list!of!completed!projects:!fabrication,!installation!&!maintenance! …€¦ ·  ·...

32
02/05/2014 LIST OF COMPLETED PROJECTS: FABRICATION, INSTALLATION & MAINTENANCE (ONSHORE & OFFSHORE) YEAR CLIENT PROJECT 2015 PETRONAS CHEMICALS MTBE (PDH) SDN BHD SUPPLY OF MANPOWER, EQUIPMENT & CONSUMABLE FOR HYDRAULIC TORQUE WRENCH WORK AT REACTOR AREA PDH PLANT 2015 PETRONAS CHEMICALS MTBE SDN BHD RECTIFY LEAK / REPAIR SHELL CRACK AT EB 201 A MTBE PLANT 2015 PETRONAS CHEMICALS MTBE SDN BHD TO RECTIFY LEAK AT EB224 FOR MTBE PLANT 2015 PETRONAS CHEMICALS MTBE SDN BHD TO RECTIFY LEAK D 218 AT MTBE PLANT 2015 DAYA PROFFSCORP SDN BHD REPLACE CONE SECTION & PERFORM TIBE LEAK TEST AT EA 227 A (BUNDLE NO. 9) MTBE PLANT 2015 PETRONAS CHEMICALS MTBE SDN BHD SUPPLY OF MATERIAL FOR MTBE SD JAN 2015 2015 PETRONAS CHEMICALS MTBE SDN BHD HTW FOR CRITICAL JOINT INSPECTION 2015 DAYA PROFFSCORP SDN BHD EXCAVATION WORK FOR FOAM LINE INSPECTION AT MTBE PLANT 2015 PETRONAS CHEMICALS MTBE SDN BHD LIFTING EQUIPMENT REVALIDATION01 (MTBE) 2015 PETRONAS CHEMICALS MTBE SDN BHD GUILLOTINE DOOR REPAIR WORKS AT B1004 2015 PETRONAS CHEMICALS MTBE SDN BHD TO PERFORM LEAK TEST & REPAIR WORKS AT EB232 2015 PETRONAS CHEMICALS MTBE SDN BHD TO RECTIFY UNDERGROUND FIREWATER LINE LEAK AT PCMTBE NEAR TANK T1101 B 2015 ZULKIFLI NGAH ENGINEERING SDN BHD SUPPLY OF PTFE LINED PIPE FOR PC702A&B AND D1107 2015 PCG, OPTIMAL CHEMICALS PLANT TO PROVIDE REPAIR WORKS FOR SECONDARY QUENCH EXCHANGER E1322

Upload: buiphuc

Post on 17-May-2018

223 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2015  PETRONAS  CHEMICALS  MTBE  

(PDH)  SDN  BHD  SUPPLY  OF  MANPOWER,  EQUIPMENT  &  CONSUMABLE  FOR  HYDRAULIC  TORQUE  WRENCH  WORK  AT  REACTOR  AREA  PDH  PLANT  

2015   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

RECTIFY  LEAK  /  REPAIR  SHELL  CRACK  AT  EB  201  A  MTBE  PLANT  

2015   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  RECTIFY  LEAK  AT  EB224  FOR  MTBE  PLANT  

2015   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  RECTIFY  LEAK  D  218  AT  MTBE  PLANT  

2015   DAYA  PROFFSCORP  SDN  BHD   REPLACE  CONE  SECTION  &  PERFORM  TIBE  LEAK  TEST  AT  EA  227  A  (BUNDLE  NO.  9)  MTBE  PLANT  

2015   PETRONAS  CHEMICALS  MTBE  SDN  BHD   SUPPLY  OF  MATERIAL  FOR  MTBE  SD  JAN  2015  

2015   PETRONAS  CHEMICALS  MTBE  SDN  BHD   HTW  FOR  CRITICAL  JOINT  INSPECTION  

2015   DAYA  PROFFSCORP  SDN  BHD   EXCAVATION  WORK  FOR  FOAM  LINE  INSPECTION  AT  MTBE  PLANT  

2015   PETRONAS  CHEMICALS  MTBE  SDN  BHD   LIFTING  EQUIPMENT  REVALIDATION-­‐01  (MTBE)  

2015   PETRONAS  CHEMICALS  MTBE  SDN  BHD   GUILLOTINE  DOOR  REPAIR  WORKS  AT  B1004  

2015   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  PERFORM  LEAK  TEST  &  REPAIR  WORKS  AT  EB-­‐232      

2015   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  RECTIFY  UNDERGROUND  FIREWATER  LINE  LEAK  AT  PCMTBE  NEAR  TANK  T1101  B  

2015   ZULKIFLI  NGAH  ENGINEERING  SDN  BHD  

SUPPLY  OF  PTFE  LINED  PIPE  FOR  PC702A&B  AND  D1107  

2015   PCG,  OPTIMAL  CHEMICALS  PLANT   TO  PROVIDE  REPAIR  WORKS  FOR  SECONDARY  QUENCH  EXCHANGER  E1322  

Page 2: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2015    

PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  SERVICE  PSV  FOR  MTBE  

2015   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

SERVICE  PRESSURE  SAFETY  VALVE  ¾  (S/N  91/08205  &  S/N  620820093)  

2015   PETRONAS  CHEMICALS  MTBE  (PDH)  SDN  BHD  

CRITICAL  JOINT  INSPECTION  AND  RETIGHTENING  PROJECT  

2015   PETRONAS  CHEMICALS  MTBE  (PDH)  SDN  BHD  

SERVICE  PRESSURE  SAFETY  VALVE  1  ½”  X  2”  (S/N  PB16273)  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  PERFORM  BOX  UP  &  DEBLINDING  WORKS  FOR  EA-­‐117  

2014   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

REPLACE  PIPE  SPOOL  AT  COLD  BOX  AREA  AT  CUF  KERTEH  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  FABRICATE  PIPE  SUPPORT  FOR  3"  PIPE  C/W  U-­‐BOLT  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   F-­‐102  ROOF  FABRICATE  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   F-­‐102  HEARTH  BURNER  REPAIR  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   12"  X  150#  BUTTERFLY  VALVE,  EXTEND  BONNET  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   PLATE  SHEET,  SS304,  8FT  X  4FT  X  45MM  THK  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  FABRICATE  POONTON  AND  PERFORM  LEAK  TEST  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  FABRICATE  NUT  PLUG  AS  PER  SAMPLE  BUT  IN  MATERIAL  SS304  

2014   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

EMERGENT  WORK  AT  HRSG-­‐F  STEAM  BOILER  REPAIR  

Page 3: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2014   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  V-­‐130  CONDENSATES  DRAIN  LINE.  (MYLR)  &  WH-­‐A13-­‐INLET  &  OUTLET/  WH-­‐A17  

2014   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  V-­‐110  CHEMICAL  INJECTION  POINT  LEAKING,  BYPASS  HEADER  MODIFICATION  14",  SDV/XY  253B  EQUALIZING.  (MYTP)  &  OD  CAISSON  WILDEN  PUMP.  (MYSH)  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  FABRICATE  TEST  RING  FOR  KC-­‐201  TEST  RING  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   FABRICATE  BLIND  FLANGE  2”  X  150#  A105  

2014   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

REPLACE  UPVC  PIPE  SPOOL  AT  DEMIN  WATER  PLANT  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  REPLACE  FLANGE  FOR  TUBE  SIDE  EB-­‐0704.  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

REPLACE  UNDERGROUND  FIREWATER  LINE  AT  AREA  400  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  FABRICATE  1-­‐1/2"  PTFE  LINED  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  REPAIR/  FABRICATE  LOADING  LINE  AT  T-­‐201  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   STEAM  HEADER  MODIFICATION  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   HOT  WORK  FOR  IPF  PROJECT  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

BOLT  CHECKING  AND  TIGHTENING  USING  HTW  MACHINE  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET  TOP  ROOF  REPLACEMENT  PROJECT  

2014   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

PROJECT  PTFE  UPVC  PIPE  FLANGE  CRACK  COOLING  WATER  ACID  LINE  

Page 4: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   MTBETA14:  C0103  FABRICATE  MONEL  SLEEVE  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   MTBETA14:  TO  FABRICATE  PTFE  LINED  CS  

2014  NEWWIN  ENGINEERING  PAKA  SDN  

BHD/  PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  PERFORM  MECHANICAL  AND  RIGGING  WORKS  AT  R-­‐301B  AREA  300  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   LIFTING  EQUIPMENT  REVALIDATION  -­‐  3  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

SUPPLY  OF  MANPOWER,  EQUIPMENT  &  CONSUMABLE  FOR  HYDRAULIC  TORQUE  WRENCH  WORK  AT  MTBE  PLANT  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   MTBETA14:EB-­‐0703.1  FABRICATE  NEW  FLANGE  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   REPLACEMENT  OF  3  NOS  OF  HEATER  TUBE  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   SPRING  HANGER  REPLACEMENT  

2014   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

FABRICATE,  INSTALL  &  REMOVE  TEMPORARY  PIPE  SPOOL  FOR  BLOWING  ACTIVITIES  AT  ASU  2  PLANT  CUF,  KERTEH  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   FABRICATION  OF  COOPER  TIN  BAR  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   LIFTING  EQUIPMENT  REVALIDATION  -­‐  2  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   NOZZLE  FLANGE  RESURFACING  4"  X  300#  

2014   CENTRALISED  UTILITY  FACILITIES,  KERTEH   TO  REPLACE  COOLING  WATER  ACID  LINE  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

CATALYST  TRANSFER  PIPE  REPLACEMENT  AT  OLEFLEX  REACTOR  1,2,3  

Page 5: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   TO  SUPPLY  FLEXIBLE  HOSE  1”  AT  ETHYLENE  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD  

SPRING  HANGER  REPLACEMENT  &  INSTALLATION  FOR  CH07,  CH08,  CH09  &  CH10  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   EA-­‐227  &  CLEAN  FLARING  PIPING  TIE-­‐IN  PROJECT  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  INSTALL  NEW  TIE-­‐IN  FOR  LEMON  GRASS  PROJECT  AT  PORT  STORAGE  

2014   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   LIFTING  EQUIPMENT  REVALIDATION  

2014   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  BYPASS  ATM  VENT  LINE.  (MYGA)  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

PIPING  &  INSTRUMENTATION  UPGRADE  WORK  FOR  MTBE  PLANT  

2014   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  REPLACE  T04  FRP  TANK  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

EMERGENT  WORK  LP  STEAM  HEADER  (REPAIR  PIPE  &  INSTALL  TEMPORARY  SUPPORT    &  TO  FABRICATE  TEMPORARY  DRAIN  LINE  AT  STEAM  HEADER)  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  V-­‐875  2"  PIPING  FROM  PSV-­‐875  TO  18"  VENT  HEADER  CORRODED.  (MYJA),  TO  FABRICATE  SPOOL  FOR  A-­‐15L,  SLOT-­‐7  OP  FLOWLINE.  (MYUA)  &  TO  FABRICATE  SPOOL  FOR  H-­‐04,  SLOT-­‐10  GAS  LIFT  FLOWLINE.  (MYSH)  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   AIR  FILTER  MODIFICATION  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  FABRICATE  S-­‐107  TO  INSTALL  THE  COOLING  COIL  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   URGENT  WORK  

Page 6: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

HYDRAULIC  BOLT  TENSIONING  &  BOLT  TORQUING  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   FIN  BURNER  2  PCS  REPAIR  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

VALVE,  GA,  TH,  MSS  MATERIAL  SP80,  1"  NPTF,  CL150,  BRZ  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

FLANGE,  BL,  14",  300#,    MATERIAL  A105N,  RF,  B16.5  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

ELBOW,  BW,  8",  30,  WPB  MATERIAL,  90  DEG.,  LR,  SMLS  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   PIPE  SPOOL  MODIFICATION  OF  FE-­‐2784  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TEE,  EQ.,  BW,  2.1/2",  40,  MATERIAL  CS,  SMLS  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

GASKET,  SW,  32"  150,  B,  MATERIAL  316L,  GRP,  316L,  CS  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   EMERGENT  WORK  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   EMERGENT  WORK  INSTRUMENT  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   BLIND,  SPADE,  2"  150#,  6MM,  CS,  FF,  B16,  5  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   FABRICATE  END  CAP  FOR  PSV-­‐6072  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   FABRICATE  INTERNAL  FLANGE,  2"  NB  SCH.  105  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  FABRICATE  PLUG  TUBE  

Page 7: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

FABRICATE  PLUG  TUBE  OD  8MM  X  12MM  X  18MM  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  FABRICATE  INSPECTION  WINDOW  CHANGE  HEATER  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   FABRICATE  PUZZLE  PLATE  FTISSENER  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

FABRICATE  PLUG  TUBE  OD  8MM  X  12MM  X  18MM,  B7  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

36"  X  300/600#  SOCW  FLANGE  SCH.  80  RFFE  ASTM  A105  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

FABRICATE  EXCHANGE  PLUG  15MM,  B7  10PCS  &  NIPPLE  1/2",  100MM(L)  THREAD,  B7  30  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   BLIND,  SPADE,  14"  300#,  10MM,  CS,  FF,  B16,5  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

PDHTA2013-­‐SO1Z130006,  TO  FABRICATE  INSULATION  CLIP  (SAMPLE  A  -­‐  200  PCS)  (SAMPLE  B  -­‐  200  PCS)  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   FLANGE,  BL,  3",  300#,  A105N,  RF,  B16.5  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   PIPE,  22",  30,  5L-­‐B,  SMLS,  BE  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   FLANGE,  BL,  3",  300#,  A105N,  RF,  B16.5  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   SHEET,  SS304,  2438  X  1219MM,  10MM  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

PDHTA2013-­‐SO1A1300021  TO  FABRICATE  COLLAR  RING  FOR  R  X  1,2,3,4  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

PDHTA2013-­‐SO1A1300022  TO  FABRICATE  TEST  FLANGE  C/W  NIPPLE  3/4"  X  300#,  A105  

Page 8: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

PDHTA2013-­‐SO2B130010  (MRF1614),  TO  FABRICATION  INSULATION  CLIP  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

PDHTA2013-­‐SO2A130023  (MRF1632),  TO  FABRICATION  INSULATION  CLIP  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   RE-­‐GASKET  @  HP/IP  B  BYPASS  LINE  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   DRAIN  VALVE  ELBOW  NEAR  SPV-­‐105-­‐5  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   BLINDING  JOBS  FOR  HRSGF  PRESERVATION  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   HYDRAULIC  TORQUE  WRENCH  (HTW)  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   HTW  STEAM  LINE  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   REMOVE  &  INSTALL  CONTROL  VALVE  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   BLIND/  DEBLIND  USING  HTW  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG   MECHANICAL  WORK  @  COGEN  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

RECTIFY  LEAK  @  PAC  INJECTION  LINE.  REPLACE  CPVC  PIPE  L/S  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

VO  TO  PERFORM  RECTIFICATION  LEAK  &  FLANGE  SURFACE  FOR  PRESSURE  VESSEL  OF  REACTIVATION  HEATER  AT  ASU  2  PLANT  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD  

ET-­‐0-­‐P151AX  CASING  FABRICATION  THREAD  REPAIR  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   LEVEL  GAUGE  COVER  RESURFACE  2ND  BATCH  

Page 9: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   SIGHT  GLASS  COVER  RESURFACE  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

IP/LP  LETDOWN  C  8"  X  600#  FLANGE  RE-­‐SURFACE  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   TO  BUILD  JUMPER  LINE  AT  HP  GAN  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   10"X  2500#  HRSG  C  BLINDING  DEBLINDING  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   HP/IP  LETDOWN  STATION  VALVE  LEAK  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   HHP  STEAM  LETDOWN  BLINDING  DEBLINDING  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD  

E116  3/4"  VALVE  &  E004AB  4"  ELBOW  REPLACEMENT  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   BURNER  STAGE  NOZZLE  REPAIR  THREAD  (6  PCS)  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET-­‐0-­‐F-­‐103AB  PTLE  TUBE  PLUGGING  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET-­‐0-­‐F-­‐101AB  PTLE  TUBE  PLUGGING  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET-­‐0-­‐F-­‐101AB  PTLE  TUBE  PLUGGING  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET-­‐0-­‐F-­‐101AB  PTLE  TUBE  PLUGGING  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   HYDRAULIC  JACK  VESSEL  AT  POLYETHYLENE  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

REPLACEMENT  SEAL  PLATE  AFTER  COOLER  AT  CUF,  GEBENG  PLANT  

Page 10: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

REPLACEMENT  OF  VALVE  3/4"  X  800#  CONTINUOUS  GAS  LEAK  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   HOT  BOLTING  WORKS  AT  MTBE  REACTOR  AREA  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  P-­‐858-­‐B/P-­‐863,  3"  CAISSON  PUMP  COLUMN  CORRODED,  P-­‐803A/B  COMAN  DRAIN  LINE  LEAK,  TR-­‐A,  TR-­‐B  &  TR-­‐C  HPC/LPC  DRAIN  PIPING  CORRODED  MANUAL  CASE.  (MYJA)  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   LIFTING  EQUIPMENT  REVALIDATION  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  IGF-­‐462  DISCHARGE  LINE  CLOGGED.  (MYGA)  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

HRSG-­‐B  REPLACE  LEAK  3"  ELBOW  AT  121Q1CA-­‐1B5B-­‐CV  BLOW  DOWN  LINE  1"  COGEN  PLANT  CUF,  KERTEH  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

HRSG-­‐F  DEBLINDING  WORK  10"  X  2500#  AT  ASU  2  PLANT,  KERTEH  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

FABRICATION  &  INSTALLATION  OF  ENCLOSURE  FOR  D-­‐1004  ELBOW  LEAK  AT  PCMTBESB  PLANT  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD  

SPRING  HANGER  INSTALLATION  AT  ETHYLENE  PLANT,  KERTEH  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

ENGINEERING,  FABRICATION,  INSPECTION,  TESTING  AND  DELIVERY  OF  AIR  FINNED  COOLER  HEAT  EXCHANGER  FOR  PC  MTBE  TA  2014  ("WORKS")  -­‐  SMSO/PCMTBE/2013/0152        

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

ENGINEERING,  FABRICATION,  INSPECTION,  TESTING  AND  DELIVERY  OF  AIR  FINNED  COOLER  HEAT  EXCHANGER  (EA  227.1)  FOR  PC  MTBE  TA  2014  ("WORKS")  -­‐  SMSO/PCMTBE/2013/0152(2)  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

TO  PERFORM  SERVICE  AND  CLEANING  AFTER  COOLER  AT  NGU2  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

LP/LP  LETDOWN  BLINDING,  DEBLINDING  &  REMOVE  AND  INSTALL  3  WAY  CONTROL  VALVE  

Page 11: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  8"  WITH  1"  ARMORWRAP  AT  LAA  PROD  DECK  M-­‐4  (MYLA),  1"  CORR'D  DIESEL  LINE  TG610  (MYLA),  AIR  LINE  LEAKING  1"  MOD#2  (MYTC),  OVERHEAD  DISCHARGE  LINE  BADLY  VIBRATES  (MYTC),  DISCHARGE  LINE  PARTED  (MYTE),  1"  MAIN  LINE  INST  AIR  PIN  HOLE  LEAK  (MYMB),  1"  VENT  BADLY  CORRODED  (MYMA),  4"  PINHOLE  LEAKING  FROM  FT671  (MYMA),  V-­‐610A  2"  DRAIN  LINE  BADLY  CORRODED  (MYMA),  GAS  LIFT  TEST  HEADER  MANIFOLD  CORRODED  (MYMA),  WELLHEAD  B3  FLOWLINE  &  VALVE  CORRODED  (MYMB),  SEA  WATER  LIFT  PUMP  (MYMA),  B-­‐18U  OP  FLOWLINE  (MYGB),  B-­‐22U  FLOWLINE  W/INJECTION  (MYGB),  A-­‐14L  OP  FLOWLINE  (MYUA)  &  SPADE  16"  X  600#RF  FOR  V-­‐303  ANGSI  LINE.  (MYTP)  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

RECTIFY  LEAK  FLANGE  10  X  2500  &  REPLACE  STUD  BOLT  AT  COMPRESSOR  HOUSE  ASU  2  PLANT  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   TO  PERFORM  REPAIR  EGF  FIN  BURNER  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH   SUPPLY  OF  FIRE  WATCHER  AT  CUF,  KERTEH  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

TO  PERFORM  WORK  FOR  ADDITIONAL  H-­‐BEAM  AT  COGEN  AREA  &  TO  PERFORM  REPAIRING  DRAINING  SPOOL  AT  NGU2  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

HEAT  EXCHANGER  SUPPORT  MODIFICATION  AT  CUF,  GEBENG  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD  

TO  REPLACE  CONCENTRIC  REDUCER  1"  X  1/2"  AT  ET-­‐0-­‐F-­‐106,  ET-­‐0-­‐PG-­‐106-­‐16D  

2013   SERI  DINAMIK  ENGINEERING  SDN  BHD   DESIGN  &  FABRICATE  HYDROTEST  FLANGE  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

ENCLOSURE  PANEL  SURVEY  AND  TO  FABRICATE  &  SUPPLY  ENCLOSURE  

2013   HYUNDAI  ENGINEERING/  PETRONAS  GAS  BERHAD   PRR2  PIPING  ERECTION  PROJECT  

Page 12: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET-­‐0-­‐F-­‐102  FURNACE  TOP  ROOF  FABRICATION  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET-­‐0-­‐F-­‐103  TO  REPAIR  BURNER  CASING  WORK  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

BFWP  RECYCLE  LINE  UNIT  C  ELBOW  REPLACEMENT  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

TO  PERFORM  RECTIFICATION  LEAK  AND  FLANGE  RE-­‐SURFACE  FOR  PRESSURE  VESSEL  OF  REACTIVATION  HEATER  AT  ASU  2  PLANT,  CUF  KERTEH  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC   3"  150#  PUMP  ADAPTER  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   EB-­‐234  REPLACEMENT  PROJECT  AT  MTBE  PLANT  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET-­‐0-­‐F-­‐101-­‐105  BURNER  COVER  REPAIR  WORK  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET-­‐0-­‐F-­‐106  FURNACE  TOP  ROOF  FABRICATION  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  PV-­‐150C  REDUCER.  (MYGD),  PSV-­‐288A/B  WALL  LOST  AT  VENT  LINE,  TR-­‐A  GG  LUBE  OIL  COOLER.  (MYJA)  &  V-­‐230  BRIDLE  AUTO  DRAIN  LINE.  (MYLA)  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   FABRICATION  OF  2  SET  FURNACE  TOP  ROOF  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

RECTIFICATION  OF  FIREWATER  LINE  LEAK  AT  PDH,  PLANT  (GRE  PIPE)  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

TO  PERFORM  SERVICING  WORK  AND  CLEANING  AFTER  COOLER,  AIR  COOLER  AND  CONDENSOR  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   C-­‐701  REPLACEMENT  AT  MTBE  PLANT,  GEBENG  

Page 13: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

TO  BUILD  JUMPER  LINE  FROM  HP  GAN  TO  EOG  LINE  AT  CUF,  KERTEH  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC   FABRICATE  HANGER  PLATE  TV-­‐507A  ACTUATOR  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

REPLACEMENT  2"  PIPE  SPOOL  FOR  LINE  TANK  5%  H2SO4  AT  DEMIN  BUILDING  AREA  CUF,  GEBENG  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

1/2"  AIR  DRYER  LINE  AT  SI-­‐242AB01  A/B/C/D  &  SI-­‐242A01  A/B/C/D  AT  CUF,  KERTEH  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

TO  BUILD  REDUNDANT  LINE  FOR  SERVICE  GAN  AND  BACK  UP  INSTRUMENT  AIR  AT  CUF,  KERTEH  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

RECTIFICATION  OF  SIDE  STREAM  FILTER  AT  CUF,  GEBENG  PLANT  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  A50-­‐A6-­‐62  NEW  LINE,  LEAKING  DRAIN  HEADER,  6"  VENT  AT  ME-­‐810,  AIR  RECEIVER  520  &  526.  (MYSA)  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  TWIN  AGENT  AT  EAS  &  V-­‐250  4"  INLET  GA  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

MECHANICAL  AND  PLANT  DEFECT  RECTIFICATION  WORKS  DURING  PCMTBESB  PLANT  SHUTDOWN  IN  MAY  2013  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATION  SPOOL  FOR  A-­‐25  &  A-­‐05  GL  FLOWLINE  REPLACE.  (MYIA)  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  PERFORM  TAPPING,  CUTTING  &  WELDING  WORKS  AT  E-­‐2004/  E-­‐2005  PIPING  

2013   TRANSWATER  API  SDN.  BHD   FABRICATION  OF  TEMPORARY  SPOOL  FOR  PCV-­‐504  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG   REPLACE  3"  CS  SPOOL  BFW  LINE  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  A-­‐18  OP,  A-­‐7L  OP,  A-­‐10  GL,  A-­‐15  GL  FLOWLINE  REPLACEMENT.  (MYIA)  &  V-­‐610  PRESSURE  GAUGE  WELDMENT.  (MYMA)  

Page 14: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

REPLACE  3"  API  5LB  SPOOL  AT  DEMIN  PAC  LINE  (GRE)  AT  CUF,  GEBENG  PLANT  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

CORRODED  HEADER  @  PCV-­‐200  &  CHANGE  OUT  CLOGGED  HP  DRAIN  HEADER  LINE  

2013  EPIC  MUSHTARI  ENGINEERING  

SDN.  BHD/  PETRONAS  CHEMICALS  MTBE  SDN  BHD  

REACTOR  OVERHAUL  WORK  AT  PDH  PLANT,  GEBENG  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET-­‐0-­‐PT-­‐404  PIN  HOLE  LEAK  

2013   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

REPAIR  CRACK  AT  COLD  BOX  ASU-­‐2  AT  CUF,  KERTEH  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   ET-­‐0-­‐F-­‐105  TOP  ROOF  REPAIR  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  M-­‐1  INSTRUMENT  AIR  LEAK.  (MYIA)  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD   LATE  WORK  REQUEST  FOR  PDH  PLANT  TA  2013  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  B-­‐13L  (MYGB)  &  A-­‐17U  (MYGA)  FLOWLINE  LEAK  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  B-­‐17U  WI  F/LINE  PIN  HOLE  LEAK,  B-­‐20U  W/INJ  F/LINE.  (MYGB)  &  A-­‐11U  W/INJ  F/LINE.  (MYGA)  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD  

PIPING  REPLACEMENT  WORK  AT  JETTY  KERTEH  PORT  

2013  EPIC  MUSHTARI  ENGINEERING  

SDN  BHD/  PETRONAS  CHEMICALS  MTBE  SDN  BHD  

WELDING  8  NOS  OF  HEATER  TUBE  AND  10  NOS  OF  SKIN  THERMOCOUPLE  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

SUPPLY  OF  PIPES  &  FITTINGS  FOR  E-­‐3005  PIPING  MODIFICATION  

2013   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

DEFECT  RECTIFICATION  WORK  DURING  ZERO  STEAM  APRIL  2013  AT  CUF,  GEBENG  

Page 15: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2013  EPIC  MUSHTARI  ENGINEERING  

SDN  BHD/  PETRONAS  CHEMICALS  MTBE  SDN  BHD  

DEFECT  RECTIFICATION  WORK  AT  CCR  &  REACTOR  AREA  PDH,  PLANT  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  P-­‐625B  FLANGE  SPOOL,  LRA  A-­‐24  FWS  F/LINE  EQUAL  AND  LRA  V-­‐610  3"  LINE  LOG.  (MYLR)  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  PALAS  GASLIFT  PIPING.  (MYPA)  &  THERMOCOUPLE  TAPPING  FLANGE.  (MYMA)  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

HTW  WORK  FOR  CHECKING  CRITICAL  JOINT  &  BOLT  TENSIONING  BOTTOM  CONE  CCR  SCREEN  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   UT-­‐0-­‐A-­‐521  EGF  FIN  BURNER  REPAIR  

2013   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  WELLBAY  SECONDARY  BEAM  REPAIR.  (MYTD)  &  TO  FABRICATE  SPOOL  FOR  PCV-­‐206  D/S  LEAKING  VALVE.  (MYIA)  

2013   PETRONAS  CHEMICALS  ETHYLENE  SDN  BHD   REPLACE  PIPING  ET-­‐0-­‐F-­‐105  NEAR  SPV-­‐105-­‐5  

2013   M3NERGY  JDA  SDN  BHD   SUPPLY  AND  FABRICATE  PIPE  SPOOL  (FLANGE  TO  FLANGE  REPLACEMENT  AT  RATU  SONGKHLA)  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  REPLACE  NOZZLE  T1  (36"X300#)  AT  E-­‐2001A/B  DURING  PDH  PLANT  TA-­‐2013  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

EMERGENT  REPAIR  WORK  AT  D-­‐1402  AREA  200  AND  U-­‐1403  AREA  600  MTBE,  PLANT  

2013   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

EMERGENT  WORK  TO  PERFORM  REMOVAL,  CLEANING,  REPAIR  AND  INSTALLATION  OF  CCR  SCREEN  R-­‐701  AT  MTBE,  PLANT  

2012  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  FABRICATE  &  INSTALL  ANTENNA  MOUNT  SUPPORT  

2012  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

FABRICATION  WORKS  FOR  WATER  INJECTION  SYSTEM  

2012   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

TO  REMOVE  &  RE-­‐INSTALL  CONTROL  VALVE  AT  COGEN  PLANT,  CUF  KERTEH  

Page 16: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

EMERGENT  WORK  -­‐  FIREWATER  LEAK  AT  MTBE,  PLANT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

PCC  OF  RED  BYPASS,  RTD  V-­‐2023  PROJECT  &  TIE  IN  OF  PROPYLENE  UNLOADING  FACILITIES  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   R-­‐301A  IN-­‐SITU  CLEANING  PHASE  4  

2012   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

TO  PERFORM  REPLACEMENT  WORK  FOR  IA  AND  N2  PIPE  LINE  AT  COLD  BOX  AREA,  ASU  2  PLANT,  CUF  KERTEH,  KEMAMAN,  TERENGGANU  (PHASE  3)  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   REPAIR  CRACK  E-­‐2001B  AT  PDH,  PLANT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  OPEN  AND  CLEANING  R-­‐301B  MAIN  MTBE  REACTOR  -­‐  PHASE  III  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  REPAIR  VGS  NOZZLE  AT  PDH,  PLANT  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  FOR  IBC  C-­‐14,  C-­‐15  &  C-­‐12  GL  FLOWLINE  IWS.  (MYIC)  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

HYDROTEST  WORK  IC4  LINE  FROM  MTBE  TO  CRYOVAC  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

DED  WORKS  FOR  THE  DUAL  ZONE  BURNING  FOR  PDH  REGENERATION  TOWER  

2012   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

TO  PERFORM  REPLACEMENT  WORK  FOR  IA  AND  N2  PIPE  LINE  UNDER  LIN/LOX  TANK  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

C-­‐701  MIDDLE  SECTION  REPLACEMENT  AT  MTBE,  PLANT  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  SRA-­‐4  GAS  LIFT  F/LINE.  (MYSR),  SRA-­‐1  F/LINE  PROD.  (MYSR),  SDV-­‐150A  FLANGE.  (MYSA),  V-­‐250  WATER  OUTLET  PIPING.  (MYGA)  

Page 17: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2012   CENTRALISED  UTILITY  FACILITIES,  GEBENG   REPAIR  E2-­‐251B42  AIR  COOLER  

2012   CENTRALISED  UTILITY  FACILITIES,  KERTEH   4A905  &  4A906  NEW  BYPASS  LINE  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

FABRICATION  &  INTERNAL  COATING  FOR  SMALL  VESSEL  AT  PDH,  PLANT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

R-­‐4902  VESSEL  CLEANING  &  REPAIR  AT  NOZZLE  (2C)  STAGE  3  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

JEA/  PSR/  062,  059,  051,  050  &  066  SPOOL  REPLACEMENT  AT  F-­‐435  JERNEH-­‐A  

2012  ETHYLENE  MALAYSIA  SDN  BHD/  POLYETHYLENE  MALAYSIA  SDN  

BHD  TF-­‐0-­‐E-­‐002  BOG  PIPING  REPLACEMENT  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  G-­‐18  FLOWLINE  REPLACEMENT.  (MYSG)  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   C-­‐701  PARTIAL  SHELL  REPLACEMENT  

2012   CENTRALISED  UTILITY  FACILITIES,  KERTEH   4A905  PCV  BYPASS  LINE  AT  CUF,  KERTEH  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  OPEN  AND  CLEANING  R-­‐301B  MAIN  MTBE  REACTOR  -­‐  PHASE  II  

2012  ETHYLENE  MALAYSIA  SDN  BHD/  POLYETHYLENE  MALAYSIA  SDN  

BHD  

ET-­‐0V-­‐104  (SC-­‐104-­‐4)  WELDING  VALVE  1/2"  &  SAMPLE  COOLER  COIL  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

STEAM  TRAP  PIPE  SPOOL  RECTIFICATION  PROJECT  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  V-­‐422  CORR'D  PIPING.  (MYSA),  TO  FABRICATE  SPOOL  FOR  A-­‐20L.  (MYGA),  B-­‐5L.  (MYGB),  B-­‐14L.  (MYGB)  &  A-­‐21U.  (MYUA)  FLOWLINE  (IWS)  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

RECOVERING  DRAINING  BFW  TO  D-­‐1007  AT  MTBE,  PLANT  

Page 18: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   F-­‐302B  FILTER  REPLACEMENT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  OPEN  AND  CLEANING  R-­‐301A  MAIN  MTBE  REACTOR  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   INSITU  HYDROJETTING  CLEANING  FOR  R-­‐301A  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  GRAYLOC  HUB  PUP  PIECE,  3"S160,  A105N.  (MYGA),  (MYPA)  &  (MYUA)  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  RECTIFY  LEAK  AT  E-­‐3005  A  &  B  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   INTERNAL  COATING  FOR  P-­‐2003  COOLER  

2012   CENTRALISED  UTILITY  FACILITIES,  GEBENG   TO  MAKE  GOOD  MRO-­‐D,  DEMIN  PLANT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  REPLACE  FIRE  WATER  LEAK  PIPING  AT  PDH,  PLANT  (PHASE  II)  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  OPEN  AND  CLEANING  R-­‐301B  MAIN  MTBE  REACTOR  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  A-­‐14L  FLOWLINE  REPLACEMENT.  (MYTA),  TO  FABRICATE  SPOOL  FOR  PSV-­‐895  BY  PASS  LINE.  (MYSA)  

2012  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

PRODUCED  WATER  TREATMENT  CAPACITY  UPGRADED  PROJECT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TO  RECTIFY  LEAK  AT  E-­‐4903  PDH,  PLANT  

2012  ETHYLENE  MALAYSIA  SDN  BHD/  POLYETHYLENE  MALAYSIA  SDN  

BHD  TO  SERVICE  CHAIN  BLOCK  (OVERHEAD  CRANE)  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC   V-­‐110  BRIDGE  SPOOL  REPLACEMENT  (MYTA)  

Page 19: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  REPAIR  OF  FIRE  PROOFING  AT  AREA-­‐200  MTBE,  PLANT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

CCR  EMERGENCY  SHUTDOWN  JUNE  2012  AT  MTBE,  PLANT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  REPLACE  STRUCTURE  AT  EA-­‐1703  A/B  AT  PORT  STORAGE,  PLANT  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  CORRODED  GRATING  AT  PRODUCTION  DECK  (MYLR)  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  REPLACE  PVC  PIPE,  FITTINGS  &  STRAINER  AT  PC1407  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  REPLACE  PIPING  AT  PC-­‐1409A  AT  AREA-­‐400  MTBE,  PLANT  

2012  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  PERINTIS  SHUTDOWN  JUNE  2012  

2012   FPSO  VENTURES  SDN  BHD   CHEMICAL  INJECTION  PIPE  SPOOL  MODIFICATION  AT  FPSO  BUNGA  KERTAS  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

FABRICATE  &  INSTALL  SPOOL  &  BALL  VALVE  AT  Z-­‐1001  MTBE,  PLANT  

2012  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  FABRICATE  NEW  STEEL  PIPE  FOR  DELUGE  &  FOAM  HEADER  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

FABRICATION  &  INSTALLATION  OF  CONDENSATE  DRAIN  LINE  PIPING  AT  E-­‐3005  PDH,  PLANT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   PPM  MINI  SHUTDOWN  APRIL  2012  

2012  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  MANPOWER  FOR  RIGGING  DURING  UWILD  

2012  ETHYLENE  MALAYSIA  SDN  BHD/  POLYETHYLENE  MALAYSIA  SDN  

BHD  LIFTING  EQUIPMENT  REVALIDATION  (002)  

Page 20: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2012  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  FABRICATE  NEW  16"  SPOOL  STEEL  FOR  HT  COOLER  PIPE  LINE  LOWER  PLATFORM  IN  ENGINE  ROOM  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  SPOOL  FOR  PCP  A-­‐05/A-­‐12  &  A-­‐15  (MYTA),  A-­‐19U  (MYTA),  F-­‐11  GL  (MYSF)  AND  F-­‐24  GL  (MYSF)  F/LINE  REPLACEMENT  

2012   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

TO  PERFORM  AIR  COOLER  TUBE  PLUGGING  AT  CUF,  GEBENG  

2012  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  6"  CRUDE  LINE  REPLACEMENT  

2012   CENTRALISED  UTILITY  FACILITIES,  KERTEH   MOC  LP  GAN  PIPELINE  ASU-­‐2  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  REPLACE  B-­‐7L,  B-­‐7U,  B-­‐5L  &  B-­‐5U  AT  MYMB  PLATFORM  

2012   CENTRALISED  UTILITY  FACILITIES,  GEBENG   TO  PERFORM  BELLOW  REPLACEMENT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  PERFORM  BLASTING  ON  TX-­‐1  INNER  SCREEN  (LCP)  AT  PDH  PLANT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

SUPPLY  &  INSTALL  STEAM  TRACING  AT  EB-­‐234  AREA  200  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   RECTIFY  FIRE  WATER  LEAK  AT  PDH  PLANT  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

RECTIFICATION  OF  DEFECT  ITEMS  DURING  MTBE  PLANT  SHUTDOWN  2012  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

TO  FABRICATE  STEEL  BOX  AND  TEMPORARY  HOSE  FOR  J701  

2012  ETHYLENE  MALAYSIA  SDN  BHD/  POLYETHYLENE  MALAYSIA  SDN  

BHD  HOSE  TESTING  REVALIDATION  (002)  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

FABRICATION  &  INSTALLATION  OF  PIPING  FOR  NEW  ALFA  LAVAL  (HEAT  EXCHANGER)  UNIT  

Page 21: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  GRATING  FOR  CELLAR  DECK  PLATFORM  (MYGD)  

2012   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  2”  PIPE  SPOOL  FOR  EQUALIZATION  NORTH  AND  SOUTH  HEADER  (MYGD)  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

LOADING  &  UNLOADING  RASCHING  RING  AT  C-­‐103  

2012   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

FABRICATION  &  INSTALLATION  OF  LOT  VAPORIZER  PIPING  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD  

2”  LINE  FOR  CONDENSATE  DRAIN  OUTLET  AT  AREA  300  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   TEMPORARY  PVC  LINE  TO  FURTURE  300  

2012   PETRONAS  CHEMICALS  MTBE  SDN  BHD   2”  METHANOL  LINE  FOR  TRUCK  LOADING  

2011  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

INSTALLATION  OF  NEW  VSAT  ANTENNA  AT  FPSO  PERINTIS  

2011   CENTRALISED  UTILITY  FACILITIES,  KERTEH  

STRUCTURE  REPAIR  WORKS  FOR  CLARIFIER  B  AT  CUF,  KERTEH  

2011   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

1-­‐1/2"  BYPASS  AT  V-­‐522  (MYJA),  GENERATOR  FUEL  GAS  (MYTD)  &  PUMP  P-­‐120B  CASING  DRAIN  VALVE  (MYTP)  -­‐  FABRICATION  WORKS  

2011   MTBE  (M)  SDN  BHD   PO  3  TO  PO  4  CPVC  LINE  REPLACEMENT  

2011   MTBE  (M)  SDN  BHD   PPM  REACTOR  WORKS  -­‐  OPEN  &  CLEANING  

2011   MTBE  (M)  SDN  BHD   HEAT  TRACING  FOR  HEVIES  BUNKER  PIPING  

2011   MTBE  (M)  SDN  BHD   EB-­‐215  FLANGE  REFURBISHMENT  

Page 22: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2011   MTBE  (M)  SDN  BHD   FABRICATION  &  INSTALLATION  OF  HEVIES  BUNKER  PIPING  

2011   EXXONMOBIL  EXPLORATION  AND  PRODUCTION  MALAYSIA  INC  

TO  FABRICATE  PIPE  SPOOL  FOR  DRAIN  LINE  HEADER  LEAK  (MYIA)  -­‐  EXXONMOBIL  

2011   MTBE  (M)  SDN  BHD   RECTIFICATION  WORK  FOR  FIRE  WATER  LINE  LEAK  

2011   POLYPLASTICS  ASIA  PACIFIC  SDN  BHD  

HEAT  SOURCE  EXCHANGE  FROM  LS  TO  LLS  FOR  H.2601,  H.2701,  H.2801  &  H.3801  

2011   MTBE  (M)  SDN  BHD   FLANGE  BUILD  UP  &  RE-­‐FACING  THE  REGENERATION  HEATER  EB-­‐0215  

2011   MTBE  (M)  SDN  BHD   RE-­‐TUBING  WORKS  FOR  U1201B  AIR  COOLER  

2011   MTBE  (M)  SDN  BHD   STEAM  TRAP  INSTALLATION  AT  PDH  

2011   MTBE  (M)  SDN  BHD   REMOVE  HEATER  PLUG  AT  F-­‐2002  

2011   CENTRALISED  UTILITY  FACILITIES,  GEBENG  

TO  REPAIR  FLANGE  LEAK  AT  UNIT  A  DEARATOR  HEAD  AND  VESSEL  

2011   MTBE  (M)  SDN  BHD   PDH  STEAM  ISOLATION  VALVE  REPLACEMENT  

2011   MTBE  (M)  SDN  BHD   INSTRUMENT  AIR  PIPING  MIGRATION  AND  NEW  N2  HEADER  AT  PORT  STORAGE  

2011   MTBE  (M)  SDN  BHD  

MECHANICAL  AND  PLANT  DEFECT  RECTIFICATION  WORKS  DURING  MMSB/PPMSB  PLANT  AND  PORT  STORAGE  SHUTDOWN  APRIL  2011  (PHASE  III)  

2011   MTBE  (M)  SDN  BHD   PIPING  WORKS  FOR  DIB  BOTTOM  PROJECT  

2011   MTBE  (M)  SDN  BHD   EB112  &  EB114  BUNDLE  REPLACEMENT  

Page 23: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2011  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  PERINTIS  SHUTDOWN  2011  

2011  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

GAS  COMPRESSOR  COOLING  WATER  LINE  AND  CRACKED  PIPE  SPOOL  MCSW  PUMP  IN  ENGINE  ROOM  

2011  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  SUPPLY  OF  MANPOWER  –  M3NERGY  

2011   MTBE  (M)  SDN  BHD   RX1  INNER  AND  OUTER  SCREEN  MODIFICATION  

2011   MTBE  (M)  SDN  BHD  

MECHANICAL  AND  PLANT  DEFECT  RECTIFICATION  WORKS  DURING  MMSB/PPMSB  PLANT  AND  PORT  STORAGE  SHUTDOWN  APRIL  2011  (PHASE  II)  

2011   MTBE  (M)  SDN  BHD   STEAM  LINE  REPLACEMENT  

2011   MTBE  (M)  SDN  BHD   TIE-­‐IN  FOR  PC-­‐203AB  

2011   MTBE  (M)  SDN  BHD   BLINDING  DEBLINDING  FOR  E-­‐2001B  AT  PDH  PLANT  

2011   MTBE  (M)  SDN  BHD   SPOOL  FOR  PPM  PSV  INSTALLATION  

2011   MTBE  (M)  SDN  BHD   SUPPLY  OF  3”,  80,  A53-­‐B,  SQ,  12M  PIPE  

2011   MTBE  (M)  SDN  BHD   MTBESD0411  :  VALVE  TESTING  

2011  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  CAMLOCK  REPAIR  RATU  SONGKHLA  

2011   MPE  LINDUNG  SDN  BHD   WELDING  WORKS  &  NDT  MOULD  REPAIR  

2011   MTBE  (M)  SDN  BHD   REPAIR  OF  C-­‐0103  NOZZLE  CRACK  

Page 24: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2011   MTBE  (M)  SDN  BHD   FABRICATION  OF  PPM  DUMPSTER  

2011   MTBE  (M)  SDN  BHD   TO  PERFORM  HPWJ  CLEANING  FOR  IRIS  EB-­‐902  

2011   MTBE  (M)  SDN  BHD  INSTALLATION  OF  FILTER  PACKAGES  AND  INTERFACING  FACILITY  CONSTRUCTION  FOR  MTBE  PLANT  AND  PORT  STORAGE  

2011   MTBE  (M)  SDN  BHD  

MECHANICAL  AND  PLANT  DEFECT  RECTIFICATION  WORKS  DURING  MMSB/PPMSB  PLANT  AND  PORT  STORAGE  SHUTDOWN  APRIL  2011  

2011  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  TO  FABRICATE  SEA  CHEST  STRAINER  

2011  ETHYLENE  MALAYSIA  SDN  BHD/  POLYETHYLENE  MALAYSIA  SDN  

BHD  HOSE  TESTING  REVALIDATION  (001)  

2011  ETHYLENE  MALAYSIA  SDN  BHD/  POLYETHYLENE  MALAYSIA  SDN  

BHD  LIFTING  EQUIPMENT  REVALIDATION  (001)  

2011   MTBE  (M)  SDN  BHD   MTBE  SD0411  COOLING  WATER  BYPASS  LINE  

2011   MTBE  (M)  SDN  BHD   FABRICATION  &  INSTALLATION  OF  F-­‐4006  PIPING  SYSTEM  

2010   MTBE  (M)  SDN  BHD  PIPING  FABRICATION  (EPCC  FOR  REPLACEMENT  TURBINE  METER  WITH  CORIOLIS  AT  MTBE  METERING  STATION)  

2010   NAN  ACECON  SDN  BHD/  PETRONAS  GAS  BERHAD  

FABRICATION  &  INSTALLATION  OF  CUF  HANDRAIL  MONKEY  LADDER  &  TRASH  TRAP  

2010   MTBE  (M)  SDN  BHD   PPM  PIPING  REPLACEMENT  (3/4”-­‐HPN-­‐40N01-­‐D12A)  

2010   MTBE  (M)  SDN  BHD   FABRICATION  &  INSTALLATION  OF  MANUAL  DAMPING  SPOOL  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  TO  FABRICATE  SEA  CHEST  STRAINER  

Page 25: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

SUPPLY  MANPOWER  &  EQUIPMENT  FOR  THE  PARTIAL  SHUTDOWN  2010  

2010   MTBE  (M)  SDN  BHD   PPM  TEAL  LINE  REPLACEMENT  

2010   MTBE  (M)  SDN  BHD   TO  REPLACE  PR-­‐2”-­‐11172-­‐17  790  LINE  AT  PORT  STORAGE  C/W  GLASSFLAKE  COATING  

2010   SIME  ENGINEERING  SDN  BHD  MECHANICAL  WORKS  FOR  SEGAMAT  COMPRESSOR  STATION  EXPANSION  PROJECT  (SHUTDOWN  WORK  ON  29  AUGUST  2010)  

2010   SIME  ENGINEERING  SDN  BHD  

PROVISION  OF  SUPPLY  AND  DELIVER  MANPOWER,  TOOLS,  EQUIPMENTS,  CONSUMABLES  AND  MACHINERIES  FOR  POST  SHUTDOWN  WORK  ACTIVITIES  FOR  PIPING  AND  MECHANICAL  WORKS  AT  SEGAMAT  COMPRESSOR  STATION  EXPANSION  PROJECT.  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

PRE-­‐FABRICATION  OF  AIR  SUPPLY  LINE  AT  MALONG  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  PRE-­‐FABRICATION  OF  SOTONG  AIR  SUPPLY  LINE  

2010   SIME  ENGINEERING  SDN  BHD   MECHANICAL  WORKS  FOR  SEGAMAT  COMPRESSOR  STATION  EXPANSION  PROJECT  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

LOW  SEA  CHEST  26”  ANGLE  VALVE  REPLACEMENT  

2010   MTBE  (M)  SDN  BHD   RENTAL  OF  HPWJ  FOR  HEX.  CLEANING  AT  MTBE  

2010   MTBE  (M)  SDN  BHD   D-­‐1107,  PD-­‐1116A/B  &  T-­‐1107  PTFE  LINED  PIPING  REPLACEMENT  

2010   MTBE  (M)  SDN  BHD   EB-­‐115  PIPING  MODIFICATION  

2010   MTBE  (M)  SDN  BHD   FABRICATION  &  INSTALLATION  OF  PC-­‐206-­‐B  COVER  

Page 26: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2010   MTBE  (M)  SDN  BHD   FABRICATION  &  INSTALLATION  OF  SPOOLS  FOR  PARTICLE  SCREENING  AT  PPM  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

FABRICATION  &  INSTALLATION  OF  MALONG  WATER  INJECTION  PIPING  (80-­‐WI-­‐1458)  

2010   PETRONAS  CARIGALI  SDN  BHD  PROVISION  OF  CORRODED  PIPING  REPLACEMENT  (MCI  REPORT)  –  ONSHORE  FABRICATION  AT  BEKOK  B  FOR  PCSB-­‐PMO  

2010   MTBE  (M)  SDN  BHD   FABRICATION  &  INSTALLATION  FOR  SAMPLING  POINT  

2010   MTBE  (M)  SDN  BHD   HEAT  EXCHANGERS,  CONDENSERS  &  COOLER  (RENTAL  OF  HPWJ  HEX.  CLEANING)  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  PERINTIS  IN-­‐SITU  REFURBISHMENT  PHASE  2  

2010   MSET  ENGINEERING  CORPORATION  SDN  BHD  

INSTALLATION  OF  SEAWATER  FINE  FILTERS  F-­‐610A,  F-­‐610B  &  F-­‐610C  AT  FPSO  PERINTIS  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

INSTALLATION  OF  Y-­‐STRAINER  &  BASKET  STRAINER  AT  SOTONG  PLATFORM  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  MALONG  WATER  INJECTION  PROJECT  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

INSTALLATION  OF  Y-­‐STRAINER  &  BASKET  STRAINER  AT  MALONG  PLATFORM  

2010   MTBE  (M)  SDN  BHD   10”  PIPING  MODIFICATION  EB-­‐230  

2010   MTBE  (M)  SDN  BHD   PPM  PORTABLE  WATER  PIPING  REPLACEMENT  PHASE  2  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

PERINTIS  IN-­‐SITU  REFURBISHMENT  PROJECT  PHASE  1  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

INSTALLATION  OF  DECK  PLATE  ENGINE  ROOM  PHASE  2  

Page 27: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2010  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  MALONG  FUEL  GAS  LINE  PROJECT  

2010   MTBE  (M)  SDN  BHD  HEAT  EXCHANGER,  BUNDLES  &  VESSELS  INSTALLATION  DURING  MTBE  MINI  SHUTDOWN  FEBRUARY  2010  

2010   MTBE  (M)  SDN  BHD   D-­‐105  PIPING  REPLACEMENT  

2010   MTBE  (M)  SDN  BHD   FABRICATION  &  INSTALLATION  OF  S-­‐107  COOLING  COIL  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  INSTALLATION  OF  COW  MACHINE  

2009   MTBE  (M)  SDN  BHD   PROJECT  1638  EB-­‐0902  PIPING  INSTALLATION  WORKS  

2009   MTBE  (M)  SDN  BHD   FABRICATION  OF  NEW  PPM  STEAM  INJECTION  PIPE  AT  MTBE  PLANT  

2009   MTBE  (M)  SDN  BHD   REPLACE  6”  DEFECT  SPOOL  AT  PORT  STORAGE  MTBE  PLANT  

2009   MTBE  (M)  SDN  BHD   T-­‐1708  PROPYLENE  LINE  REPLACEMENT  PROJECT  

2009   MTBE  (M)  SDN  BHD   REPLACE  1”  DEFECT  PIPE  AT  PDH  SHUTDOWN  2009  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

FABRICATION  &  INSTALLATION  OF  12”  COW  LINE  REPLACEMENT  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

REPLACE  BADLY  CORRODED  DECK  PLATFORM  ENGINE  ROOM  MAIN  FLOOR  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

FABRICATION  &  INSTALLATION  OF  2  UNITS  OF  TG-­‐AIR  GUIDE  

2009   ALLIED  CALIBRATION  ENGINEERING  SERVICES  SDN  BHD  

INSTALLATION  OF  DRY  GAS  SEAL  AND  ITS  ANCILLARIES  PROJECT  

Page 28: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2009   MTBE  (M)  SDN  BHD   HEAT  EXCHANGER  (4NOS)  CLEANING  AT  PORT  STORAGE  MTBE  

2009   MTBE  (M)  SDN  BHD   INSTALLATION  OF  NEW  HEAT  EXCHANGER  AT  PORT  STORAGE  MTBE  

2009   MTBE  (M)  SDN  BHD   TIE-­‐INS  POINT  FOR  CCR  O2  ANALYZER  PROJECT  

2009   MTBE  (M)  SDN  BHD   PPM  PORTABLE  WATER  PIPING  REPLACEMENT  

2009   MTBE  (M)  SDN  BHD   D1107  &  T1107  PTFE  LINE  REPLACEMENT  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

ADDITIONAL  JOB  DURING  SHUTDOWN  AND  POST  SHUTDOWN  

2009   MTBE  (M)  SDN  BHD   PIPING  REPLACEMENT  PROJECT  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

FABRICATE  &  INSTALL  PIPE  SPOOL  FOR  ANDING  PLATFORM  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  FABRICATE  &  INSTALLATION  FOR  COW  LINE  REPLACEMENT  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

INSTALLATION  TF7630  TO  NEW  LOCATION  (TRANSFER  NEW  TRANSFORMER)  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  FABRICATE  &  INSTALL  PIPE  SPOOLS  FOR  MALONG  TEST  SEPARATOR  DRAIN  LINE  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  SUPPLY  MANPOWER  &  MATERIALS  FOR  JOB  CODE  PD13  &  PD12  FOR  PERINTIS  ANNUAL  SHUTDOWN  2009  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  X-­‐104  LAUNCHER  REPAIR  

2009   MTBE  (M)  SDN  BHD   RES  1569  –  DGS  PLATFORM  CONSTRUCTION  

Page 29: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  FABRICATE  &  INSTALL  MALONG  WATER  INJECTION  PIPE  SPOOLS  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  REPAIR  AND  FABRICATE  NEW  DOUBLING  RING  SC90T2  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  TO  REPAIR  HYDROCYCLONE  LINERS  

2009   MTBE  (M)  SDN  BHD   BLINDING  &  DEBLINDING  FOR  PDH  EMERGENCY  SHUTDOWN  2009  

2009   MTBE  (M)  SDN  BHD   FLANGE  MACHINING  FOR  EB-­‐215  

2009   MTBE  (M)  SDN  BHD   BOLT  TIGHTENING  WORKS  FOR  PPM  EMERGENCY  SHUTDOWN  2009  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  CONSTRUCTION  WORK  PACK  CS  #4.0  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

CONSTRUCTION  WORK  PACK  FOR  SHUTDOWN  2009  –  WORK  PACK  CS  #5.0  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  TO  REMOVE  &  INSTALL  26”  SEA  CHEST  VALVE  

2009  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

FPSO  PERINTIS  SHUTDOWN  2009  (FIRE  WATER  LINE)  

2009   MTBE  (M)  SDN  BHD   REPLACE  6”  DEFECT  PIPE  (MTBE  LINE)  AT  AREA  600  

2009   MTBE  (M)  SDN  BHD   WELDING  DUPLEX  STAINLESS  STEEL  

2009   MTBE  (M)  SDN  BHD   PPM  EMERGENCY  SHUTDOWN  FEBRUARY  2009  

2009   MTBE  (M)  SDN  BHD   TIE-­‐INS  WORK  DURING  MTBE  SHUTDOWN  FEBRUARY  2009  

Page 30: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2009   MTBE  (M)  SDN  BHD   RECTIFICATION  OF  DEFECT  ITEMS  DURING  MTBE  SHUTDOWN  FEBRUARY  2009  

2009   MTBE  (M)  SDN  BHD   REPAIR  OF  WATER  GATE  VALVE  INTERNAL  THREAD  BLOCK  

2008   MTBE  (M)  SDN  BHD   REPAIR  OF  D-­‐1005  

2008   MTBE  (M)  SDN  BHD   ½”  TEAL  LINE  REPLACEMENT  

2008   MTBE  (M)  SDN  BHD   ½”  &  ¾”  TEAL  LINE  DOUBLE  BLOCK  VALVE  INSTALLATION  

2008   MTBE  (M)  SDN  BHD   2”  &  3”  CAUSTIC  &  OILER  PTFE  LINE  REPLACEMENT  

2008  DONALDSON  FILTRATION  

(MALAYSIA)  SDN  BHD  /  MTBE  (M)  SDN  BHD  

TO  SUPPLY  MATERIAL,  MANPOWER,  EQUIPMENT  AND  CONSUMABLES  (PIPING,  CIVIL  &  E&I  WORK)  FOR  INSTALLATION  OF  WATER  CHILLER  FOR  WATER  COMPOUNDING  BATH  AT  PPMSB  

2008   MTBE  (M)  SDN  BHD   MMSB/  PPMSB  PIPING  REPLACEMENT  (UTILITY  WATER  LINE)  

2008   MTBE  (M)  SDN  BHD   MMSB/  PPMSB  PIPING  REPLACEMENT  (NEUTRALIZATION  LINE)  

2008  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  INSTALLATION  OF  BOILER  DECK  PIPING  

2008  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  FABRICATION  &  INSTALLATION  OF  BOILER  DECK  PIPING  

2008   PETRONAS  GAS  BERHAD   INSTALLATION  OF  METHANOL  INJECTION  CARBON  STEEL  PIPING  AT  GPP  5  &  GPP  6  

2008  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

CONSTRUCTION  WORK  FEBRUARY  2008  SHUTDOWN  OFFSHORE  INSTALLATION  

Page 31: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2008  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

CONSTRUCTION  WORK  FEBRUARY  2008  SHUTDOWN  –  FABRICATION  WORK  

2008   MTBE  (M)  SDN  BHD  VARIOUS  PIPING  REPLACEMENT  &  MACHINING  WORKS  FOR  PLANT  MAINTENANCE  DURING  PLANT  TURNAROUND  2008  

2008   MTBE  (M)  SDN  BHD   VARIOUS  RES  (PIPE  EXTENSION)  MTBE  TURNAROUND  2008  

2008   MTBE  (M)  SDN  BHD   FABRICATION  &  INSTALLATION  FOR  T1107  DRAIN  PIPING  REPLACEMENT  

2008   MTBE  (M)  SDN  BHD  FABRICATION  &  INSTALLATION  FOR  CAUSTIC  RETURN  FROM  CCR  TO  BATTERY  LIMIT  PIPING  REPLACEMENT  

2007   FPSO  VENTURES  SDN  BHD  

PROVISION  WORK  TO  SUPPLY  OF  MANPOWER  TO  CARRYOUT  THE  MEASUREMENT  AND  ISOMETRIC  DRAWING  AS  FOLLOW  SCOPE  OF  WORK  FOR  FSO  CENDOR  

2007   MTBE  (M)  SDN  BHD   FABRICATION  &  INSTALLATION  FOR  T1  TO  T2  PIPE  UPGRADING  

2007   MTBE  (M)  SDN  BHD  FABRICATION,  INSTALLATION,  TESTING  AND  COMMISSIONING  FOR  UTILITY  WATER  PIPING  A520  

2007  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  PRE-­‐FABRICATION  OF  GALLEY  PIPING  

2007  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

PRE-­‐FABRICATION  AND  INSTALLATION  OF  CHAIN  ROLLER  AT  FSO  PUTERI  CAKERAWALA  

2007  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

FABRICATION,  INSTALLATION,  TESTING  AND  COMMISSIONING  OF  PIPING  AND  STRUCTURE  FOR  FPSO  PERINTIS  SHUTDOWN  2007  

2007  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

SUPPLY  OF  MANPOWER,  EQUIPMENT,  TOOLS  AND  CONSUMABLES  FOR  PERINTIS  SHUTDOWN  2007  

2007  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

SITE  SURVEY  &  STRINGING  AND  PREPARATION  OF  NEW  AND  DEMOLITION  DRAWING  

2007  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  SUPPLY  MANPOWER,  TOOLS  AND  CONSUMABLES  TO  PERFORM  BLASTING  &  PRIMER  AND  PIPE  BEND  

Page 32: LIST!OF!COMPLETED!PROJECTS:!FABRICATION,!INSTALLATION!&!MAINTENANCE! …€¦ ·  · 2015-11-09emergentworkathrsgifsteam%boiler% ... blinding%jobs%forhrsgf%preservation% 2013%

02/05/2014    

LIST  OF  COMPLETED  PROJECTS:  FABRICATION,  INSTALLATION  &  MAINTENANCE  (ONSHORE  &  OFFSHORE)  

 

YEAR   CLIENT   PROJECT  

2007  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

TO  PROVIDE  MANPOWER,  EQUIPMENT,  TOOLS  AND  CONSUMABLES  FOR  FABRICATION  OF  PIPE  SPOOLS  (ONSHORE)  

2006  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

FABRICATION  OF  NEW  P-­‐600  DISCHARGE  LINE  SPOOLS  FOR  WATER  INJECTION  PIPING  

2006  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

SERVICING  OF  PRESSURE  SAFETY  RELIEF  VALVE  FOR  DECK  BOILER  

2006  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

FABRICATION  OF  PIPE  SPOOL  FOR  METERING  CRUDE  OIL  FACILITIES  

2006  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  SERVICING  OF  12”  GLOBE  VALVE  PROJECT  

2006  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

SERVICES  &  REPAIR  OF  LAUNCHER  DOOR  PROJECT  

2006  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

CHEMICAL  CLEANING  &  HYDROTEST  HYDRAULIC  PIPING  

2006  M3NERGY  FPSO  PERINTIS  SDN  BHD  /  PETRONAS  CARIGALI  SDN  

BHD  

FABRICATION  OF  4”  6”  AND  8”  DELUGE  PIPING  SPOOLS