND POST SHUTDOWN
2009 MTBE (M) SDN BHD PIPING REPLACEMENT PROJECT
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
FABRICATE & INSTALL PIPE SPOOL FOR ANDING PLATFORM
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO FABRICATE & INSTALLATION FOR COW LINE REPLACEMENT
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
INSTALLATION TF7630 TO NEW LOCATION (TRANSFER NEW TRANSFORMER)
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO FABRICATE & INSTALL PIPE SPOOLS FOR MALONG TEST SEPARATOR DRAIN LINE
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO SUPPLY MANPOWER & MATERIALS FOR JOB CODE PD13 & PD12 FOR PERINTIS ANNUAL SHUTDOWN 2009
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD X-‐104 LAUNCHER REPAIR
2009 MTBE (M) SDN BHD RES 1569 – DGS PLATFORM CONSTRUCTION
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO FABRICATE & INSTALL MALONG WATER INJECTION PIPE SPOOLS
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO REPAIR AND FABRICATE NEW DOUBLING RING SC90T2
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD TO REPAIR HYDROCYCLONE LINERS
2009 MTBE (M) SDN BHD BLINDING & DEBLINDING FOR PDH EMERGENCY SHUTDOWN 2009
2009 MTBE (M) SDN BHD FLANGE MACHINING FOR EB-‐215
2009 MTBE (M) SDN BHD BOLT TIGHTENING WORKS FOR PPM EMERGENCY SHUTDOWN 2009
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD CONSTRUCTION WORK PACK CS #4.0
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
CONSTRUCTION WORK PACK FOR SHUTDOWN 2009 – WORK PACK CS #5.0
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD TO REMOVE & INSTALL 26” SEA CHEST VALVE
2009 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
FPSO PERINTIS SHUTDOWN 2009 (FIRE WATER LINE)
2009 MTBE (M) SDN BHD REPLACE 6” DEFECT PIPE (MTBE LINE) AT AREA 600
2009 MTBE (M) SDN BHD WELDING DUPLEX STAINLESS STEEL
2009 MTBE (M) SDN BHD PPM EMERGENCY SHUTDOWN FEBRUARY 2009
2009 MTBE (M) SDN BHD TIE-‐INS WORK DURING MTBE SHUTDOWN FEBRUARY 2009
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2009 MTBE (M) SDN BHD RECTIFICATION OF DEFECT ITEMS DURING MTBE SHUTDOWN FEBRUARY 2009
2009 MTBE (M) SDN BHD REPAIR OF WATER GATE VALVE INTERNAL THREAD BLOCK
2008 MTBE (M) SDN BHD REPAIR OF D-‐1005
2008 MTBE (M) SDN BHD ½” TEAL LINE REPLACEMENT
2008 MTBE (M) SDN BHD ½” & ¾” TEAL LINE DOUBLE BLOCK VALVE INSTALLATION
2008 MTBE (M) SDN BHD 2” & 3” CAUSTIC & OILER PTFE LINE REPLACEMENT
2008 DONALDSON FILTRATION
(MALAYSIA) SDN BHD / MTBE (M) SDN BHD
TO SUPPLY MATERIAL, MANPOWER, EQUIPMENT AND CONSUMABLES (PIPING, CIVIL & E&I WORK) FOR INSTALLATION OF WATER CHILLER FOR WATER COMPOUNDING BATH AT PPMSB
2008 MTBE (M) SDN BHD MMSB/ PPMSB PIPING REPLACEMENT (UTILITY WATER LINE)
2008 MTBE (M) SDN BHD MMSB/ PPMSB PIPING REPLACEMENT (NEUTRALIZATION LINE)
2008 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD INSTALLATION OF BOILER DECK PIPING
2008 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO FABRICATION & INSTALLATION OF BOILER DECK PIPING
2008 PETRONAS GAS BERHAD INSTALLATION OF METHANOL INJECTION CARBON STEEL PIPING AT GPP 5 & GPP 6
2008 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
CONSTRUCTION WORK FEBRUARY 2008 SHUTDOWN OFFSHORE INSTALLATION
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2008 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
CONSTRUCTION WORK FEBRUARY 2008 SHUTDOWN – FABRICATION WORK
2008 MTBE (M) SDN BHD VARIOUS PIPING REPLACEMENT & MACHINING WORKS FOR PLANT MAINTENANCE DURING PLANT TURNAROUND 2008
2008 MTBE (M) SDN BHD VARIOUS RES (PIPE EXTENSION) MTBE TURNAROUND 2008
2008 MTBE (M) SDN BHD FABRICATION & INSTALLATION FOR T1107 DRAIN PIPING REPLACEMENT
2008 MTBE (M) SDN BHD FABRICATION & INSTALLATION FOR CAUSTIC RETURN FROM CCR TO BATTERY LIMIT PIPING REPLACEMENT
2007 FPSO VENTURES SDN BHD
PROVISION WORK TO SUPPLY OF MANPOWER TO CARRYOUT THE MEASUREMENT AND ISOMETRIC DRAWING AS FOLLOW SCOPE OF WORK FOR FSO CENDOR
2007 MTBE (M) SDN BHD FABRICATION & INSTALLATION FOR T1 TO T2 PIPE UPGRADING
2007 MTBE (M) SDN BHD FABRICATION, INSTALLATION, TESTING AND COMMISSIONING FOR UTILITY WATER PIPING A520
2007 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD PRE-‐FABRICATION OF GALLEY PIPING
2007 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
PRE-‐FABRICATION AND INSTALLATION OF CHAIN ROLLER AT FSO PUTERI CAKERAWALA
2007 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
FABRICATION, INSTALLATION, TESTING AND COMMISSIONING OF PIPING AND STRUCTURE FOR FPSO PERINTIS SHUTDOWN 2007
2007 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
SUPPLY OF MANPOWER, EQUIPMENT, TOOLS AND CONSUMABLES FOR PERINTIS SHUTDOWN 2007
2007 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
SITE SURVEY & STRINGING AND PREPARATION OF NEW AND DEMOLITION DRAWING
2007 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO SUPPLY MANPOWER, TOOLS AND CONSUMABLES TO PERFORM BLASTING & PRIMER AND PIPE BEND
02/05/2014
LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE)
YEAR CLIENT PROJECT
2007 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
TO PROVIDE MANPOWER, EQUIPMENT, TOOLS AND CONSUMABLES FOR FABRICATION OF PIPE SPOOLS (ONSHORE)
2006 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
FABRICATION OF NEW P-‐600 DISCHARGE LINE SPOOLS FOR WATER INJECTION PIPING
2006 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
SERVICING OF PRESSURE SAFETY RELIEF VALVE FOR DECK BOILER
2006 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
FABRICATION OF PIPE SPOOL FOR METERING CRUDE OIL FACILITIES
2006 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD SERVICING OF 12” GLOBE VALVE PROJECT
2006 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
SERVICES & REPAIR OF LAUNCHER DOOR PROJECT
2006 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
CHEMICAL CLEANING & HYDROTEST HYDRAULIC PIPING
2006 M3NERGY FPSO PERINTIS SDN BHD / PETRONAS CARIGALI SDN
BHD
FABRICATION OF 4” 6” AND 8” DELUGE PIPING SPOOLS
top related