Lean Construction

Muhammad Abdullah Alvi

Primavera Workshop

UNIVERSITY OF ENGINEERING AND TECHNOLOGY TAXILA

PAKISTAN

What do we mean by LEAN and

CONSTRUCTION ????????

LEAN….

Systematic Method for the Elimination of Wastes

Construction…. Construction means to build anything. There are many type of

constructions like

Buildings Construction

Bridges Construction

Railways Construction

Dams/Barrages Construction

Roads Construction

What do we mean by CONSTRUCTION

PROJECT ????????

Characterization of Construction IndustryDifferent Construction Categories

Different Workplace/Workstations

Nature of Sites (Multi-employer/Environment)

Physical Work

Special Trades

Teamwork

Construction Project PhasesThere are 4 distinct phases of

Construction Projects

Conceive•Owners Need Statement.•Establishment of General Requirements.•Feasibility and Impact Study.•Conceptual Design.

Develop•Preliminary Design.•Detailed Design.

Construction Project Phases….

Execute• Assign

Construction Team.

• Procurement.• Onsite Planning.• Construction.• Commissioning.

Finish• Commissioning.

• Training.

Construction Management….

Construction Management is defined as the judicious allocation of resources to finish a project on time, at budget, and at desired quality…

COST

QUALITYTIME

A long running joke in the industry has been that you can only get two out of these three attributes

What do we mean by LEAN CONSTRUCTION ???????

?

LEAN CONSTRUCTION…. Schematic reduction in wastes during the Construction of a Project

is known as Lean Construction.

Project Management~ Process of Controlling “Main Sail and Rudder.Production Management~ Trimming the Front Jib Sail and Balancing the Boat.

LEAN CONSTRUCTION= Project Management + Production Management

CONSTRUCTION WASTES….

Correction/Re-work Performing work out of

sequence Waiting for design comments Inefficient construction

methods Marshalling of materials on-site

Redundant design/construction processes

Lack of “JIT” construction practices Inefficient teamwork/communication Slowdown/stoppage in work processes

There are different types of Construction Wastes. In Construction Management these wastes are known as CURT.

TIME

TIMEWASTED TIME IS OUT OF CONTROL !!!!!

WASTED TIME…

PRODUCTIVE TIME….

47%57%

CONSTRUCTION

Productive Time Waste

LEAN CONSTRUCTION….

Refined Definition…. “A way to design production systems to minimize waste of materials,

time, and effort in order to generate the maximum possible amount of value."

Common Practice• Project Planning and Controlling is done…

What Needed is!!• Production Planning and Controlling…

PROCESS….

Reduces Waste Saves Money and Reduces Cost Creates Higher Quality Creates Flexible Delivery

Systems to Match Owner Requirements

Creates Stable Schedules Reliable Material Deliveries and Reliable

Workforce Promotes Employee Participation, Which

Leads to Satisfaction Improves Customer Satisfaction Requires a Cultural Change

It is a process in which a Manager tries to achieve the following milestones.

Why

Before searching for the answer of the aforementioned Question…. It is necessary to understand following terms.

LEAN CONSTRUCTION is Required???WASTE

• Waste is usually what reduces VALUE VALUE

• Value for the CLIENT is produced by their assessment of the deliverable when it is delivered.

Trade-off• A trade-off is a situation that

involves losing one quality or aspect of something in return for gaining another quality or aspect.

LEAN CONSTRUCTION allows you to arrive at all your Goals without a Trade-off.

There can be following types of Trade-off. Time Safety Quality Cost Sustainability Participant Satisfaction

Cont….

LEAN CONSTRUCTION TECHNIQUES…. Work is structured throughout the process to maximize value and to

reduce waste-at the project delivery level. The facility and its delivery process are designed together to better

reveal and support customer purposes. Efforts to manage and improve performance are aimed at improving

total project performance, because this is more important than reducing the cost or increasing the speed of any particular activity.

"Control" is redefined from "monitoring results" to "making things happen." The performance of the planning and control systems are measured and improved.

Cont….

Lean Design and Construction is particularly useful on complex, uncertain and quick projects.

It challenges the belief that there must always be trade-offs between time, cost, and quality.

AFTER LEAN CONSTRUCTION

QUESTIONS???

THANK YOU FOR YOUR ATTENTION!